このページではjavascriptを使用しています。
Releases ・ Announcements
Site Map
Service Guide
Online Service Request
Customer Support
FAQ
Customer Inquiries
Thermal
Hydroelectric
Nuclear
Renewable Energies
Power Supply & Network
Fuels
Corporate Overview
Investor Relations
International Activities
Procurement
Overseas Consultancy Services
R&D
General Inquiries
Media Contacts
Investor Relations Inquiries
Procurement Inquiries
Customer Inquiries
Consultancy Inquiries
Photos and Videos Library
・
Fukuichi live camera
・
Videos
July 2012
Upload dates
Title
2013.03.04
Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2012.11.02
Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
2012.09.03
Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: August 2012)
2012.08.09
Reliability Improvement of the Second Cesium Absorption Apparatus
2012.08.03
Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: July 2012)
2012.07.27
Investigation Results of the Oil Leak from the Transformer at the Outdoor Hazardous-material Storage Tank at Fukushima Daiichi Nuclear Power Station
2012.07.25
Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.07.23
Fuel Oil Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station (Occurred on July 20)
2012.07.19
Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.07.17
Operational Commencement of the Refrigerators Installed by the Treatment Water Buffer Tank at Fukushima Daiichi Nuclear Power Station
2012.07.13
Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.07.13
【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.07.12
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
2012.07.11
Completion of Debris Removal from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.07.11
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.07.06
Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
2012.07.05
Emergency Training for Nitrogen Supply Equipment Abnormality at Fukushima Daiichi Nuclear Power Station
2012.07.05
Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
2012.07.04
TEPCO Chairman and President Visiting Fukushima Daiichi and Daini Nuclear Power Station
2012.07.03
Smoke Coming out of the Control Panel of the Compressed Air System (IA System) at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station (Follow-up)
2012.07.03
The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.07.02
Smoke Coming out from the Compressed Air System (IA system) Control Panel at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station