写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

August 2012

Upload dates
Title
2012.08.30 Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.08.30 The Soundness of Unit 4 Reactor Building and Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.08.29 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.08.28 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.08.27 Installation of multi-nuclide removal equipment
2012.08.23 Videos on Entering/Exiting Fukushima Daiichi Nuclear Power Station and Checking of Dosimeter and Wearing Tyvek (Prototype with the Chest Area Being Transparent) at the Exit of the Main Anti-earthquake Building
2012.08.21 Nuclide Analysis Results of Fish and Shellfish(Greenling)
2012.08.17 Water Leakage from the Desalination System (Reverse Osmosis Membrane) 3
2012.08.14 White Smoke Coming out of the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.08.14 Water Leakage in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.08.10 Removal of PCV Lid from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.08.09 Reliability Improvement of the Second Cesium Absorption Apparatus
2012.08.09 Overview of our TV Conference System
2012.08.08 Result of Investigation on Unit 1 Operating Floor at Fukushima Daiichi Nuclear Power Station
2012.08.06 Footage of TEPCO's TV conference
2012.08.03 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: July 2012)