2011.10.29 Circumstances of the accident when dismantling a large-size crane
2011.10.29 Series of Explanatory Videos Vol.2 No.2
2011.10.28 Ancillary facilities for cover panels of Unit 1(Completion of Cover Construction at Reactor Building of Unit 1 of Fukushima Daiichi NPS)
2011.10.27 Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
2011.10.24 Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.22 Series of Explanatory Videos Vol.2 No.1
2011.10.22 Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station
2011.10.22 Report from the site of Fukushima Daiichi Nuclear Power Station
2011.10.21 Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Isolation Condenser of Unit 1, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
2011.10.15 Series of Explanatory Videos Vol.1 No.4
2011.10.15 Result of temperature measurement by infrared camera from right above the reactor
2011.10.15 Current Situation of Fukushima Daiichi Nuclear Power Plant in Pictures -J Village Edition
2011.10.15 "On-site Practicesite Practice", training of emergency countermeasures for safety at Fukushima Daini Nuclear Power Station
2011.10.14 Completion of installing the roof panel of the cover for the reactor building at Unit 1
2011.10.14 Survey results of pipe penetration on 1st floor of Unit 1 reactor building
2011.10.12 Water injection practice at Fukushima Daiichi Nuclear Power Station
2011.10.11 Overview of dust sampling at the openings of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.8 Installation Work of Roof Panels for Reactor Building Covers at Unit 1 of Fukushima Daiichi Nuclear Power Plant
2011.10.8 Situation of Upper Part of Unit 1 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.8 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.7 View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.10.7 View of the cut trees from the northwest of Unit 5 and 6, Fukushima Daiichi Nuclear Power Plant
2011.10.4 Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.1 Series of Explanatory Videos Vol.1 No.3
2011.10.1 Overview of Dust Collector System