写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

January 2012

Upload dates
Title
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.3.9 Fukushima Daiichi Nuclear Power Station System Chart <before construction>
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.22 Installment of Small-sized Incinerator in Fukushima Daiichi Nuclear Power Station
2012.2.3 Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station
2012.2.1 Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station
2012.1.30 Fukushima Daiichi Nuclear Power Station; Investigation results of the bottom of the sea in front of Units 5-6 Water Intakes
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange of Mini Flow Piping of the Waste RO Supply Pump in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Vent Valve around the Normal Reactor Injection Pump (B) on the Hill (on Standby) in Fukushima Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.19 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.18 Inspection Status at Minami-iwaki Switching Station
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2012.1.10 Water leakage from the concentrated water tank of the water desalinations (reverse osmosis membrane)
2012.1.8 Circulating Cooling System for Spent Fuel Pool of Unit 4 in Fukushima Daiichi Nuclear Power Station Leakage of Filtered Water from Cooling Pipe of Air Fin Cooler