写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

Others

Upload dates
Title
2013.3.29 Footage of TEPCO's TV conference
2013.3.6 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.1.16 Minister of Economy, Trade and Industry Motegi visiting the Fukushima Revitalization Headquarters and Fukushima Daiichi Nuclear Power Station
2012.11.30 Disclosure of the Video of our TV Conference (Second time)
2012.10.5 Footage of TEPCO's TV conference
2012.9.11 Framework for the Nuclear Reform(Video Message)
2012.8.6 Footage of TEPCO's TV conference
2012.7.13 Current Situation of the Tsunami Protection Measures at Kashiwazaki-Kariwa Nuclear Power Station (end of June,2012)
2012.6.15 Action towards monitoring and decontamination
2012.3.26 Shutdown Operation for Regular Inspection of Unit 6 of Kashiwazaki-Kariwa Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.1.18 Inspection Status at Minami-iwaki Switching Station
2011.12.27 Results of Boring and Trenching Survey on Yunotake Fault
2011.11.21 Status of investigation on Yunotake Fault (quick report)
2011.11.18 Current Status of Tsunami Sediments Study Around the Coast of Kashiwazaki Kariwa Nuclear Power Station The First Day of Investigation (November 15, 2011) Investigation in Miyagawa, Kashiwazaki
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.8.23 Dust Sampling Facility (Basin)
2011.7.14 Meeting Room at the Fhkushima Daiichi Stabilization Center
2011.7.6 New Hirono Domitory
2011.7.1 Central Load Dispatching office
2011.5.20 gamma camera
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.12 a model of a nuclear reactor pressure vessel
2011.5.10 Robots
2011.4.28 Robot, Truck etc.
2011.4.27 Forklift truck for removing rubble(source:Mitsubishi Heavy Industries, Ltd.)
2011.4.26 Remote-controlled crawler dump
2011.4.18 Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
2011.4.13 Cask for 38 fuel assembly BWR Type
2011.4.7 Arrival of "Mega Float"
2011.3.24 Temporary monitoring post
2011.3.23 Grid line connection work to offsite power grid