写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

April 2011

Upload dates
Title
2011.4.29 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Movies taken from T-Hawk
2011.4.27 Forklift truck for removing rubble(source:Mitsubishi Heavy Industries, Ltd.)
2011.4.27 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.26 Remote-controlled crawler dump
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.18 Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
2011.4.17 Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
2011.4.16 a sandbag containing zeolite
2011.4.15 A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.4.15 Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.13 Cask for 38 fuel assembly BWR Type
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.11 Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)
2011.4.9 The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
2011.4.8 No title(uploaded on Apr 8,2011)
2011.4.7 Arrival of "Mega Float"
2011.4.6 Shutoff of water outflow was confirmed
2011.4.2 Near of the Sea Water intake of Unit2
2011.4.1 Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
2011.4.1 Dispersing Dust Protectant, Common Pool Area
2011.4.1 Water pumping using a concrete pumping car for Unit 4 of Fukushima Daiichi Nuclear Power Station