写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2014
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2015
      • Jan
      • Feb
      • Mar
      • Apr
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2014
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2015
      • Jan
      • Feb
      • Mar
      • Apr
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • Kashiwazaki Kariwa Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos
New Topics
RSS
Upload dates
Title
2015.4.21 Stop of Water Transfer Pump from K Drainage Channel to C Drainage Channel in Fukushima Daiichi Nuclear Power Station
2015.4.21 IAEA Experts Sent to Fukushima Daiichi Nuclear Power Station for Inspection
2015.4.20 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"- Results of follow up check after the site test "Investigation B1"on grating around the pedestal inside Unit 1 PCV - [Report for April 18 and April 19, 2015]
2015.4.17 (4/20 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - [Prompt report for April 16, 2015]
2015.4.16 (4/17 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -[Prompt report for April 15]
2015.4.14 Members of Japan Chamber of Commerce and Industry (JCCI)@ Kashiwazaki-Kariwa NPS
2015.4.13 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" -Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV-
2015.4.10 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"‐Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV‐(Prompt report of inspection commencement on April 10, 2015)
2015.4.7 United States Nuclear Regulatory Commission (U.S.NRC) Chairman, Stephen G.Burns visited Fukushima Daiichi Nuclear Power Station
2015.4.1 Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle)
2015.3.30 Smoke from a Roadside Ditch on the Premises of Fukushima Daiichi Nuclear Power Station
2015.3.24 Fire on the bank of the road on the west side of Units 5 and 6 in the premises of Fukushima-Daiichi Nuclear Power Station