このページではjavascriptを使用しています。
Releases ・ Announcements
Site Map
Service Guide
Online Service Request
Customer Support
FAQ
Customer Inquiries
Thermal
Hydroelectric
Nuclear
Renewable Energies
Power Supply & Network
Fuels
Corporate Overview
Investor Relations
International Activities
Procurement
Overseas Consultancy Services
R&D
General Inquiries
Media Contacts
Investor Relations Inquiries
Procurement Inquiries
Customer Inquiries
Consultancy Inquiries
Photos and Videos Library
・
Fukuichi live camera
・
Videos
Unit5
Upload dates
Title
2013.4.8
Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.2.18
Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.1
Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.12.25
Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.12.11
Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.5
Inspection Results of Unit 5 Residual Heat Removal System Seawater Pump (C) at Fukushima Daiichi Nuclear Power Station
2012.12.3
National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.10.10
An Issue Found with the Minimum Flow Rate Bypass Valve of Unit 5 Reactor Core Spray System (B) at Fukushima Daiichi Nuclear Power Station
2012.10.1
Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station
2012.9.11
(18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11
(17)Unit 5 Transformer Area
2012.9.11
(16)Unit 5 and 6 Switchyard Area (Outside)
2012.9.11
(14)Inside the Unit 5 Power Source Room
2012.9.11
(13)Inside the Unit 5 and 6 Vertical Shafts
2012.9.11
(11)Inside the Unit 5 and 6 Transmission Board Room
2012.9.11
(10)Inside the Unit 5 and 6 Main Control Room
2012.9.11
(9)Sea side area of Unit 5 and 6
2012.7.25
Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.1.26
Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.20
Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.18
Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2011.10.24
Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.8
Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7
View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.9.24
Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.17
Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.9
Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.8
Enhancement of medical services at Fukushima Daiichi NPS
2011.8.10
Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.7.3
Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
2011.6.2
Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.5.31
Oil slick near the cartain wall of the Unit 5 and 6
2011.5.17
Fukushima Daiichi Nuclear Power Station Current status of restoration work