写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

December 2011

Upload dates
Title
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.3 Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.12 Status of inspection work of the main turbine of Unit 4
2011.12.29 Water leakage (freshwater) from a hose of the water desalinations (reverse osmosis membrane system) near the concentrated water storage area at Fukushima Daiichi Nuclear Power Station
2011.12.24 Unit 3 of Fukushima Daiichi Nuclear Power Station Swelling of Water Injection Hose to Reactor
2011.12.21 Installation of Temporary Storage for Cesium Adsorption Tower
2011.12.20 Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
2011.12.19 Accumulated water in the trench between Process Main Building and Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in the Centralized Radiation Waste Treatment Facility at Fukushima Daiichi Nuclear Power Station
2011.12.17 Discussions at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the 6th floor of Unit 1 reactor building at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the main control room of Unit 1 and 2 at Fukushima Daini Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daini Nuclear Power Plant
2011.12.17 Discussions at Fukushima Daiichi Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daiichi Nuclear Power Plant
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.12.13 Leakage from Sampling Line of Evaporative Concentration System 3 C
2011.12.8 Emergency Security Measures "Nighttime Training" Conducted on Dec. 7
2011.12.6 Outflow of water leaked from the evaporative condensation apparatus at Fukushima Daiichi Nuclear Power Station
2011.12.5 Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags
2011.12.4 Leakage from evaporative condensation apparatus
2011.12.3 Series of Explanatory Videos Vol.2 No.3