2011.7.31
|
Air leakage at Main Exhaust Stack of Unit 4, Fukushima Daini Nuclear Power Station
|
|
2011.7.30
|
Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4
|
|
2011.7.29
|
Rest area on the 2nd floor of Unit1/2 Service Building
|
|
2011.7.29
|
Rest area for construction of covers of Unit1 Reactor Building(Shimizu Corporation)
|
|
2011.7.28
|
Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
|
|
2011.7.27
|
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
|
|
2011.7.26
|
Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station
|
|
2011.7.26
|
The 2nd Cesium Adsorption Facility (SARRY)
|
|
2011.7.26
|
Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
|
|
2011.7.18
|
Fukushima Daiichi Nuclear Power Station Unit 3 Turbine Building Installation Work of Roof
|
|
2011.7.17
|
Appearance of the Roof for Countermeasure against Rainwater, Unit 3, Fukushima Daiichi
|
|
2011.7.16
|
Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
|
|
2011.7.14
|
Meeting Room at the Fhkushima Daiichi Stabilization Center
|
|
2011.7.12
|
The repaired part for chemical leakage of water treatment system(before/after repair)
|
|
2011.7.10
|
The repaired part for chemical leakage of water treatment system (coagulation settling facility)
|
|
2011.7.10
|
Chemical Injection Leakage Point in the Water Treatment Facility System (Coagulation Settling Equipment)
|
|
2011.7.9
|
Fukushima Daiichi Unit3 - Investigation result of nitrogen injection point at R/B
|
|
2011.7.7
|
Trial fitting of the cover for Unit 1, Fukushima Daiichi Nuclear Power Station at Onahama port
|
|
2011.7.6
|
Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station
|
|
2011.7.6
|
New Hirono Domitory
|
|
2011.7.5
|
Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
|
|
2011.7.4
|
Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building
|
|
2011.7.3
|
Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
|
|
2011.7.2
|
Status of establishing rest areas for workers
|
|
2011.7.2
|
Status of preparation for the countermeasures against heat stroke such as Cool Vest
|
|
2011.7.2
|
Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
|
|
2011.7.1
|
Fulfillment/reinforcement of medical establishment (Establishment of an emergency medical room)
|
|
2011.7.1
|
Central Load Dispatching office
|
|
2011.7.1
|
Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station
|
|
2011.7.1
|
Spent Fuel Pool in Reactor Building , Unit 4, Fukushima Daiichi Nuclear Power Station
|