写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

Survey

Upload dates
Title
2013.4.16 Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.12 Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.4.10 Replacement of a High Integrity Container (HIC) of the Multi-nuclide Removal Equipment at Fukushima Daiichi Nuclear Power Station
2013.4.9 Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.3.27 Report of Inspection Results of the First Dry Storage Cask at Fukushima Daiichi Nuclear Power Station
2013.3.25 Progress of Investigation of Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station
2013.3.20 Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station (As of 4:30 PM on March 20)
2013.3.19 Results of Investigation of the Inside of Unit 2 PCV
2013.3.15 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.14 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.13 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.6 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.5 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.1 Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation
2013.2.22 Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
2013.2.22 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 2)
2013.2.21 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 1)
2013.2.21 Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18)
2013.2.15 Investigation of the fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station(Video on Nov 30, 2012)
2013.2.14 Drilling Holes for the Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.2.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.13 Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.7 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.1.28 Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2012.12.13 Completion of inspection of the structures in Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.12.11 Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.11.29 Results of the Third Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.11.28 Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.11.27 Investigation Results of Suspension of Unit 3 Spent Fuel Pool Desalination System (Mobile RO) and Hydrochloric Acid Leakage at Fukushima Daiichi Nuclear Power Station
2012.11.26 Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
2012.11.21 Investigation of the Inside of Unit 4 Suppression Chamber at Fukushima Daini Nuclear Power Station
2012.11.1 Investigation Results of Smoke Coming out from Electric Motors in the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.10.24 Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13)
2012.10.15 Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
2012.10.12 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.11 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.10 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.3 Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.10.1 Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station
2012.9.27 Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
2012.9.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.9.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.9.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.9.24 Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.9.13 Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima
2012.9.6 Inspection of the Inside of the Treated Water Buffer Tank
2012.8.30 Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.8.29 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.28 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.7.13 Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.7.13 【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.12 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
2012.7.11 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.6 Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
2012.7.5 Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
2012.7.5 “Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
2012.6.27 Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012)
2012.6.14 Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
2012.6.12 Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
2012.6.7 Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
2012.6.7 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
2012.5.30 Site Investigation Result of the Accumulated Water Found at Unit 3 Radiation Waste Underground Storage Facility Building At Fukushima Daiichi Nuclear Power Station (May 28-29)
2012.5.25 【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building
2012.5.24 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
2012.4.20 【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19 Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
2012.4.18 Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
2012.4.17 Overveiw of the Robot(Survey Runner)
2012.4.16 【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.13 Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.3.30 Sampling of fish and shellfish on the ocean area within 20km of Fukushima Daiichi Nuclear Power Station
2012.3.27 Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
2012.3.27 【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.23 Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
2012.3.22 Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
2012.3.22 Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2012.3.16 The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.12 Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
2012.3.12 Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.28 Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
2012.2.10 Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port
2012.1.30 Fukushima Daiichi Nuclear Power Station; Investigation results of the bottom of the sea in front of Units 5-6 Water Intakes
2012.1.28 The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.19 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.18 Inspection Status at Minami-iwaki Switching Station
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.12 Status of inspection work of the main turbine of Unit 4
2011.12.27 Results of Boring and Trenching Survey on Yunotake Fault
2011.12.14 Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
2011.12.1 Nuclide analysis results of ocean soil - inside the Port entrance of Fukushima Daiichi Nuclear Power Plant
2011.11.25 Fukushima Daiichi Nuclear Power Station Operation of Unmanned Survey Ship
2011.11.22 Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
2011.11.21 Status of investigation on Yunotake Fault (quick report)
2011.11.21 Start of operation of unmanned investigation boat Fukushima Daiichi Nuclear Power Station
2011.11.18 Current Status of Tsunami Sediments Study Around the Coast of Kashiwazaki Kariwa Nuclear Power Station The First Day of Investigation (November 15, 2011) Investigation in Miyagawa, Kashiwazaki
2011.11.16 Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.10 Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.11.8 Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.11.5 Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.2 Overview of the blocking operation of the units 1 - 4 openings
2011.10.22 Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station
2011.10.21 Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Isolation Condenser of Unit 1, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
2011.10.15 Result of temperature measurement by infrared camera from right above the reactor
2011.10.14 Survey results of pipe penetration on 1st floor of Unit 1 reactor building
2011.10.4 Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.9.28 JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
2011.9.13 Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
2011.9.12 A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.8.30 Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
2011.8.30 Checking inside of the reactor containment vessel of Unit 4, Fukushima Daini Nuclear Power Station
2011.8.25 Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling
2011.7.28 Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
2011.7.27 Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
2011.7.16 Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
2011.7.2 Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
2011.6.30 Results of Investigation on 5th Floor of the Reactor Building Unit 4
2011.6.23 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.6.20 Robot:Quince
2011.6.20 Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.6.15 Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.14 Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.11 Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.8 The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
2011.6.4 Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
2011.5.24 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.12 Inspection Status of the Indicator (Water level indicator A, fuel area) at Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.10 Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.5.8 Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.5.6 Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.5.3 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Movies taken from T-Hawk
2011.4.27 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.17 Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.4.15 Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station