写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2014
      • Jan
      • Feb
      • Mar
      • Apr
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2014
      • Jan
      • Feb
      • Mar
      • Apr
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • Kashiwazaki Kariwa Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)

Upload dateFeb 1,2013

Photo

▼Download 

 

(01) Appearance of Unit 3 Reactor Building after explosion(ZIP:5MB)

 Photo taken on 2011.3.15

(02) Appearance of Units 1-4 Reactor Buildings (1)(ZIP:1MB)

 Photo taken on 2011.3.15

(03) Appearance of Unit 2 Reactor Building (1)(ZIP:6MB)

 Photo taken on 2011.3.15

(04) Conditions around Units 3-4 (1)(ZIP:21MB)

 Photo taken on 2011.3.16

(05) Conditions around Units 5-6 and the seaside area(ZIP:13MB)

 Photo taken on 2011.3.17

(06) Conditions of the Dry Cask Storage Building (1)(ZIP:5MB)

 Photo taken on 2011.3.17

(07) Water discharge into Unit 3 Reactor Building (1)(ZIP:31MB)

 Photo taken on 2011.3.17

(08) Appearance of Unit 2 Reactor Building (2)(ZIP:221KB)

 Photo taken on 2011.3.18

(09) Appearance of Units 3-4 Reactor Buildings(ZIP:447KB)

 Photo taken on 2011.3.18

(10) Conditions around Units 1-4 (1)(ZIP:11MB)

 Photo taken on 2011.3.18

(11) Water discharge into Unit 3 Reactor Building (2)(ZIP:5MB)

 Photo taken on 2011.3.18

(12) Conditions inside and around the Auxiliary Operation Shared Facility (Common Pool Building)(ZIP:32MB)

 Photo taken on 2011.3.18-19

(13) Conditions of around Units 3-4 and the Central Radioactive Waste Treatment Facility(ZIP:33MB)

 Photo taken on 2011.3.19

(14) Conditions of the Dry Cask Storage Building (2)(ZIP:45MB)

 Photo taken on 2011.3.19

(15) Conditions around Units 1-4 (2)(ZIP:2MB)

 Photo taken on 2011.3.19

(16) Water discharge into Unit 3 Reactor Building (3)(ZIP:39MB)

 Photo taken on 2011.3.20

(17) Conditions of area near the seaside of Units 5-6(ZIP:3MB)

 Photo taken on 2011.3.20

(18) Conditions inside the power station site (1)(ZIP:7MB)

 Photo taken on 2011.3.20

(19) Conditions of area near Unit 4(ZIP:8MB)

 Photo taken on 2011.3.21

(20) Smoke coming out of Unit 3 Reactor Building(ZIP:595KB)

 Photo taken on 2011.3.21

(21) Conditions of area around Unit 4 Reactor Building and preparation for water discharge(ZIP:3MB)

 Photo taken on 2011.3.22

(22) Preparation for water discharge into Unit 4 Reactor Building (1)(ZIP:1MB)

 Photo taken on 2011.3.22

(23-a) Conditions of the seaside area of Units 1-4(ZIP:40MB)

(23-b) Conditions of the seaside area of Units 1-4(ZIP:37MB)

 Photo taken on 2011.3.22

(24) Water discharge into Unit 4 Reactor Building(ZIP:1014KB)

 Photo taken on 2011.3.22

(25) Accumulated water in Units 5-6 Reactor Building basement(ZIP:53MB)

 Photo taken on 2011.3.22

(26) Conditions inside Unit 4 Turbine Building(ZIP:816KB)

 Photo taken on 2011.3.22

(27) Lighting condition in Unit 3 Central Control Room(ZIP:10MB)

 Photo taken on 2011.3.22

(28) Conditions around Units 1-4 and the Central Radioactive Waste Treatment Facility(ZIP:4MB)

 Photo taken on 2011.3.23

(29) Conditions inside the power station site and Units 1-4(ZIP:1MB)

 Photo taken on 2011.3.23

(30) Conditions around Units 3-4 (2)(ZIP:418KB)

 Photo taken on 2011.3.23

(31) Appearance of Units 1 and 3 Reactor Buildings(ZIP:21MB)

 Photo taken on 2011.3.23-24

(32) Conditions inside the power station site and Unit 1(ZIP:38MB)

 Photo taken on 2011.3.24

(33) Conditions near Unit 3 (1)(ZIP:1MB)

 Photo taken on 2011.3.24

(34) Conditions of the seaside area of Units 1-4 (2)(ZIP:12MB)

 Photo taken on 2011.3.24

(35) Conditions around Unit 1 (1)(ZIP:9MB)

 Photo taken on 2011.3.24

(36) Conditions around Unit 3 (2)(ZIP:2MB)

 Photo taken on 2011.3.25

(37) Conditions around Unit 1 (2)(ZIP:625KB)

 Photo taken on 2011.3.25

(38) Conditions of the shallow draft quay (1)(ZIP:457KB)

 Photo taken on 2011.3.25

(39) Conditions of the shallow draft quay (2)(ZIP:25MB)

 Photo taken on 2011.3.26

(40) Conditions inside the power station site (2)(ZIP:965KB)

 Photo taken on 2011.3.26

(41) Conditions of the shallow draft quay (3)(ZIP:35MB)

 Photo taken on 2011.3.27

(42) Conditions inside the power station site (3)(ZIP:17MB)

 Photo taken on 2011.3.28

(43) Conditions inside the power station site (4)(ZIP:26MB)

 Photo taken on 2011.3.28

(44) Conditions around Unit 4 and the Central Radioactive Waste Treatment Facility(ZIP:46MB)

 Photo taken on 2011.3.28-29

(45) Seawater intake from the shallow draft quay utilizing a hyper rescue fire engine(ZIP:18MB)

 Photo taken on 2011.3.29

(46) Development of road to access Units 1-2 Switchyard(ZIP:25MB)

 Photo taken on 2011.3.29

(47) Conditions inside the Administration Office Building(ZIP:13MB)

 Photo taken on 2011.3.29

(48) Conditions around the Central Radioactive Waste Treatment Facility and the seaside area of Units 1-4(ZIP:29MB)

 Photo taken on 2011.3.29

(49) Appearance of Units 1-4 Reactor Buildings (2)(ZIP:748KB)

 Photo taken on 2011.3.29

(50) Conditions of the seaside area of Units 3-4 and the entrance of trench vertical shaft(ZIP:1MB)

 Photo taken on 2011.3.29

(51-a) Conditions inside the power station site (4) (ZIP:40MB)

(51-b) Conditions inside the power station site (4) (ZIP:44MB)

 Photo taken on 2011.3.30

(52) Completion of the shallow draft quay development(ZIP:506KB)

 Photo taken on 2011.3.30

(53) Conditions of area around Units 1-2 switchyard(ZIP:2MB)

 Photo taken on 2011.3.30

(54) Highly radioactive debris found around Unit 1 Reactor Building(ZIP:17MB)

 Photo taken on 2011.3.31

(55) Barge vessel entering the port(ZIP:3MB)

 Photo taken on 2011.3.31

(56) Conditions of area around the Central Radioactive Waste Treatment Facility(ZIP:57MB)

 Photo taken on 2011.3.31

(57) Conditions of area around the Solid Waste Storage(ZIP:596KB)

 Photo taken on 2011.3.31

(58) Conditions of the former Administration Office Building and around Unit 1 nitrogen tank(ZIP:13MB)

 Photo taken on 2011.4.1

(59) Protection of the hose installed across the road in the seaside area of Unit 4(ZIP:3MB)

 Photo taken on 2011.4.1

(60) Conditions of the seaside area of Unit 4 and the entrance of trench vertical shaft(ZIP:9MB)

 Photo taken on 2011.4.1

(61a) Spraying anti-scattering agent (1)(ZIP:43MB)

(61b) Spraying anti-scattering agent (1)(ZIP:43MB)

(61c) Spraying anti-scattering agent (1)(ZIP:43MB)

(61d) Spraying anti-scattering agent (1)(ZIP:41MB)

 Photo taken on 2011.4.1

(62) Conditions of the area in the power station site where landslide occurred(ZIP:17MB)

 Photo taken on 2011.4.1

(63) Checking the heavy load truck(ZIP:3MB)

 Photo taken on 2011.4.1

(64) Images of the upper part of Unit 1 Reactor Building taken by a camera installed on the concrete pump car (1)(ZIP:451KB)

 Photo taken on 2011.4.1

(65) Images of the upper part of Unit 1 Reactor Building taken by a camera installed on the concrete pump car (2)(ZIP:87KB)

 Photo taken on 2011.4.2

(66) Debris removal around Units 1-2 switchyard(ZIP:15MB)

 Photo taken on 2011.4.2

(67) Water discharge into Units 1(ZIP:19MB)

 Photo taken on 2011.4.2

(68) Conditions of area around Unit 4 Turbine Building(ZIP:4MB)

 Photo taken on 2011.4.2

(69) Measures to prevent contaminated water leakage near Unit 2 water intake channel (1)(ZIP:22MB)

 Photo taken on 2011.4.2

(70) Measures to prevent contaminated water leakage near Unit 2 water intake channel (2)(ZIP:60MB)

 Photo taken on 2011.4.3

(71) Preparation for debris removal utilizing a remote-control heavy machinery(ZIP:9MB)

 Photo taken on 2011.4.3

(72) Measures to prevent contaminated water leakage near Unit 2 water intake channel (3)(ZIP:32MB)

 Photo taken on 2011.4.4

(73) Conditions of the breakwaters and embankments in the power station site(ZIP:33MB)

 Photo taken on 2011.4.4

(74) Conditions of the seaside of Unit 4 and the seawater pipe duct(ZIP:1MB)

 Photo taken on 2011.4.4

(75) Measures to prevent contaminated water leakage near Unit 2 water intake channel (4)(ZIP:1MB)

 Photo taken on 2011.4.5

(76) Conditions of work site near the Central Radioactive Waste Treatment Facility(ZIP:343KB)

 Photo taken on 2011.4.5

(77) Preparation for water discharge into Unit 4 Reactor Building (2)(ZIP:19MB)

 Photo taken on 2011.4.5

(78) Images of the upper part of Unit 4 Reactor Building taken by a camera installed on the concrete pump car and conditions of water discharge(ZIP:2MB)

 Photo taken on 2011.4.5

(79) Measures to prevent contaminated water leakage near Unit 2 water intake channel (Coagulant injection)(ZIP:34MB)

 Photo taken on 2011.4.5~6

(80) Completion of Measure implementation to prevent contaminated water leakage near Unit 2 water intake channel(ZIP:28MB)

 Photo taken on 2011.4.6

(81) Debris removal utilizing a remote-control heavy machinery (1)(ZIP:58MB)

 Photo taken on 2011.4.6-7

(82) Cable running across the road after being cut(ZIP:11MB)

 Photo taken on 2011.4.6-7

(83) Spraying anti-scattering agent(ZIP:10MB)

 Photo taken on 2011.4.7

(84) Conditions inside the power station site (5)(ZIP:23MB)

 Photo taken on 2011.4.7

(85) Conditions of area near the pure water tank(ZIP:46MB)

 Photo taken on 2011.4.2,3,7

(86) Conditions after implementing measures to prevent contaminated water outflow near Unit 2 water intake channel (1)(ZIP:10MB)

 Photo taken on 2011.4.8

(87) Conditions of area around Units 3-4 (3)(ZIP:28MB)

 Photo taken on 2011.4.8

(88) Spraying anti-scattering agent (2)(ZIP:4MB)

 Photo taken on 2011.4.8

(89) Preparation for silt fence installation(ZIP:11MB)

 Photo taken on 2011.4.9

(90) Conditions of the outdoor trench connected with the Central Radioactive Waste Treatment Facility (1)(ZIP:6MB)

 Photo taken on 2011.4.9

(91) Conditions of the Deep Well(ZIP:892KB)

 Photo taken on 2011.4.9

(92) Conditions after implementing measures to prevent contaminated water outflow near Unit 2 water intake channel (2)(ZIP:2MB)

 Photo taken on 2011.4.10

(93) Conditions of the outdoor trench connected to the Auxiliary Operation Shared Facility (Common Pool Building)(ZIP:3MB)

 Photo taken on 2011.4.10

(94) Debris removal utilizing a remote-control heavy machinery(ZIP:2MB)

 Photo taken on 2011.4.10

(95) Conditions of the outdoor trench connected to the Central Radioactive Waste Treatment Facility (2)(ZIP:2MB)

 Photo taken on 2011.4.10

(96) Silt fence installation(ZIP:4MB)

 Photo taken on 2011.4.11

(97) Conditions of the entrance of trench vertical shaft in the seaside area of Unit 4(ZIP:1MB)

 Photo taken on 2011.4.11

(98) Blocking the trench vertical shaft in the seaside of Unit 2(ZIP:2MB)

 Photo taken on 2011.4.11

(99) Debris removal utilizing a remote-control heavy machinery (2)(ZIP:34MB)

 Photo taken on 2011.4.10-11

Photo taken by Tokyo Electric Power Company

Links

Category

Search by status/measures

Status of the accident / Cooling of reactors / Mitigation of radioactive materials / Work / Others

Pickup

Effect of tsunami / 1st week after March 11