2013.4.16
|
Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.4.9
|
Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.13
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.6
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2013.3.5
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2012.12.11
|
Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
|
2012.12.11
|
Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
|
|
2012.11.28
|
Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
|
|
2012.11.26
|
Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
|
|
2012.7.12
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
|
|
2012.7.5
|
Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
|
|
2012.7.5
|
“Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
|
|
2012.6.14
|
Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
|
|
2012.5.25
|
【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building
|
|
2012.5.24
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
|
|
2012.4.19
|
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
|
|
2012.4.18
|
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
|
|
2012.4.17
|
Overveiw of the Robot(Survey Runner)
|
|
2012.3.22
|
Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
|
|
2012.2.28
|
Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
|
|
2011.11.22
|
Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
|
|
2011.11.16
|
Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2011.11.5
|
Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
|
2011.10.21
|
Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
|
|
2011.10.21
|
Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
|
|
2011.10.15
|
Result of temperature measurement by infrared camera from right above the reactor
|
|
2011.9.28
|
JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
|
|
2011.7.28
|
Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
|
|
2011.7.27
|
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
|
|
2011.7.16
|
Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
|
|
2011.7.2
|
Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
|
|
2011.6.30
|
Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
|
|
2011.6.24
|
Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
|
|
2011.6.20
|
Robot:Quince
|
|
2011.6.20
|
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
|
|
2011.6.4
|
Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
|
|
2011.5.10
|
Robots
|
|
2011.5.3
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.29
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.28
|
Robot, Truck etc.
|
|
2011.4.27
|
Movies taken from T-Hawk
|
|
2011.4.27
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
|
2011.4.20
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
|
|
2011.4.19
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
|
|
2011.4.17
|
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
|
|
2011.4.16
|
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
|
|
2011.4.15
|
A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
|