2013.4.16
|
Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.4.12
|
Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
|
|
2013.4.10
|
Replacement of a High Integrity Container (HIC) of the Multi-nuclide Removal Equipment at Fukushima Daiichi Nuclear Power Station
|
|
2013.4.9
|
Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.27
|
Report of Inspection Results of the First Dry Storage Cask at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.25
|
Progress of Investigation of Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.20
|
Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station (As of 4:30 PM on March 20)
|
|
2013.3.19
|
Results of Investigation of the Inside of Unit 2 PCV
|
|
2013.3.15
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.14
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.13
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.6
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.5
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.1
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation
|
|
2013.2.22
|
Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
|
|
2013.2.22
|
Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 2)
|
|
2013.2.21
|
Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 1)
|
|
2013.2.21
|
Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18)
|
|
2013.2.15
|
Investigation of the fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station(Video on Nov 30, 2012)
|
|
2013.2.14
|
Drilling Holes for the Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station
|
|
2013.2.13
|
Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.2.13
|
Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.2.7
|
Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
|
|
2013.1.28
|
Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
|
|
2012.12.13
|
Completion of inspection of the structures in Unit 4 reactor at Fukushima Daini Nuclear Power Station
|
|
2012.12.11
|
Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2012.12.11
|
Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
|
|
2012.11.29
|
Results of the Third Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2012.11.28
|
Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
|
|
2012.11.27
|
Investigation Results of Suspension of Unit 3 Spent Fuel Pool Desalination System (Mobile RO) and Hydrochloric Acid Leakage at Fukushima Daiichi Nuclear Power Station
|
|
2012.11.26
|
Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
|
|
2012.11.21
|
Investigation of the Inside of Unit 4 Suppression Chamber at Fukushima Daini Nuclear Power Station
|
|
2012.11.1
|
Investigation Results of Smoke Coming out from Electric Motors in the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
|
|
2012.10.24
|
Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Daiichi Nuclear Power Station
|
|
2012.10.15
|
Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13)
|
|
2012.10.15
|
Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
|
|
2012.10.12
|
Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
|
|
2012.10.11
|
Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
|
|
2012.10.10
|
Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
|
|
2012.10.3
|
Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
|
|
2012.10.3
|
Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
|
|
2012.10.1
|
Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station
|
|
2012.9.27
|
Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
|
|
2012.9.26
|
Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
|
|
2012.9.25
|
Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
|
|
2012.9.24
|
Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
|
|
2012.9.24
|
Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
|
|
2012.9.13
|
Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima
|
|
2012.9.6
|
Inspection of the Inside of the Treated Water Buffer Tank
|
|
2012.8.30
|
Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2012.8.29
|
Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
|
|
2012.8.28
|
Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
|
|
2012.7.13
|
Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station
|
|
2012.7.13
|
【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
|
|
2012.7.12
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
|
|
2012.7.11
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
|
|
2012.7.6
|
Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
|
|
2012.7.5
|
Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
|
|
2012.7.5
|
“Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
|
|
2012.6.27
|
Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012)
|
|
2012.6.14
|
Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
|
|
2012.6.12
|
Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
|
|
2012.6.7
|
Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
|
|
2012.6.7
|
The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
|
|
2012.5.30
|
Site Investigation Result of the Accumulated Water Found at Unit 3 Radiation Waste Underground Storage Facility Building At Fukushima Daiichi Nuclear Power Station (May 28-29)
|
|
2012.5.25
|
【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building
|
|
2012.5.24
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
|
|
2012.4.20
|
【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
|
|
2012.4.19
|
Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
|
|
2012.4.19
|
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
|
|
2012.4.18
|
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
|
|
2012.4.17
|
Overveiw of the Robot(Survey Runner)
|
|
2012.4.16
|
【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
|
|
2012.4.13
|
Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
|
|
2012.3.30
|
Sampling of fish and shellfish on the ocean area within 20km of Fukushima Daiichi Nuclear Power Station
|
|
2012.3.27
|
Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
|
|
2012.3.27
|
【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
|
|
2012.3.26
|
Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
|
|
2012.3.23
|
Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
|
|
2012.3.22
|
Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
|
|
2012.3.22
|
Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
|
|
2012.3.16
|
The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
|
|
2012.3.16
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
|
|
2012.3.15
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
|
2012.3.14
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
|
2012.3.12
|
Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
|
|
2012.3.12
|
Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station
|
|
2012.3.2
|
Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
|
|
2012.2.28
|
Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
|
|
2012.2.10
|
Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port
|
|
2012.1.30
|
Fukushima Daiichi Nuclear Power Station; Investigation results of the bottom of the sea in front of Units 5-6 Water Intakes
|
|
2012.1.28
|
The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
|
|
2012.1.21
|
The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
|
|
2012.1.20
|
Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
|
|
2012.1.19
|
Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
|
|
2012.1.18
|
Inspection Status at Minami-iwaki Switching Station
|
|
2012.1.18
|
Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
|
|
2012.1.12
|
Status of inspection work of the main turbine of Unit 4
|
|
2011.12.27
|
Results of Boring and Trenching Survey on Yunotake Fault
|
|
2011.12.14
|
Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
|
|
2011.12.1
|
Nuclide analysis results of ocean soil - inside the Port entrance of Fukushima Daiichi Nuclear Power Plant
|
|
2011.11.25
|
Fukushima Daiichi Nuclear Power Station Operation of Unmanned Survey Ship
|
|
2011.11.22
|
Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
|
|
2011.11.21
|
Status of investigation on Yunotake Fault (quick report)
|
|
2011.11.21
|
Start of operation of unmanned investigation boat Fukushima Daiichi Nuclear Power Station
|
|
2011.11.18
|
Current Status of Tsunami Sediments Study Around the Coast of Kashiwazaki Kariwa Nuclear Power Station The First Day of Investigation (November 15, 2011) Investigation in Miyagawa, Kashiwazaki
|
|
2011.11.16
|
Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2011.11.10
|
Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
|
|
2011.11.8
|
Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
|
2011.11.5
|
Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2011.11.2
|
Overview of the blocking operation of the units 1 - 4 openings
|
|
2011.10.22
|
Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station
|
|
2011.10.21
|
Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
|
|
2011.10.21
|
Isolation Condenser of Unit 1, Fukushima Daiichi Nuclaer Power Station
|
|
2011.10.21
|
Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
|
|
2011.10.15
|
Result of temperature measurement by infrared camera from right above the reactor
|
|
2011.10.14
|
Survey results of pipe penetration on 1st floor of Unit 1 reactor building
|
|
2011.10.4
|
Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
|
|
2011.9.28
|
JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
|
|
2011.9.13
|
Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
|
|
2011.9.12
|
A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station
|
|
2011.8.30
|
Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
|
|
2011.8.30
|
Checking inside of the reactor containment vessel of Unit 4, Fukushima Daini Nuclear Power Station
|
|
2011.8.25
|
Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling
|
|
2011.7.28
|
Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
|
|
2011.7.27
|
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
|
|
2011.7.16
|
Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
|
|
2011.7.2
|
Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
|
|
2011.6.30
|
Results of Investigation on 5th Floor of the Reactor Building Unit 4
|
|
2011.6.23
|
Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
|
|
2011.6.20
|
Robot:Quince
|
|
2011.6.20
|
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
|
|
2011.6.15
|
Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
|
|
2011.6.14
|
Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
|
|
2011.6.11
|
Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
|
|
2011.6.8
|
The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
|
|
2011.6.4
|
Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
|
|
2011.5.24
|
Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station
|
|
2011.5.19
|
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
|
|
2011.5.17
|
Fukushima Daiichi Nuclear Power Station Current status of restoration work
|
|
2011.5.12
|
Inspection Status of the Indicator (Water level indicator A, fuel area) at Unit 1, Fukushima Daiichi Nuclear Power Station
|
|
2011.5.10
|
Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
|
|
2011.5.8
|
Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station
|
|
2011.5.6
|
Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
|
|
2011.5.3
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.29
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.29
|
The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
|
|
2011.4.28
|
Robot, Truck etc.
|
|
2011.4.27
|
Movies taken from T-Hawk
|
|
2011.4.27
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.20
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
|
|
2011.4.19
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
|
|
2011.4.17
|
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
|
|
2011.4.16
|
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
|
|
2011.4.15
|
A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
|
|
2011.4.15
|
Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
|