このページではjavascriptを使用しています。
Releases ・ Announcements
Site Map
Service Guide
Online Service Request
Customer Support
FAQ
Customer Inquiries
Thermal
Hydroelectric
Nuclear
Renewable Energies
Power Supply & Network
Fuels
Corporate Overview
Investor Relations
International Activities
Procurement
Overseas Consultancy Services
R&D
General Inquiries
Media Contacts
Investor Relations Inquiries
Procurement Inquiries
Customer Inquiries
Consultancy Inquiries
Photos and Videos Library
・
Fukuichi live camera
・
Videos
April 2012
Upload dates
Title
2012.4.27
Regarding leakage from water desalination (reverse osmosis membrane) 2
2012.4.27
The installation of gate monitor in connection with switchover of Fukushima Daiichi Nuclear Power Station’s Seismic Isolated Building to “Uncontrolled”
2012.4.27
The situation of trial operation of screening and decontamination area for vehicles at Fukushima Daiichi Nuclear Power Station
2012.4.26
Regarding the treatment of certain areas of the Seismic isolated building of the Fukushima Daiichi Nuclear Power Station as “Uncontrolled area”
2012.4.24
【Video】Visitation of Fukushima Daiichi Nuclear Power Station by Mr. Nakatsuka (Deputy Minister of Cabinet Office)
2012.4.23
Fukushima Daiichi Nuclear Power Station Visitation of Mr. Nakatsuka, Senior Vice Minister of Cabinet Office
2012.4.20
Improvement of Environment around Monitoring Post of Fukushima Daiichi Nuclear Power Station (Result Report)
2012.4.20
Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time
2012.4.20
Fukushima Daiichi Nuclear Power Station Case example of the Improvement of Environment around Monitoring Post
2012.4.20
【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19
Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
2012.4.18
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
2012.4.17
Overveiw of the Robot(Survey Runner)
2012.4.16
General Plan and Start of Main Work of the Cover for Fuel Removal of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.4.16
【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.16
Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.4.13
Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.9
Countermeasures against expansion of leakage between SPT(B)and Water Desalinations (reverse osmosis membrane)
2012.4.5
Water leakage point at concentrated water storage tank area of water desalinations (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station