Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Fukushima Daiichi Nuclear Power Station

Upload dates
Title
2024.3.18 Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Non-Submerged Area) Status Inside the Pedestal
2024.3.13 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Director General Rafael Mariano Grossi
2024.2.19 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassadors of the IAEA board member states to Vienna
2024.1.31 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
2024.1.18 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
2024.1.10 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status
2023.11.21 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of Czech Republic to Japan, H.E. Mr. Martin Klucar
2023.11.17 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of Ireland to Japan, H.E. Mr. Damien Cole
2023.11.9 Visit to the Fukushima Daiichi Nuclear Power Station by the International Commission on Radiological Protection (ICRP)
2023.11.2 Fukushima Daiichi Nuclear Power Station The third discharge of ALPS treated water (Second Stage)
2023.10.31 Fukushima Daiichi Nuclear Power Station The third discharge of ALPS treated water (First Stage)
2023.10.25 Site visit to the Fukushima Daiichi Nuclear Power Station by the IAEA Task Force to conduct a review mission regarding the discharge of ALPS treated water
2023.10.20 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Deputy Director General Lydie Evrard
2023.10.12 International Atomic Energy Agency (IAEA) attended the sampling for the second discharge of ALPS treated water (Second Stage)
2023.10.12 International Atomic Energy Agency (IAEA) attended the sampling for the second discharge of ALPS treated water (First Stage)
2023.10.5 Fukushima Daiichi Nuclear Power Station the second discharge of ALPS treated water (Second Stage)
2023.10.3 Fukushima Daiichi Nuclear Power Station the second discharge of ALPS treated water (First Stage)
2023.8.24 Fukushima Daiichi Nuclear Power Station the Initial Discharge of ALPS Treated Water (Second Stage)
2023.8.23 International Atomic Energy Agency (IAEA) attended the first sampling for the initial discharge of ALPS treated water (First Stage)
2023.8.22 Fukushima Daiichi Nuclear Power Station Commencement of preparations for the initial discharge of ALPS treated water (First Stage)
2023.8.21 Visit to the Fukushima Daiichi Nuclear Power Station by the Prime Minister Fumio Kishida
2023.7.5 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Director General Rafael Mariano Grossi
2023.6.26 Work in removal of the shield arrival tube and installation of the discharge outlet caisson upper lid
2023.6.19 Visit to the Fukushima Daiichi Nuclear Power Station by the Delegation of Taiwanese Nuclear Experts
2023.6.13 Visit to the Fukushima Daiichi Nuclear Power Station by the President of the Republic of Palau, H.E. Mr. Surangel S. WHIPPS, Jr.
2023.6.13 Site visit to the Fukushima Daiichi Nuclear Power Station by IAEA officials to observe pre-service inspections of the facilities related to the discharge of ALPS treated water into the sea
2023.6.9 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of the Dominican Republic to Japan, H. E. Mr. Robert TAKATA
2023.6.6 Down-stream storage after completion of water filling
2023.6.2 Site visit to the Fukushima Daiichi Nuclear Power Station by the IAEA Task Force to conduct a comprehensive review mission regarding the planned discharge of ALPS treated water
2023.5.30 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassadors of Latin American
2023.5.26 Visit to the Fukushima Daiichi Nuclear Power Station by the Delegation of Republic of Korea Experts
2023.5.15 The delegation from the Directorate-General Energy (ENER), European Commission, visited the Fukushima Daiichi Nuclear Power Station
2023.5.9 The delegation from the high committee for transparency and information on nuclear safety (HCTISN) in France's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.27 The delegation from French Nuclear Safety Authority's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.26 Inside the discharge tunnel at the Fukushima Daiichi Nuclear Power Station
2023.4.26 The British Minister for Natural Environment and Land Use, Trudy Harrison's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.18 The Federal Minister for the Environment, Nature Conservation, Nuclear Safety, and Consumer Protection of Germany, Ms. Steffi Lemke's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.4 The Unit 1 Primary Containment Vessel (PCV) Internal Investigation (Using ROV-A2, Day 3, Part 2)
2023.3.17 International Special Advisors of NDF (Nuclear Damage Compensation and Decommissioning Facilitation Corporation)'s visit to the Fukushima Daiichi Nuclear Power Station
2023.3.13 Minister for Reconstruction Watanabe Hiromichi's visit to the Fukushima Daiichi Nuclear Power Station
2023.3.8 Komeito’s Chief Representative Natsuo Yamaguchi's visit to the Fukushima Daiichi Nuclear Power Station
2023.3.2 Pacific Islands Forum (PIF) secretariat and PIF experts' visit to the Fukushima Daiichi Nuclear Power Station
2023.2.14 Back filling of discharge outlet caisson Fukushima Daiichi Nuclear Power Station (Follow-up report)
2023.1.20 Visit of the IAEA Delegation for the Regulatory Review on the Handling of ALPS Treated Water at the Fukushima Daiichi Nuclear Power Station
2022.12.20 The OECD/NEA and nuclear regulatory authorities from various countries visited Fukushima Daiichi Nuclear Power Station
2022.12.8 Back filling of discharge outlet caisson Fukushima Daiichi Nuclear Power Station
2022.11.18 Installation of discharge outlet caisson Fukushima Daiichi Nuclear Power Station
2022.11.16 Inspection at the Fukushima Daiichi Nuclear Power Station by the IAEA officials for the Second Review of the Safety Aspects of ALPS Treated Water
2022.11.11 Governor of Fukushima prefecture, Uchibori Masao's visit to the Fukushima Daiichi Nuclear Power Station
2022.11.11 As a part of joint project :Collecting samples of seawater, etc. by IAEA and other authorities
2022.11.7 UK nuclear industry representatives' visit to the Fukushima Daiichi Nuclear Power Station
2022.10.19 The third observation of the sampling of ALPS treated water by IAEA review team at the Fukushima Daiichi Nuclear Power Station
2022.9.28 Minister for Reconstruction Kenya Akiba's visit to the Fukushima Daiichi Nuclear Power Station
2022.9.13 Fukushima Daiichi Nuclear Power Station Progress in the marine organisms rearing test (Start of Rearing test preparations)
2022.8.22 METI Minister Yasutoshi Nishimura’s visit to the Fukushima Daiichi Nuclear Power Station
2022.8.4 Commencement of Installation on ALPS Treated Water Dilution/Discharge Facility and Related Facilities at the Fukushima Daiichi Nuclear Power Station
2022.7.29 Irish Ambassador to Japan, H. E. Mr. Paul Kavanagh’s visit to the Fukushima Daiichi Nuclear Power Station
2022.7.21 Fukushima Daiichi Nuclear Power Station Progress in the marine organisms rearing test (Start of rearing practice in the mockup tanks)
2022.7.19 Chief Cabinet Secretary, Hirokazu Matsuno’s visit to the Fukushima Daiichi Nuclear Power Station
2022.5.23 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 19) at the Fukushima Daiichi Nuclear Power Station
2022.5.19 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 17 and 18) at the Fukushima Daiichi Nuclear Power Station
2022.5.19 IAEA Director General Grossi’s visit to the Fukushima Daiichi Nuclear Power Station
2022.5.6 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 3)
2022.4.25 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 2)
2022.4.25 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 1)
2022.4.13 Commencement of installation of large cover in preparation for the removal of spent fuel from Fukushima Daiichi Nuclear Power Station Unit 1 (Anchor drilling)
2022.3.30 Observation by IAEA review team of the sampling of ALPS treated water at the TEPCO Fukushima Daiichi Nuclear Power Station
2022.3.28 Taiwanese Government officials’ visit to the Fukushima Daiichi Nuclear Power Station
2022.3.24 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between March 14~16) at the Fukushima Daiichi Nuclear Power Station
2022.3.17 Commencement of training on marine organism rearing test Fukushima Daiichi Nuclear Power Station
2022.3.14 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (Preliminary report) at the Fukushima Daiichi Nuclear Power Station
2022.2.16 IAEA review team conducts field inspection during safety review of ALPS treated water (February 15) at the Fukushima Daiichi Nuclear Power Station
2022.2.10 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (As of February 10) at the Fukushima Daiichi Nuclear Power Station
2022.2.9 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (As of February 9) at the Fukushima Daiichi Nuclear Power Station
2022.2.8 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (Preliminary report) at the Fukushima Daiichi Nuclear Power Station
2021.12.20 Boring survey using SEP vessel (self-elevating platform) at the Fukushima Daiichi Nuclear Power Station (Part 2)
2021.12.15 Marine boring survey using SEP vessel (self-elevating platform) at the Fukushima Daiichi Nuclear Power Station
2021.12.14 SEP vessel (self-elevating platform) moving for the geological survey at the Fukushima Daiichi Nuclear Power Station
2021.12.3 The Nuclear Regulation Authority Chairman Fuketa’s visit to the Fukushima Daiichi Nuclear Power Station (December 2, 2021)
2021.11.30 Governor of Fukushima prefecture, Uchibori Masao’s visit to the Fukushima Daiichi Nuclear Power Station (November 30, 2021)
2021.11.19 H.E. Ms. Julia Margaret Longbottom, British Ambassador to Japan’s visit to the Fukushima Daiichi Nuclear Power Station
2021.11.17 Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA review mission to assess the safety of ALPS treated water
2021.10.17 Prime Minister, Fumio Kishida’s visit to the Fukushima Daiichi Nuclear Power Station (October 17, 2021)
2021.10.17 State Minister of Economy, Trade and Industry, Masahiro Ishii’s visit to the Fukushima Daiichi Nuclear Power Station (October 16, 2021)
2021.10.11 Minister of Economy, Trade and Industry, Koichi Hagiuda's visit to the Fukushima Daiichi Nuclear Power Station (October 10, 2021)
2021.3.23 President Kobayakawa's visit to Fukushima Daiichi Nuclear Power Station and speech to staff
2020.12.25 Governor of Miyagi prefecture, Yoshihiro Murai visits the Fukushima Daiichi Nuclear Power Station(December 24, 2020)
2020.12.22 Status of the Fukushima Daiichi Nuclear Power Station accident
2020.11.6 Governor of Fukushima Pref., Mr. Uchibori, visits the Fukushima Daiichi Nuclear Power Station (November 6, 2020)
2020.10.19 Minister of Economic Revitalization, Yasutoshi Nishimura’s visit to the Fukushima Daiichi Nuclear Power Station (October 18, 2020)
2020.10.19 Minister of Health, Labour and Welfare, Norihisa Tamura's, visit to the Fukushima Daiichi Nuclear Power Station (October 18, 2020)
2020.9.26 Prime Minister Yoshihide Suga’s visit to the Fukushima Daiichi Nuclear Power Station (September 26, 2020)
2020.9.15 Secondary Treatment Performance Confirmation Tests on ALPS-treated water at the Fukushima Daiichi Nuclear Power Station
2020.8.3 Unit 3 fuel removal work at the Fukushima Daiichi Nuclear Power Station
2020.6.11 Completion of the Internal Investigation of the Unit 2 Spent Fuel Pool (SFP) at the Fukushima Daiichi Nuclear Power Station
2020.6.11 Completion of air mortar injection into the Fukushima Daiichi Nuclear Power Station Unit 1 SFP cover bag
2020.6.10 Start of Internal Investigation of the Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool (SFP)
2020.5.13 Submersible ROV Operation Training in Preparation for the Unit 2 Spent Fuel Pool Internal Investigation at the Fukushima Daiichi Nuclear Power Station
2020.5.1 Completion of the Unit 1/2 exhaust stack dismantling at the Fukushima Daiichi Nuclear Power Station
2020.4.29 Dismantling of the Unit 1/2 exhaust stack 23rd block at the Fukushima Daiichi Nuclear Power Station
2019.12.4 Dismantling of the Unit 1/2 exhaust stack at the Fukushima Daiichi Nuclear Power Station (work on December 4)
2019.12.4 Dismantling of the Unit 1/2 exhaust stack at the Fukushima Daiichi Nuclear Power Station (work on December 3)
2019.10.3 Minister of the Environment Shinjiro Koizumi visited the Fukushima Daiichi Nuclear Power Station (on October 2, 2019)
2019.4.14 Prime Minister Shinzo Abe visited the Fukushima Daiichi Nuclear Power Station (April 14, 2019)
2019.2.13 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Investigation Results - Preliminary Report on February 13 -
2018.11.7 Site Inspection for IAEA Decommissioning Review Mission at Fukushima Daiichi NPS (November 7)
2018.11.1 The governor of Fukushima Pref. visit to the Fukushima Daiichi Nuclear Power Station
2018.5.28 Wall Dismantling Work to create an Opening in the West Wall of Unit 2 Reactor Building
2018.4.26 3D Reconstruction Results based on Unit 3 Primary Containment Vessel Internal Investigation
2018.4.26 Analysis Results of Unit 2 Primary Containment Vessel Internal Investigation
2018.3.16 US Ambassador to Japan William F. Hagerty’s visit to the Fukushima Daiichi Nuclear Power Station
2018.2.28 Internal Dose Investigation of the Unit 3 Reactor Building using a Drone
2018.2.21 Installation of all Dome Roof Segments for Unit 3 Spent Fuel Removal Completed
2018.1.19 Progress of Unit 2 PCV internal investigation (Preliminary report of January 19 investigation)
2017.11.30 Partial damage to temperature gauge cables for the Reactor Pressure Vessel (RPV) found during the Fukushima Daiichi NPS Unit 3 Primary Containment Vessel (PCV) internal investigation
2017.11.30 Image analysis results of Unit 3 PCV internal investigation at Fukushima Daiichi NPS
2017.11.30 Processed image of Unit 2 PCV internal investigation at Fukushima Daiichi NPS
2017.11.20 Installation of the crane for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.15 Governor of Fukushima Prefecture visited Fukushima Daiichi (November 15, 2017)
2017.11.12 Installation of the fuel handling machine for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.9 Fuel handling machine and crane installation for Unit 3 spent fuel removal
2017.9.7 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (Second unit)
2017.8.22 Phase 3 freezing of Landside Impermeable Wall starts at Fukushima Daiichi Nuclear Power Station
2017.8.2 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (On-site demonstration)
2017.7.31 Installation of Unit 3 fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (First unit)
2017.7.27 Locating Fuel Debris inside the Unit 3 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report)
2017.7.22 Progress of Unit 3 PCV internal investigation (Preliminary report of July 22 investigation)
2017.7.21 Progress of Unit 3 PCV internal investigation (Preliminary report of July 21 investigation)
2017.7.19 Progress of Unit 3 PCV internal investigation (Preliminary report of July 19 investigation)
2017.6.27 Installation of the cover for Unit 3 spent fuel removal at Fukushima Daiichi Nuclear Power Station
2017.6.5 U.S. Secretary of Energy Rick Perry visiting Fukushima Daiichi Nuclear Power Station
2017.5.25 Unit 3 PCV Internal Investigation at Fukushima Daiichi NPS (remotely operated underwater vehicle)
2017.5.23 Unit 3 PCV Internal Investigation at Fukushima Daiichi NPS (image of remotely operated underwater vehicle)
2017.4.7 Unit 1 Primary Containment Vessel Internal Investigation(deposition sample collection)
2017.4.3 Unit 1 Primary Containment Vessel internal investigation (State of the field work)
2017.3.30 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (addendum report with image analysis)
2017.3.27 Unit 1 Primary Containment Vessel Internal Investigation
2017.3.24 His Excellency Ambassador Paul Madden, British Embassy Ambassador to Japan, visited Fukushima Daiichi Nuclear Power Station (March 1, 2017)
2017.3.23 Progress of Unit 1 PCV internal investigation (Preliminary report of March 22 investigation)
2017.3.22 Progress of Unit 1 PCV internal investigation (Preliminary report of March 21 investigation)
2017.3.21 Progress of Unit 1 PCV internal investigation (Preliminary report of March 19 and 20 investigations)
2017.3.19 Progress of Unit 1 PCV internal investigation (Preliminary report of March 18 investigation)
2017.3.18 Progress of Unit 1 PCV internal investigation (Beginning of the investigation)
2017.3.2 Construction of a steel frame to support fuel handling machine began during the new roof installation for Unit 3 spent fuel removal
2017.2.27 Videos to show the interior of the Unit 5 Primary Containment Vessel (PCV) (Reference videos for Unit 1 PCV investigation)
2017.2.16 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Investigation results by the self-propelled investigation device)
2017.2.15 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (By the self-propelled investigation device)
2017.2.9 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Results of deposit removal work)
2017.2.2 Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (examination results of digital images)
2017.1.30 Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel investigation at Fukushima Daiichi Nuclear Power Station
2017.1.26 Pre-investigation results of X-6 penetration for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station
2017.1.17 Construction of a new roof for Unit 3 spent fuel removal began at Fukushima Daiichi Nuclear Power Station
2016.12.26 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.12.24 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.12.20 Transportation of the supporting part of a new roof for the Unit 3 fuel removal at Fukushima Daiichi Nuclear Power Station
2016.11.21 Freezing condition visually confirmed for the Landside Impermeable Wall (ice wall)
2016.11.10 Removal of all wall panels (18 in total) from the Unit 1 reactor building cover completed at Fukushima Daiichi Nuclear Power Station
2016.10.20 Examination of the Interior of Units 1 and 2 Exhaust Stack Using Drones at Fukushima Daiichi Nuclear Power Station
2016.10.7 Removal of the 8th wall panel over Unit 1 reactor building at Fukushima Daiichi Nuclear Power Station
2016.9.30 A New Administration Building at Fukushima Daiichi Nuclear Power Station
2016.9.26 Radiation Dose Survey for the Units 1-2 Exhaust Stack at Fukushima Daiichi Nuclear Power Station
2016.9.21 Conditions of the bank protection area at Fukushima Daiichi Nuclear Power Station (2)
2016.9.21 Conditions of the bank protection area at Fukushima Daiichi Nuclear Power Station
2016.9.13 First Wall Panel Removal from Unit 1 Building Cover at Fukushima Daiichi Nuclear Power Station
2016.9.9 Water level measurement in the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.9.5 Progress of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.8.26 Start of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station
2016.8.10 Hiroshige Seko, Minister of Economy, Trade and Industry, Visits the Fukushima Daiichi Nuclear Power Station
2016.7.28 Locating Fuel Debris inside the Unit 2 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
2016.6.6 Phase 2 freezing of Landside Impermeable Wall starts at Fukushima Daiichi Nuclear Power Station
2016.5.26 Progress in Fuel Debris Detection Inside the Unit 2 Reactor Using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report)
2016.5.19 Dr. Barbara Hendricks, Federal Minister of Environment in Germany Visits Fukushima Daiichi Nuclear Power Station
2016.4.12 Shielding Installation on the Top Floor of Unit 3 Reactor Building
2016.4.7 A Week After the Official Activation of Landside Impermeable Wall (frozen soil wall, or "ice wall")
2016.4.6 Start of Nozzle Unit Installations for Mist Sprinkler Associated with the Dismantling of Unit 1 Reactor Building Cover
2016.3.31 Freezing Started for the Landside Impermeable Wall at Fukushima Daiichi Nuclear Power Station
2016.3.29 The Nuclear Reform Monitoring Committee Visits Fukushima Daiichi Nuclear Power Station
2016.3.17 The Detection of Fuel Debris inside the Unit 2 Reactor using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
2016.3.11 Silent prayer and Executive Speeches at Main Anti-Earthquake Building at Fukushima Daiichi Nuclear Power Station
2016.3.2 Lawson Convenienve Store Opens in the Large Rest Facility at Fukushima Daiichi Nuclear Power Station
2016.2.23 Decontamination Work Conducted by the Dry Ice Blast Decontamination Equipent for High Places
2015.12.25 Performance Checks for the Dry Ice Blast Decontamination Equipent for High Places
2015.11.27 Unit 3 PCV Equipment Hatch Investigation Using A Small Investigation Device (Robot)
2015.11.24 Progress Status of Miscellaneous Solid Waste Incineration Facility Installation
2015.11.18 Training to Remove Obstacled Steel Frames Using the Mock-up Facility for Unit 1 Reactor Building of the Fukushima Daiichi Nuclear Power Station
2015.11.12 Progress of the Facing Work at the Fukushima Daiichi Nuclear Power Station
2015.10.29 Completion of Dismantling Flange Tanks in the H1 East Tank Area at Fukushima Daiichi Nuclear Power Station
2015.10.26 Completion of Seaside Impermeable Wall Closure at Fukushima Daiichi Nuclear Power Station
2015.10.22 Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 22)
2015.10.22 Construction Work on Drainage K (temporary to permanent solution)
2015.10.20 Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 20)
2015.10.16 Investigation Results inside Unit 3 Spent Fuel Pool using a Waterproof Camera in Fukushima Daiichi Nuclear Power Station
2015.10.13 Motoo Hayashi, Minister of Economy, Trade and Industry, Visits the Fukushima Daiichi Nuclear Power Station
2015.10.6 Completion of Roof Panel Removal from Unit 1 Building Cover at Fukushima Daiichi Nuclear Power Station
2015.9.25 Completion of Placing Steel Pipe Sheet-Piles for Seaside Impermeable Wall Closure
2015.9.15 Completion of Pouring the Brine on the Landside of the Landside Impermeable Wall (Ice Wall)
2015.9.14 Operational Start of Discharging Groundwater from a Temporary Water Storage Tank through the Subdrain Water Treatment Facilities
2015.9.10 Closing Operation of the Seaside Impermeable Wall at Fukushima Daiichi Nuclear Power Station
2015.8.27 Filling Up Inside Unit 3 Seawater Piping Trench At Fukushima Daiichi Nuclear Power Station
2015.8.8 The accident of a worker clearing construction vehicles at Fukushima Daiichi Nuclear Power Station
2015.8.4 (2015.8.6 video added) Investigation Results Inside of the Unit 3 Spent Fuel Pool
2015.8.2 Completion of removal of Fuel Handling Machine from Fukushima Daiichi Unit 3 Spent Fuel Pool
2015.7.28 Removing roof panels of Unit 1 reactor building cover at Fukushima Daiichi Nuclear Power Station (the 1st panel)
2015.7.10 Fukushima Daiichi Nuclear Power Plant Filling Unit 2 Seawater pipe trench
2015.6.22 Water Leakage from the Pipe of Rainwater Treatment Facility (Desalination Reverse Osmosis Membrane System) at Fukushima Daiichi Nuclear Power Station
2015.6.3 (Photo added on June 9, 2015) Chairman Tony Price and Managing Director Paul Foster from Sellafield Ltd visited Fukushima Daiichi Nuclear Power Station (June 3, 2015)
2015.6.1 Start of operation of the large rest house at Fukushima Daiichi NPS
2015.5.28 The Chairman of Policy Research Council of Liberal Democratic Party, Tomomi Inada Visited at Fukushima Daiichi Nulcear Power Station (May 27, 2015)
2015.5.27 Operational Start of Dismantling the H2 area tank at Fukushima Daiichi Nuclear Power Station
2015.5.22 The Balloon Sliding Off the 3rd Floor Equipment Hatch inside Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
2015.5.15 Start Dismantling Unit 1 Reactor Building Cover <Start Sprinkling Anti-scattering Agent>
2015.5.7 Yoichi Miyazawa, Minister of Economy, Trade and Industry, Visiting Fukushima Daiichi Nuclear Power Station
2015.4.30 Start of coolant functioning test of the impermeable wall on the landside (Ice wall) at Fukushima Daiichi Nuclear Power Station
2015.4.30 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Results of site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -
2015.4.28 Coolant Functioning Test of Land-side Impermeable Wall (Frozen Soil Wall)
2015.4.21 Stop of Water Transfer Pump from K Drainage Channel to C Drainage Channel in Fukushima Daiichi Nuclear Power Station
2015.4.21 IAEA Experts Sent to Fukushima Daiichi Nuclear Power Station for Inspection
2015.4.20 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"- Results of follow up check after the site test "Investigation B1"on grating around the pedestal inside Unit 1 PCV - [Report for April 18 and April 19, 2015]
2015.4.17 (4/20 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - [Prompt report for April 16, 2015]
2015.4.16 (4/17 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -[Prompt report for April 15]
2015.4.13 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" -Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV-
2015.4.10 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"‐Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV‐(Prompt report of inspection commencement on April 10, 2015)
2015.4.7 United States Nuclear Regulatory Commission (U.S.NRC) Chairman, Stephen G.Burns visited Fukushima Daiichi Nuclear Power Station
2015.4.1 Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle)
2015.3.30 Smoke from a Roadside Ditch on the Premises of Fukushima Daiichi Nuclear Power Station
2015.3.24 Fire on the bank of the road on the west side of Units 5 and 6 in the premises of Fukushima-Daiichi Nuclear Power Station
2015.3.19 Reactor Imaging Technology for Fuel Debris Detection by Cosmic Ray Muon, Measurement Status Report in Unit-1
2015.3.18 Nuclear emergency response drill at Fukushima Daiichi NPS
2015.3.11 Moment of Silence and Speech at Main Anti-Earthquake Building at Fukushima Daiichi NPS
2015.3.11 Water Level Reduction containing Rainwater within the Outer Dyke around the "H4" Tank Area at Fukushima Daiichi NPS
2015.2.22 [Technical Committee on Nuclear Power Safety Management in Niigata Prefecture] Explanation on the 4th floor investigation of the Unit 1 reactor building at Fukushima Daiichi NPS
2015.2.20 Operational Start of Second Mobile-type Strontium Removal Equipment
2015.2.20 Refrigerator for Landside Impermeable Wall
2015.2.17 Site Inspection for IAEA Decommissioning Review Mission at Fukushima Daiichi NPS
2015.2.12 Operational start of Mobile Strontium Removal Equipment (Unit B)
2015.2.9 Unit 3 Trench-Filling operation
2015.2.9 Development for fuel debris detection technology for reactor at Fukushima Daiichi Nuclear Power Station (Unit 1)
2015.2.6 Application of Corrective Actions on the Safety Inspection
2015.1.27 Safety Lecture held for field workers at Fukushima Daiichi Nuclear Power Station
2015.1.26 Implementing Corrective Actions after the Safety Inspection at Fukushima Daiichi Nuclear Power Station
2015.1.22 Confirmation on the site situation before conducting the overall safety inspection at Fukushima Daiichi Nuclear Power Station
2015.1.20 A cooperative worker fell off from the top plate of a rainwater receiving tank.
2015.1.16 Total Pep Rally for Safety being held at Fukushima Daiichi NPS
2015.1.14 French Ambassador Thierry DANA visited Fkushima Daiichi NPS (January 13, 2015)
2014.12.20 Spraying Anti-scattering Agents and Survey Result for Unit 1 Building Cover Demolition
2014.12.19 State Minister of Economy, Trade and Industry Yosuke Takagi at Fukushima Daiichi Nuclear Power Station
2014.12.4 Restoring roof panels for the demolition of Unit 1 reactor building cover at Fukushima Daiichi NPS
2014.11.10 Removing the roof panels of Unit 1 reactor building cover (the 2nd panel)
2014.10.31 Removing the roof panels of Unit 1 reactor building cover (the south 3 roof panel)
2014.10.28 Enlarged Opening on the Roof Panels at the Demolition Work of Unit 1 Reactor Building Cover
2014.10.22 Dismantling of Unit 1 reactor building cover
2014.10.17 Gap-filling Starts: Progress of Water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi Nuclear Power Station
2014.9.30 Results of Research Concerning Exterior Section under S/C (Suppression Chamber) at Unit 2
2014.9.30 Cooperation Agreement with Sellafield Ltd
2014.9.30 About the completion of the countermeasure work to address the downward flow of strontium present in the soil in relation to the leak in H4 area tank
2014.9.9 Demonstration Test of the Exterior Surface Survey Equipment for the Lower Part of the Suppression Chamber under Development at the Research and Development of "Development of Survey/Repair (Water stoppage) Technologies for Watering the Containment Vessel"
2014.9.8 Minister of Economy,Trade and Industry Yuko Obuchi at Fukushima Daiichi Nuclear Power Station
2014.9.1 Field survey using underwater camera after the console of the fuel handling machine dropped(August 30, 2014)
2014.9.1 The Console of the Fuel Handling Machine dropped during debris removal operation of Unit 3 Spent Fuel Pool Fukushima Daiichi NPS(August 29, 2014)
2014.8.22 Performance verification test of the Advanced Multi-nuclide Removal Equipment
2014.7.29 Survey of wall of torus room in Unit 2 in Fukushima Daiichi NPS (Report for demonstration survey in R & D project)
2014.7.24 Water management around the Tanks at Fukushima Daiichi NPS
2014.7.24 Start of Operation of a New Office Building at Fukusima Daiichi NPS
2014.7.24 Patrol by "Area keepers"
2014.7.24 Puddle found at Unit 5 Reactor Building 5th floor (operating floor),Fukushima Daiichi NPS
2014.7.17 Replacing Drainage Channel Outlet to the Port For Drainage B and C
2014.7.15 Fire from a generator equipped to supply electricity to the air conditioner of a worker rest house at east side of Fukushima Daiichi NPS
2014.7.9 Suspension of the cooling system for spent fuel pool due to the shut down of the component cooling seawater system at Unit 5 of Fukushima Daiichi Nuclear Power Station
2014.6.23 Start of decontamination by remote-controlled decontamination device on 1st Floor inside Unit 3 R/B at Fukushima Daiichi NPS
2014.6.16 Survey on Torus room wall in Unit 1 of Fukushima Daiichi Nuclear Power Station
2014.6.13 The Honorable Hans Carl von Werthern, German ambassador to Japan visited Fukushima Daiichi Nuclear Power Station (on June 2, 2014)
2014.6.12 Started building of frozen wall (Ice wall)
2014.6.12 Carrying the factory made welded tanks into Fukushima Daiichi Nuclear Power Station
2014.5.30 Demonstration test of survey equipment for the upper part of S/C (Pressure Suppression Chamber) at Unit 1 of the Fukushima Daiichi Nuclear Power Station.
2014.5.27 Results of Investigation on Upper Parts of S/C of Unit 1 at Fukushima Daiichi NPS
2014.5.21 Groundwater bypass at Fukushima Daiichi Nuclear Power Station (water discharge)
2014.5.21 Verification Test of the Ice Wall
2014.5.16 Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima Daiichi NPS
2014.5.14 The U.S. Ambassador, Caroline Kennedy visited Fukushima Daiichi Nuclear Power Station (May 14, 2014)
2014.5.2 Cooperation Statement with Sellafield Ltd
2014.5.1 External visual inspection results of the fuels removed from the spent fuel pool for Unit 4 at the Fukushima Daiichi Nuclear Power Station
2014.4.28 Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima
2014.4.17 Pictures of Installation/ Draining of Ready-Made Contaminated Water Storage Tanks at Fukushima Daiichi NPS
2014.4.15 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 18, 2012
2014.4.14 Leakage from Plastic Tank on Side of H5 Tank Area of Fukushima Daiichi NPS
2014.4.9 Start of pump-up work for beginning the operation of groundwater bypass at Fukushima Daiichi Nuclear Power Station
2014.4.4 Groundwater Bypass System in Fukushima Daiichi NPS
2014.3.28 Worker injured during the drilling operation at Fukushima Daiichi Nuclear Power Station
2014.3.11 Interview to the worker at Unit 4 building cover construction site at Fukushima Daiichi NPS
2014.3.11 Moment of Silence and Speech at Main Anti-Earthquake Building of Fukushima Daiichi NPS
2014.3.11 Dr. Dale Klein's visit to Fukushima Daiichi NPS
2014.3.7 Results of Investigation of Building Frames of Unit 1 Reactor Building at Fukushima Daiichi NPS
2014.2.28 Measures for Leakage from the Top Plate of the Upper Part of H6 Area Tank
2014.2.21 Water Overflow from the flange of the top panel at the upper part of H6 tank area
2014.2.20 Water Overflow from the flange of the top panel on the upper part of H6 tank area
2014.2.18 Measures for Contaminated Water in the Seaside Trenches of Turbine Buildings at Fukushima Daiichi
2014.2.14 Investigation results of building flames after rubbles were removed from the upper part of the reactor building at Unit 3 of Fukushima Daiichi NPS
2014.2.12 Fukushima Daiichi NPS: Cracks in Foundation Concrete in H-4 and H-4 East Tank Areas
2014.2.7 Verification test of decontamination device for lower place under a national project of "Development of Remote Decontamination Technology in the Reactor Building" (Suction/blast device)
2014.2.5 Assessment for Strontium-90 Analysis in Fukushima Daiichi Nuclear Power Station
2014.1.30 Investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station
2014.1.30 Confirmation of cracks by investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station
2014.1.30 Progress in debris removal at sea side as an emergent safety measure in Fukushima Daiichi NPS
2014.1.21 Results of Water Level Measuring inside the Suppression Chamber (S/C) at the Unit 2 in Fukushima Daiichi NPS
2014.1.21 Water leakage around the main steam isolation valve room at the 1st floor of reactor building at Unit 3
2014.1.18 Water Leakage at First Floor of Near the Main Steam Isolation Valve at Unit 3 Fukushima Daiichi NPS
2014.1.14 Lowering in water levels inside the dike in G4 Tank area of Fukushima Daiichi Nuclear Power Station
2013.12.27 Cracks Found during Inspection on Fuel Assembly Having Deformation in Fukushima Daiichi NPS Unit 4 Spent Fuel Pool
2013.12.27 Tank installation, measures against rainwater, and work to have drainage channels covered, at Fukushima Daiichi NPS (Video)
2013.12.24 Leak from the dikes at H5 tank area and G6 north tank area
2013.12.22 Leakage from the H5 tank area dike at Fukushima Daiichi NPS
2013.12.18 Results of the Seventh Soundness Inspection for Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.12.11 Progress Status of Emergency Safety Measures at Fukushima Daiichi NPS
2013.12.6 Measuring Radiation Dose at the Lower Part of Unit 1 and 2 Exhaust Stack in Fukushima Daiichi NPS
2013.12.6 (A video was added on December 13)Results of Investigation into Building Frames around Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS
2013.12.2 Extraction of Fuel from Unit 4 Spent Fuel Pool and Transfer to Common Pool
2013.11.29 Fuel removal work at Fukushima Daiichi NPS Unit 4 (Cask transfer at common pool)
2013.11.27 IAEA visits the Fukushima Daiichi NPS
2013.11.27 Decontamination work on the first floor at Unit 2 reactor building in Fukushima Daiichi NPS
2013.11.27 Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4 (video taken underwater)
2013.11.26 Fuel removal work (extraction of spent fuel) at Fukushima Daiichi NPS Unit 4
2013.11.22 Fuel removal work at the common pool in Fukushima Daiichi NPS Unit 4
2013.11.21 Fuel removal work (cask transfer) at Fukushima Daiichi NPS Unit 4
2013.11.20 Extraction of fuel from Unit 4 (video taken underwater)
2013.11.20 Defect with Emergent Nitrogen Gas Separation Apparatus in Fukushima Daiichi NPS
2013.11.18 Current Status of Fukushima Daiichi NPS Unit 4 Fuel Removal
2013.11.15 Water Leak from the Flange Part of the G6 South Area Tank (Steel Cylindrical Tank)
2013.11.15 Operation of Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS
2013.11.14 Results of Investigation around Lower Parts of Unit 1 Vent Pipes at Fukushima Daiichi NPS(Second Day)
2013.11.13 Site Visit by Mr. Lake Barrett, Outside Expert to the Contaminated Water and Tank Countermeasures Headquarters, to Fukushima Daiichi NPS
2013.11.13 (A video was added on November 15) Results of Investigation around Lower Parts of Unit 1 Vent Pipes at Fukushima Daiichi NPS(First Day)
2013.11.13 Operation to Remove Spent Fuel from Unit 4 Spent Fuel Pool at Fukushima Daiichi NPS
2013.11.13 Measures of rainwater implemented at inside of dike and drainage channel in Fukushima Daiichi Nuclear Power Station
2013.11.11 Leakage of Water Accumulated inside a Dike and High Dose Rate Locations, Found in Tank Areas at Fukushima Daiichi NPS
2013.11.9 Leakage of accumulated water inside the dike of H6 area at Fukushima Daiichi Nuclear Power Station
2013.11.1 U.S. Energy Secretary Ernest Moniz on an inspection
2013.11.1 The Same Type On-premise Transportation Container used for Fuel Debris from the Spent Fuel Pool at Unit 4 in Fukushima Daiichi NPS
2013.10.30 Fuel Discharge from Reactor 4 Spent Fuel Pool in Fukushima Daiichi NPS
2013.10.30 Additional Measures against Contamination Expansion at H4 area in Fukushima Daiichi NPS
2013.10.25 Precautionary Measures of Accumulated Water inside the Dike against Typhoon No.27 (Francisco) at Fukushima Daiichi NPS
2013.10.25 Countermeasure against Rainwater in Tank Area at Fukushima Daiichi NPS
2013.10.25 Collapse on south slope at Okuma street due to influence of typhoon No.26
2013.10.23 Fire near General Waste Incinerator in Fukushima Daiichi NPS -Cause and Countermeasure-
2013.10.16 Debris Removal Work on the Roof Top of the Unit 3 Reactor Building at Fukushima Daiichi NPS Completion of Large Debris Removal and Implementation of Lowering Radiation Dose
2013.10.16 Pumping up of rainwater inside the dike in reaction to the approaching Typhoon No. 26 (Wipha)
2013.10.9 Leakage inside Temporary Warehouse for Desalination System (Reverse Osmosis Membrane) RO-3
2013.10.8 Investigation into the Bottom Plate etc. of the Tank No.5 in H4 Area at Fukushima Daiichi NPS
2013.10.7 Seismic Safety Evaluation of Fukushima Daiichi NPS Units 1 and 2 Exhaust Stack Having Damaged Components
2013.10.7 The Suspension of the Common On-Site Power Supply (3B) Facilities at Fukushima Daiichi NPS
2013.10.3 Leakage from B Area South Tank
2013.10.1 Overflow of Water from the Notch Tank for H6 Area Located on the East of H5 Area at Fukushima Daiichi NPS
2013.9.29 Flow Rate Decrease of Slurry Transfer Pump of Multi-nuclide Removal Equipment System C
2013.9.25 Progress Report on a Cover Installation for Fuel Removal at Unit 4 at Fukushima Daiichi NPS-Completion of Overhead Crane Installation-
2013.9.25 Vacuum Test for the Tank Bottom Plate
2013.9.24 Regarding the Incident Where a Jib Mast at the Tip of a Remote-control Large Crane Was Bent Down [Cause and Countermeasures]
2013.9.20 Investigation of the Inside of Tank No.5 in H4 Area
2013.9.19 Site Visit by Prime Minister Sinzo Abe
2013.9.19 Work Progress in Dismantlement of the Tank No.5 in H4 Tank Area
2013.9.18 Fracture Found on Steel Members (Diagonal Bracings) in the Intermediate Section of the Exhaust Stack for Units 1 and 2 at Fukushima Daiichi NPS
2013.9.18 Investigation into Building Frames around at Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS
2013.9.18 Dismantlement of the Tanks No. 10 and No.5 in H4 Tank Area
2013.9.17 Sandbags at the Drainage Channel B Being Swept Away Due to Rainfall from the Approaching Typhoon at Fukushima Daiichi NPS
2013.9.17 Accumulated Water Inside the Dike in Each Tank Area at Fukushima Daiichi Nuclear Power Station
2013.9.17 Fukushima Daiichi Nuclear Power Station Video Tour
2013.9.13 Site visit by Mr.Lake Barrett at Fukushima Daiichi Nuclear Power Station
2013.9.13 Water Leakage from the Washing Tank of RO Apparatus for Unit 5 and 6 at Fukushima Daiichi NPS
2013.9.13 Dismantlement of the tank No.10 in H4 tank area
2013.9.12 H4 tank area being patrolled at Fukushima Daiichi Nuclear Power Station (Photos)
2013.9.10 Unit 3 Reactor Building, at Fukushima Daiichi Nuclear Power Station, The Bent-Down Tip Jib Mast and Main Mast of a Remote Control Large-Scale Crane
2013.9.6 Condition of sandbags installed at inside of the dike around the H4 area at Fukushima Daiichi Nuclear Power Station
2013.9.5 Radiation Sealing Test in H3 area Tanks
2013.9.4 Investigation Results of Groundwater Inflow at Unit 1 Turbine Building and the Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in Fukushima Daiichi Nuclear Power Station
2013.9.4 H4 tank area being patrolled at Fukushima Daiichi Nuclear Power Station
2013.9.3 G3 Area Tank at Fukushima Daiichi Nuclear Power Station
2013.9.2 High Radiation Locations Found at the H3 Area Tank
2013.9.2 Results of Tank Patrol at Fukushima Daiichi Nuclear Power Station
2013.8.28 Results of the Sixth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.26 Mr. Toshimitsu Motegi, Minister of Economy, Trade and Industry, visiting Fukushima Daiichi Nuclear Power Station
2013.8.26 Dose Measurement Results of the H4 Area Circumference (Drain Valve) and the Drainage Channel Slope Near the H4 Area (Mountain Side)
2013.8.26 Removal of Obstacles Including Debris, etc., at the Southwest Side on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.24 Current progress in the investigation of the H4 Area water leakage
2013.8.22 Results of Full Check of the Bolt Fastening Tanks at Fukushima Daiichi Nuclear Power Station
2013.8.21 Status of Handling of Water Leak at a Tank in the H4 Area in Fukushima Daiichi Nuclear Power Station
2013.8.19 Condition of the bank protection at Fukushima Daiichi Nuclear Power Station (video)
2013.8.19 Water Leak at a Tank in the H4 Area in Fukushima Daiichi Nuclear Power Station
2013.8.15 Installation of Permanent Monitoring Instrument of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.8.15 Commencement of Pumping up of Groundwater from the Well Point (Partial) between the Water Intake Channel of Unit 1 and 2 at Fukushima Daiichi Nuclear Power Station
2013.8.13 Results of Additional Investigation Based on Leakage from Batch Treatment Tank of the Multi-nuclide Removal Equipment (Follow-up Information)
2013.8.13 Investigation of Unit 3, 4 Seaside Trench at Fukushima Daiichi Nuclear Power Station
2013.8.12 Alarm Went off at the Dust Monitor Installed in front of the Main Anti-earthquake Building at Fukushima Daiichi Nuclear Power Station
2013.8.12 Investigation Results of the Inside of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.8.9 Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings
2013.8.9 Results of Inside Investigation of the Reactor Well, the RPV and the Spent Fuel Pool at Unit 4 in Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM8:00~,Jul 26, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM7時00分~,Jul 25, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (PM12:00~,Jul 24, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM9:00~,Jul 23, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.2 Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.7.31 Prior Confirmation Ahead of Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.7.26 Removal of the Obstacles Including Debris, etc., on the First Floor of the Reactor Building of the Fukushima Daiichi Nuclear Power Station Unit 3
2013.7.25 Completion of Fuel Rack Inspection and Confirmation/Collection of Foreign Materials at Unit 6 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2013.7.24 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.7.24 Results of Survey on the PCV Penetration Vicinities at High Places in the 1st Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.7.24 Ambient Dose Measurement Around the Shield Plug on the Fifth Floor of Unit 3 at Fukushima Daiichi Nuclear Power Station
2013.7.23 Surveys on radioactive substances
2013.7.23 Oil Leakage at Unit 6 Emergency Diesel Generator (B) in Fukushima Daiichi Nuclear Power Station
2013.7.22 Completion of Outer Wall and Exterior Roof Panel Installation for the Fuel Removal Cover at Unit 4 in Fukushima Daiichi Nuclear Power Station
2013.7.22 Oil Leakage at the Desalination System (RO-3) in Fukushima Daiichi Nuclear Power Station
2013.7.22 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.7.19 Findings Regarding the Exit of a Contaminated Vehicle from the Fukushima Daiichi NPS
2013.7.19 Results of Additional Work in Soundness Inspection of Unit 2 TIP Guide Pipe
2013.7.19 Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings
2013.7.18 Steam-like Gas Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (am8:35-am8:37 on July 18)
2013.7.17 Inspections of Water Intake Power Cable Trenches at Fukushima Daiichi Nuclear Power Station
2013.7.17 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station(Video taken on July 6, 2013)
2013.7.16 Photos of the groundwater observation holes at Fukushima Daiichi Nuclear Power Station
2013.7.12 Measures to Prevent Fish From Moving to Outside the Port Which were Already Implemented at Fukushima Daiichi Nuclear Power Station (As of July 12, 2013)
2013.7.11 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (4th Day)
2013.7.10 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (3rd Day)
2013.7.9 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (2nd Day)
2013.7.9 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station
2013.7.8 Investigation of Radioactive Materials
2013.7.8 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (1st Day)
2013.7.4 Radioactive Material sampled at Naraha-machi (Zone in Preparation for Having the Evacuation Order Lifted) on July 2
2013.7.3 Failure on a Charger Panel of the Air-cooled Gas Turbine Generator Vehicle (No.1) Due to Entrance of a Small Animal
2013.7.3 Inspection Results of the Batch Treatment Tank 2A of Multi-nuclide Removal Equipment (ALPS) in Fukushima Daiichi Nuclear Power Station
2013.7.2 Investigation of Radioactive Material
2013.7.2 Fire Found Near the Common Incineration Facility at Fukushima Daiichi Nuclear Power Station
2013.6.28 Foundation Concrete Placing Work Started at the Miscellaneous Solid Waste Incineration Building
2013.6.26 Enhancement of Monitoring Plan at the East Side of Unit 1-4 Turbine Buildings and in the Port at Fukushima Daiichi Nuclear Power Station
2013.6.24 Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2013.6.19 Results of Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
2013.6.17 A water droplet found at the batch treatment tank 2A of multi-nuclide removal equipment (ALPS) in Fukushima Daiichi Nuclear Power Station
2013.6.17 Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
2013.6.12 Results and Assessment of Measurements on Groundwater Bypass Temporary Storage Tank Water
2013.6.5 Overview of the underground bypass facility
2013.6.5 About the Inappropriate Wearing of APDs that Are to Be Worn to Check Dose Levels when Wearing a Shielding Suit
2013.6.5 Water Leakage from the Flange of G6 Area Tank (Cylindrical Steel Tank)
2013.5.30 Restoration Completion of Facilities for Maintaining Cold Shutdown at Fukushima Daini Nuclear Power Station
2013.5.29 A Foreign Material Found and Collected in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.5.29 Completion of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.5.29 Results of the Fifth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.5.29 Oil Leakage from Concrete Pumping Vehicle at Parking Outside of Main Gate of Fukushima Daiichi Nuclear Power Station
2013.5.27 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station Renewal of the Protection Installed on the Spent Fuel Pool and the Skimmer Surge Tank Hatch
2013.5.24 A Foreign Material Found in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.5.20 Oil Leakage from Unmanned Heavy Equipment Used for Debris Removal in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.5.9 Dismantlement of Unit 1 Reactor Building Cover for Fuel Removal at Fukushima Daiichi Nuclear Power Station
2013.4.26 Removal of the Guide Pipe (Used for PCV Inside Investigation) from Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.4.22 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.22 Dead Mice Found in the Outdoor Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.22 Small Animals (Mice) Found in the Low Voltage Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.19 Condition of the Skimmer Surge Tank Hatch Cover Found During Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.17 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on April 17, 2013
2013.4.16 Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.15 Suspension of Unit 3 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station: Cause Analysis and Countermeasures
2013.4.12 Work Performed Today (April 12) in Response to the Leakage from the Underground Reservoirs
2013.4.12 Leakage from the Pipe Flange of the Underground Reservoir No.3: Cause and Countermeasure
2013.4.12 Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.4.11 Work Performed Today (April 11) in Response to the Leakage from the Underground Reservoirs
2013.4.11 Progress of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.4.10 Replacement of a High Integrity Container (HIC) of the Multi-nuclide Removal Equipment at Fukushima Daiichi Nuclear Power Station
2013.4.10 The Chief and the Deputy Chief of the Emergency Response Headquarters for Reliability Improvement at Fukushima Daiichi Nuclear Power Station visiting Fukushima Daiichi Nuclear Power Station for site investigation
2013.4.9 Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.8 Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.4.8 Foreign Minister Kishida's visit to Fukushima Daiichi Nuclear Power Station(Apr 6, 2013)
2013.4.7 Temporary measures towards the leakage at Underground Reservoir 3 (As of 6:00 pm on April 7 ,2013)
2013.4.7 Leakage from the underground reservoir No.2 at Fukushima Daiichi Nuclear Power Station
2013.4.5 Suspension of Unit 3 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.5 Status of the Continuous Dust Monitor Installed at the Main Gate of ukushima Daiichi Nuclear Power Station
2013.4.5 Cable Discoloration and a Burn on the Terminal Block of the Standby Liquid Control System Tank Heater at Fukushima Daiichi NPS
2013.4.4 Suspension of the Multi-nuclide Removal Equipment (ALPS) Due to Incorrect Operation
2013.4.4 Transportation of a Dry Storage Cask from the Common Pool Building to the Temporary Dry Cask Storage Facility in Fukushima Daiichi Nuclear Power Station
2013.4.3 Installation of fibrous adsorbent purification equipment in the port
2013.4.2 Overview of Impermeable Wall Construction on the Sea Side
2013.3.29 Footage of TEPCO's TV conference
2013.3.28 The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
2013.3.27 Installation Work of the Net Preventing Fish from Moving Out Around Sea Embankments in the Port of Fukushima Daiichi NPS Completed at East Seawall Bank Side
2013.3.27 Progress Status of the Groundwater Bypass Construction
2013.3.27 Report of Inspection Results of the First Dry Storage Cask at Fukushima Daiichi Nuclear Power Station
2013.3.26 Hole Drilling for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.3.25 Progress of Investigation of Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station
2013.3.22 Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.)
2013.3.20 Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station (As of 4:30 PM on March 20)
2013.3.19 Results of Investigation of the Inside of Unit 2 PCV
2013.3.15 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.14 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.13 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.13 Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame
2013.3.11 Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.3.6 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.6 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.3.5 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.4 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.3.1 Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation
2013.2.28 Major countermeasures against tsunami at Fukushima Daiichi Nuclear Power Station
2013.2.28 Progress Status of the Groundwater Bypass Construction and Preparation for Operational Commencement
2013.2.27 Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
2013.2.25 Nuclear Disaster Training (Emergency Training) at Fukushima Daiichi Nuclear Power Station (Outline)
2013.2.22 Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
2013.2.22 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 2)
2013.2.21 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 1)
2013.2.21 Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18)
2013.2.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.15 Investigation of the fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station(Video on Nov 30, 2012)
2013.2.14 Drilling Holes for the Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.2.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.13 Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.8 Possibility of Debris (Assumed to be the Fuel Handling Machine Mast) Sinking in the Spent Fuel Pool at Debris Removal from the Upper Part of the Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.7 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.2.6 Debris Removal from the Upper part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of Steel Truss Debris
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.30 Water Leakage from the Desalination System (RO2)
2013.1.28 Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.1.28 Suspension of Unit 3 PCV gas control system at Fukushima Daiichi Nuclear Power Station due to partial pipe replacement with steel pipe and control panel modification
2013.1.26 Barbara Judge, Vise Chairman of Nuclear Reform Monitoring Committee, visited Fukushima Daiichi NPP
2013.1.24 Fire Alarm Going off at the Auxiliary Operation Shared Facility at Fukushima Daiichi Nuclear Power Station
2013.1.18 Change of Dust Sampling Method at the Openings of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.1.16 Minister of Economy, Trade and Industry Motegi visiting the Fukushima Revitalization Headquarters and Fukushima Daiichi Nuclear Power Station
2013.1.15 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Completion of the First Layer of Steel Framing
2013.1.8 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Installation of 2 Columns of the First Layer
2012.12.29 Prime Minister Abe's visit to Fukushima Daiichi Nuclear Power Station
2012.12.26 Water Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2012.12.25 Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.12.25 Mega float being relocated in the port of Fukushima Daiichi Nuclear Power Station
2012.12.21 Niigata Prefecture Technical Committee's Visit to Fukushima Daiichi NPS and Daini NPS
2012.12.20 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.19 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.17 Drop test of the HIC for the Multi-Nuclide Removal Equipment
2012.12.14 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 14, 2012
2012.12.14 Puddle Found on the First Floor of Unit 4 Waste Treatment Building at Fukushima Daiichi Nuclear Power Station
2012.12.14 Fukushima Daiichi Nuclear Power Station Video Tour
2012.12.12 Water Leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.12.11 Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.5 Completion of Water Stop Work at Unit 3 Control Building at Fukushima Daiichi Nuclear Power Station
2012.12.5 Inspection Results of Unit 5 Residual Heat Removal System Seawater Pump (C) at Fukushima Daiichi Nuclear Power Station
2012.12.3 National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.11.30 Disclosure of the Video of our TV Conference (Second time)
2012.11.29 Results of the Third Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.11.28 Countermeasure Implementation for the Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.28 Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.11.27 Smoke Coming out of Damaged Power Cable at Fukushima Daiichi Nuclear Power Station: Causes and Countermeasures
2012.11.27 Increase in the Reactor Injection Water Amount at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.11.27 Investigation Results of Suspension of Unit 3 Spent Fuel Pool Desalination System (Mobile RO) and Hydrochloric Acid Leakage at Fukushima Daiichi Nuclear Power Station
2012.11.26 Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
2012.11.20 Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.14 Description of Changes to the Report on Facility Management Plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security"
2012.11.6 Hands-on Training for Operating the Reactor Cooling Facility at Fukushima Daiichi Nuclear Power Station
2012.11.2 Smoke Coming out from Damaged Power Cable at Fukushima Daiichi Nuclear Power Station
2012.11.1 Investigation Results of Smoke Coming out from Electric Motors in the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.10.24 Hydrochloric Acid Leakage from Unit 3 Spent Fuel Pool Desalination System (Mobile RO) at Fukushima Daiichi Nuclear Power Station
2012.10.24 Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Daiichi Nuclear Power Station
2012.10.24 The Kanto Region Governors' Association Visiting Fukushima Daiichi Nuclear Power Station
2012.10.19 Fire Occurred Near Units 1-2 Ultrahigh Voltage Switchyard (Outdoor) at Fukushima Daiichi Nuclear Power Station
2012.10.15 Duct Replacement at Unit 2 PCV Gas Control System at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13)
2012.10.15 The Water Leakage at the Accumulated Water Transferring Pipe in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
2012.10.12 Wearing of Tyvek with the Chest Area Being Transparent
2012.10.12 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.11 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.10 An Issue Found with the Minimum Flow Rate Bypass Valve of Unit 5 Reactor Core Spray System (B) at Fukushima Daiichi Nuclear Power Station
2012.10.10 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.5 Water Leakage from Unit 6 Purification Equipment Pipe at Fukushima Daiichi Nuclear Power Station
2012.10.5 Footage of TEPCO's TV conference
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.10.3 Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
2012.10.2 White Smoke Coming Out from the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.10.1 Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station
2012.9.27 Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
2012.9.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.9.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.9.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.9.18 Water Leakage from the Desalination System Reverse Osmosis Membrane) 3
2012.9.15 Expected members of the Nuclear Power Regulatory Agency visiting Fukushima Daiichi Nuclear Power Station
2012.9.13 Removal of the RPV Lid in the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.9.11 (40)Around the Unit 4 Reactor Building
2012.9.11 (39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (37)Unit 2 Transformer Area
2012.9.11 (36)Unit 1 Transformer Area
2012.9.11 (35)Unit 4 Instrument Air Compressor
2012.9.11 (34)Around the Unit 1 Large Equipment Hatch
2012.9.11 (33)Inside the Unit 2 Power Source Room
2012.9.11 (32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (30)Sea side area of Unit 2
2012.9.11 (29)Sea side area of Unit 1
2012.9.11 (28)At Fukushima Daiichi Nuclear Power Station
2012.9.11 (27)Inside the Unit 2 Basement Power Source Room
2012.9.11 (26)Inside the Unit 2 Alternate Power Source Room
2012.9.11 (25)Around the Unit 2 Alternate Power Source Room
2012.9.11 (24)Inside the Unit 1 Power Source Room
2012.9.11 (23)Around the Outdoor Power Panel
2012.9.11 (22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
2012.9.11 (21)Inside Reserve Power Substation
2012.9.11 (20)Around Reserve Power Substation
2012.9.11 (19)Unit 6 Transformer Area
2012.9.11 (18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (17)Unit 5 Transformer Area
2012.9.11 (16)Unit 5 and 6 Switchyard Area (Outside)
2012.9.11 (15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4.
2012.9.11 (14)Inside the Unit 5 Power Source Room
2012.9.11 (13)Inside the Unit 5 and 6 Vertical Shafts
2012.9.11 (12)Inside the Unit 6 Power Source Room
2012.9.11 (11)Inside the Unit 5 and 6 Transmission Board Room
2012.9.11 (10)Inside the Unit 5 and 6 Main Control Room
2012.9.11 (9)Sea side area of Unit 5 and 6
2012.9.11 (8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3
2012.9.11 (7)Appearance of Unit 1 after the explosion
2012.9.11 (6)The situation at Fukushima Daiichi Nuclear Power Station in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (5)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
2012.9.11 (4)The situation at Fukushima Daiichi Nuclear Power Station after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (3)The situation at Fukushima Daiichi Nuclear Power Station (Main Office Building, etc.) after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (2)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit (Undertow)
2012.9.11 (1)The shallow draft quay in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.9.10 Damage of Unit 2 PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.9.6 Inspection of the Inside of the Treated Water Buffer Tank
2012.8.30 The Soundness of Unit 4 Reactor Building and Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.30 Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.8.29 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.28 Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.27 Installation of multi-nuclide removal equipment
2012.8.23 Videos on Entering/Exiting Fukushima Daiichi Nuclear Power Station and Checking of Dosimeter and Wearing Tyvek (Prototype with the Chest Area Being Transparent) at the Exit of the Main Anti-earthquake Building
2012.8.17 Water Leakage from the Desalination System (Reverse Osmosis Membrane) 3
2012.8.14 White Smoke Coming out of the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.8.14 Water Leakage in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.8.10 Removal of PCV Lid from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.8.9 Reliability Improvement of the Second Cesium Absorption Apparatus
2012.8.8 Result of Investigation on Unit 1 Operating Floor at Fukushima Daiichi Nuclear Power Station
2012.8.6 Footage of TEPCO's TV conference
2012.7.31 Change of Fukuichi Live Camera Location at Fukushima Daiichi Nuclear Power Station
2012.7.27 Investigation Results of the Oil Leak from the Transformer at the Outdoor Hazardous-material Storage Tank at Fukushima Daiichi Nuclear Power Station
2012.7.25 Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.7.23 Fuel Oil Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station (Occurred on July 20)
2012.7.19 Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.7.17 Operational Commencement of the Refrigerators Installed by the Treatment Water Buffer Tank at Fukushima Daiichi Nuclear Power Station
2012.7.13 Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.7.13 Status of Fukushima Daiichi Nuclear Power Station When the Tsunami hit
2012.7.13 【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.12 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
2012.7.11 Completion of Debris Removal from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.7.11 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.6 Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
2012.7.5 Emergency Training for Nitrogen Supply Equipment Abnormality at Fukushima Daiichi Nuclear Power Station
2012.7.5 Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
2012.7.5 “Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
2012.7.4 TEPCO Chairman and President Visiting Fukushima Daiichi and Daini Nuclear Power Station
2012.7.3 Smoke Coming out of the Control Panel of the Compressed Air System (IA System) at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station (Follow-up)
2012.7.3 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.7.2 Smoke Coming out from the Compressed Air System (IA system) Control Panel at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station
2012.6.27 Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012)
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.25 Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
2012.6.23 Water Overflow from the Plastic Container near Desalination System (Reverse Osmosis Membrane) No.2 at Fukushima Daiichi Nuclear Power Station
2012.6.19 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
2012.6.18 Investigation Result of the Water Leak from the Decontamination Apparatus (Occurred on June 14)
2012.6.15 The Protection Platform Installation on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.14 Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
2012.6.12 Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
2012.6.12 Reliability Enhancement Work for the Cesium Absorption Apparatus
2012.6.7 Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
2012.6.7 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
2012.6.5 Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.6.1 Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS
2012.5.30 Site Investigation Result of the Accumulated Water Found at Unit 3 Radiation Waste Underground Storage Facility Building At Fukushima Daiichi Nuclear Power Station (May 28-29)
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.2
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.1
2012.5.26 【Video】Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4)
2012.5.25 【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building
2012.5.24 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.5.9 Water leak near the filtrate water transfer pump room
2012.4.27 Regarding leakage from water desalination (reverse osmosis membrane) 2
2012.4.27 The installation of gate monitor in connection with switchover of Fukushima Daiichi Nuclear Power Station’s Seismic Isolated Building to “Uncontrolled”
2012.4.27 The situation of trial operation of screening and decontamination area for vehicles at Fukushima Daiichi Nuclear Power Station
2012.4.26 Regarding the treatment of certain areas of the Seismic isolated building of the Fukushima Daiichi Nuclear Power Station as “Uncontrolled area”
2012.4.24 【Video】Visitation of Fukushima Daiichi Nuclear Power Station by Mr. Nakatsuka (Deputy Minister of Cabinet Office)
2012.4.23 Fukushima Daiichi Nuclear Power Station Visitation of Mr. Nakatsuka, Senior Vice Minister of Cabinet Office
2012.4.20 Improvement of Environment around Monitoring Post of Fukushima Daiichi Nuclear Power Station (Result Report)
2012.4.20 Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time
2012.4.20 Fukushima Daiichi Nuclear Power Station Case example of the Improvement of Environment around Monitoring Post
2012.4.20 【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19 Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
2012.4.18 Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
2012.4.17 Overveiw of the Robot(Survey Runner)
2012.4.16 General Plan and Start of Main Work of the Cover for Fuel Removal of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.4.16 【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.16 Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.4.13 Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.9 Countermeasures against expansion of leakage between SPT(B) and Water Desalinations (reverse osmosis membrane)
2012.4.5 Water leakage point at concentrated water storage tank area of water desalinations (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station
2012.3.30 Sampling of fish and shellfish on the ocean area within 20km of Fukushima Daiichi Nuclear Power Station
2012.3.29 Cause and countermeasures against a fire near No.3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 on March 21, 2012
2012.3.28 Countermeasures against Water Leakage from Condensed Water Transportation Line of Water Desalinations (Reverse Osmosis Membrane)
2012.3.27 Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
2012.3.27 【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
2012.3.26 Emergency response training at Fukushima Daiichi Nuclear Power Plant
2012.3.24 Fukushima Daiichi Nuclear Power Station Scenes of disaster drill
2012.3.23 Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
2012.3.22 Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
2012.3.22 Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2012.3.16 The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.13 Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
2012.3.12 Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
2012.3.12 Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station
2012.3.9 Fukushima Daiichi Nuclear Power Station System Chart <before construction>
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.3.2 Status of piping inside (Leakage point)
2012.2.28 Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
2012.2.25 Water leakage at Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building), Fukushima Daiichi Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.23 Operational Change of Wearing Protective Equipment at the Site of Fukushima Daiichi Nuclear Power Station
2012.2.22 Installment of Small-sized Incinerator in Fukushima Daiichi Nuclear Power Station
2012.2.21 Fukushima Daiichi Nuclear Power Plant Start of marine soil coating construction inside the port
2012.2.10 Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port
2012.2.8 Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
2012.2.6 Water leakage from the water desalination facility (Reverse osmosis Membrane) concentrated water tank
2012.2.3 Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station
2012.2.3 Leakage from water desalinations(RO)concentrated water tank
2012.2.2 Situation of Water Leakage at First Floor in Reactor Building at Unit 4 of Fukushima Daiichi Nuclear Power Station
2012.2.1 Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement)
2012.2.1 Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station
2012.2.1 Measures against Freeze of Water Treatment Facility / Measures against Freeze of Reactor Water Injection System at Fukushima Daiichi Nuclear Power Station
2012.1.30 Fukushima Daiichi Nuclear Power Station; Investigation results of the bottom of the sea in front of Units 5-6 Water Intakes
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange of Mini Flow Piping of the Waste RO Supply Pump in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Vent Valve around the Normal Reactor Injection Pump (B) on the Hill (on Standby) in Fukushima Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.19 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2012.1.12 Status of inspection work of the main turbine of Unit 4
2012.1.10 Water leakage from the concentrated water tank of the water desalinations (reverse osmosis membrane)
2012.1.8 Circulating Cooling System for Spent Fuel Pool of Unit 4 in Fukushima Daiichi Nuclear Power Station Leakage of Filtered Water from Cooling Pipe of Air Fin Cooler
2011.12.29 Water leakage (freshwater) from a hose of the water desalinations (reverse osmosis membrane system) near the concentrated water storage area at Fukushima Daiichi Nuclear Power Station
2011.12.24 Unit 3 of Fukushima Daiichi Nuclear Power Station Swelling of Water Injection Hose to Reactor
2011.12.23 The crack of axle linkage casing at the overhead crane in the building of spent fuel common pool, Fukushima Daiichi Nuclear Power Station
2011.12.21 Installation of Temporary Storage for Cesium Adsorption Tower
2011.12.20 Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
2011.12.19 Accumulated water in the trench between Process Main Building and Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in the Centralized Radiation Waste Treatment Facility at Fukushima Daiichi Nuclear Power Station
2011.12.17 Discussions at Fukushima Daiichi Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daiichi Nuclear Power Plant
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.12.14 Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
2011.12.13 Leakage from Sampling Line of Evaporative Concentration System 3 C
2011.12.6 Outflow of water leaked from the evaporative condensation apparatus at Fukushima Daiichi Nuclear Power Station
2011.12.5 Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags
2011.12.4 Leakage from evaporative condensation apparatus
2011.12.3 Series of Explanatory Videos Vol.2 No.3
2011.12.1 Nuclide analysis results of ocean soil - inside the Port entrance of Fukushima Daiichi Nuclear Power Plant
2011.11.30 Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
2011.11.29 Resumption of desalting by ion exchanging device at spent fuel pool of Unit4 at Fukushima Daiichi Nuclear Power Plant
2011.11.26 Series of Explanatory Videos Vol.3 No.2
2011.11.25 Fukushima Daiichi Nuclear Power Station Operation of Unmanned Survey Ship
2011.11.22 Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
2011.11.21 Start of operation of unmanned investigation boat Fukushima Daiichi Nuclear Power Station
2011.11.19 Series of Explanatory Videos Vol.3 No.1
2011.11.19 Debris removal works with heavy machinery at Fukushima Daiichi Nuclear Power
2011.11.16 Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.12 Series of Explanatory Videos Vol.2 No.4
2011.11.11 Situation of J-Village / Report from the site of Fukushima Daiichi Nuclear Power Station
2011.11.10 Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.11.9 Liquid leakage in the desalting facility for the spent fuel pool in Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.11.8 Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.11.7 Installation Status of Radioactive Material Removal Facility at the Unit 2's Spent Fuel Pool of Fukushima Daiichi Nuclear Power Station
2011.11.5 Series of Explanatory Videos Vol.2 No.3
2011.11.5 Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.2 Overview of the blocking operation of the units 1 - 4 openings
2011.10.29 Circumstances of the accident when dismantling a large-size crane
2011.10.29 Series of Explanatory Videos Vol.2 No.2
2011.10.28 Ancillary facilities for cover panels of Unit 1(Completion of Cover Construction at Reactor Building of Unit 1 of Fukushima Daiichi NPS)
2011.10.27 Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
2011.10.24 Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.22 Series of Explanatory Videos Vol.2 No.1
2011.10.22 Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station
2011.10.22 Report from the site of Fukushima Daiichi Nuclear Power Station
2011.10.21 Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Isolation Condenser of Unit 1, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
2011.10.15 Series of Explanatory Videos Vol.1 No.4
2011.10.15 Result of temperature measurement by infrared camera from right above the reactor
2011.10.14 Survey results of pipe penetration on 1st floor of Unit 1 reactor building
2011.10.14 Completion of installing the roof panel of the cover for the reactor building at Unit 1
2011.10.12 Water injection practice at Fukushima Daiichi Nuclear Power Station
2011.10.11 Overview of dust sampling at the openings of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.10 1st floor of Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station Cutoff operation for a spray system pipe of RPV
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.8 Installation Work of Roof Panels for Reactor Building Covers at Unit 1 of Fukushima Daiichi Nuclear Power Plant
2011.10.8 Situation of Upper Part of Unit 1 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.7 View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.10.7 View of the cut trees from the northwest of Unit 5 and 6, Fukushima Daiichi Nuclear Power Plant
2011.10.4 Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.1 Series of Explanatory Videos Vol.1 No.3
2011.10.1 Overview of Dust Collector System
2011.9.28 Fukushima Daiichi Nuclear Power Station Restoration work of permeation prevention structure at the south side of the intake canal of Unit 1 to 4
2011.9.28 JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
2011.9.27 Picture of mock-up test for covering Spent Fuel Pool to remove debris on the roof of Reactor Building at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.24 Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.22 Fukushima Daichi Nuclear Power Station Inflow spot of rainwater in the basement of Turbine Building, Unit 6
2011.9.20 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.9.20 Water Leakage of Desalination Facilities (RO) on Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.17 Series of Explanatory Videos Vol.1 No.2
2011.9.13 Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
2011.9.12 A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.9.11 TEPCO's President Toshio Nishizawa visits Fukushima Daiichi Nuclear Power Plant on September 11th, marking six months since the occurrence of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2011.9.10 Series of Explanatory Videos Vol.1 No.1
2011.9.10 Fukushima Daiichi Nuclear Power Station Dust sampling instrument for opening of Units 1 and 3 nuclear reactor buildings
2011.9.10 Unit 1, Fukushima Daiichi NPS, Construction of steel erection for cover of reactor building completed
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS
2011.9.1 The water leakage spot of the sludge transfer pump casing
2011.8.30 Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
2011.8.25 Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling
2011.8.20 Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.8.17 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.8.11 Securing and developing human resources for the responses of the accident
2011.8.10 Status of iron frame construction for the reactor building cover of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.8.10 Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.8.5 Stack drain pipe of exhaust stack of Units 1 and 2
2011.8.3 Place where high radiation dose was detected, Unit1, at Fukushima Daiichi Nuclear Power Station
2011.8.2 Main Exhaust Stuck of Unit 1/2
2011.8.1 Evaporative concentration equipment
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.30 Completion of Installation of Supporting Structure under the Bottom of the Spent Fuel Pool in the Reactor Building at Fukushima Daiichi Nuclear Power Station Unit 4
2011.7.29 Rest area on the 2nd floor of Unit1/2 Service Building
2011.7.29 Rest area for construction of covers of Unit1 Reactor Building(Shimizu Corporation)
2011.7.28 Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
2011.7.27 Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
2011.7.26 Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station
2011.7.26 The 2nd Cesium Adsorption Facility (SARRY)
2011.7.26 Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
2011.7.18 Fukushima Daiichi Nuclear Power Station Unit 3 Turbine Building Installation Work of Roof
2011.7.17 Appearance of the Roof for Countermeasure against Rainwater, Unit 3, Fukushima Daiichi
2011.7.16 Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
2011.7.12 The repaired part for chemical leakage of water treatment system(before/after repair)
2011.7.10 The repaired part for chemical leakage of water treatment system (coagulation settling facility)
2011.7.10 Chemical Injection Leakage Point in the Water Treatment Facility System (Coagulation Settling Equipment)
2011.7.9 Fukushima Daiichi Unit3 - Investigation result of nitrogen injection point at R/B
2011.7.7 Trial fitting of the cover for Unit 1, Fukushima Daiichi Nuclear Power Station at Onahama port
2011.7.6 Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.7.5 Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
2011.7.4 Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building
2011.7.3 Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
2011.7.2 Status of establishing rest areas for workers
2011.7.2 Status of preparation for the countermeasures against heat stroke such as Cool Vest
2011.7.2 Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
2011.7.1 Fulfillment/reinforcement of medical establishment (Establishment of an emergency medical room)
2011.7.1 Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station
2011.7.1 Spent Fuel Pool in Reactor Building , Unit 4, Fukushima Daiichi Nuclear Power Station
2011.6.30 Results of Investigation on 5th Floor of the Reactor Building Unit 4
2011.6.30 Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.30 Removal of Heavy Oil Tank No.1 at Fukushima Daiichi Nuclear Power Station
2011.6.24 Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
2011.6.23 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.6.23 Temporary Indicator Set-up at Unit 2
2011.6.23 Shielding Wall of Unit 2
2011.6.20 Robot:Quince
2011.6.20 Reference Picture 1 "Initial response at the time of and after the Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi Nuclear Power Station"
2011.6.20 Installation work of supporting structure at the bottom of Spent Fuel Pool
2011.6.20 Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.6.17 Temporary storage tanks (for treated water at Intermediate-and-low-level Radioactive Water Treatment Facility)
2011.6.17 Cesium Absorption Apparatus
2011.6.15 Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.14 Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.14 Outline of Fukushima Daiichi Nuclear Power Plant unit1reactor building covering plan
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.11 Pictured at South Side on 4th floor of Unit 4 Reactor Building
2011.6.11 Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.11 Inside of Unit 2 Turbine Building of Fukushima Daiichi
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.10 Fukushima Daiichi Nuclear Power Station Status of setting rest areas
2011.6.8 Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo
2011.6.5 Image of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
2011.6.5 High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
2011.6.5 Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
2011.6.4 Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
2011.6.4 Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
2011.6.4 Outline of water processing facilities
2011.6.2 Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.6.1 Circulating Seawater Purification Equipment at the Fukushima Daiichi Nuclear Power Station
2011.5.31 Oil slick near the cartain wall of the Unit 5 and 6
2011.5.29 Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.5.28 Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station
2011.5.27 IAEA Fukushima Visit
2011.5.24 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station
2011.5.24 Fukushima Daiichi Nuclear Power Station pictures taken from the observation deck
2011.5.22 Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Mega Float entering the port
2011.5.21 Fukushima Daiichi Nuclear Power Station Rubble around the reactor building
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.19 Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station(2)
2011.5.19 Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
2011.5.18 Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.14 Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
2011.5.12 Inspection Status of the Indicator (Water level indicator A, fuel area) at Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.11 The situation of water stop at the pit near the water intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.11 The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.10 Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.5.9 North side of the second floor ,Northwest side of the first floor(Fukushima Daiichi Nuclear Power Station Unit1)
2011.5.8 Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.5.8 Fukushima Daiichi Nuclear Power Station Status of Improved Working Environment Inside of Reactor Building of Unit 1-First Floor of Turbine Building of Unit 1
2011.5.6 Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.5.5 The ambient air filtration system (Alara Venti Jumbo)
2011.5.3 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Movies taken from T-Hawk
2011.4.27 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.17 Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
2011.4.16 a sandbag containing zeolite
2011.4.15 A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.4.15 Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.11 Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)
2011.4.9 The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
2011.4.8 No title(uploaded on Apr 8,2011)
2011.4.6 Shutoff of water outflow was confirmed
2011.4.2 Near of the Sea Water intake of Unit2
2011.4.1 Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
2011.4.1 Dispersing Dust Protectant, Common Pool Area
2011.4.1 Water pumping using a concrete pumping car for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.29 Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.27 Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.3.24 Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
2011.3.23 Grid line connection work to offsite power grid
2011.3.23 Control room of Fukushima Daiichi Nuclear Power Station
2011.3.22 Water pumping using a concrete pumping car
2011.3.21 Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.3.17 Unit 3,Uniit4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter)
2011.3.16 Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station
2011.3.11 Unit 1 of Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection