写真・動画検索
  • Search by key words
  • Search by upload dates
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by dates photos were taken/videos were shot
    • Year 2011
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2012
      • Jan
      • Feb
      • Mar
      • Apr
      • May
      • Jun
      • Jul
      • Aug
      • Sep
      • Oct
      • Nov
      • Dec
    • Year 2013
      • Jan
      • Feb
      • Mar
      • Apr
      • May
  • Search by status/measures
    • Status of the accident
    • Cooling of reactors
    • Mitigation of radioactive materials
    • Survey
    • Work
    • Others
  • Search by locations
    • Fukushima Daiichi Nuclear Power Station
    • Unit1
    • Unit2
    • Unit3
    • Unit4
    • Unit5
    • Unit6
    • Fukushima Daini Nuclear Power Station
    • J Village
    • Others
  • Pickup
    • Working environment
    • Effect of tsunami
    • 1st week after March 11
    • Survey by robots
    • Troubles(in water processing system)
    • TV conference
    • Video clip
    • Status of Fukushima Daiichi Nuclear Power Plants shown in photos

Others

Upload dates
Title
2013.5.20 Oil Leakage from Unmanned Heavy Equipment Used for Debris Removal in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.5.9 Dismantlement of Unit 1 Reactor Building Cover for Fuel Removal at Fukushima Daiichi Nuclear Power Station
2013.4.22 Dead Mice Found in the Outdoor Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.22 Small Animals (Mice) Found in the Low Voltage Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.19 Condition of the Skimmer Surge Tank Hatch Cover Found During Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.17 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on April 17, 2013
2013.4.15 Suspension of Unit 3 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station: Cause Analysis and Countermeasures
2013.4.12 Work Performed Today (April 12) in Response to the Leakage from the Underground Reservoirs
2013.4.12 Leakage from the Pipe Flange of the Underground Reservoir No.3: Cause and Countermeasure
2013.4.11 Work Performed Today (April 11) in Response to the Leakage from the Underground Reservoirs
2013.4.11 Progress of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.4.11 Water Leakage from the Pipe Flange When the Water Transfer from the Underground Reservoir No.3 to No.6 was Started
2013.4.10 The Chief and the Deputy Chief of the Emergency Response Headquarters for Reliability Improvement at Fukushima Daiichi Nuclear Power Station visiting Fukushima Daiichi Nuclear Power Station for site investigation
2013.4.8 Foreign Minister Kishida's visit to Fukushima Daiichi Nuclear Power Station(Apr 6, 2013)
2013.4.8 Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.4.7 Temporary measures towards the leakage at Underground Reservoir 3 (As of 6:00 pm on April 7 ,2013)
2013.4.7 Leakage from the underground reservoir No.2 at Fukushima Daiichi Nuclear Power Station
2013.4.5 Suspension of Unit 3 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.5 Status of the Continuous Dust Monitor Installed at the Main Gate of ukushima Daiichi Nuclear Power Station
2013.4.5 Cable Discoloration and a Burn on the Terminal Block of the Standby Liquid Control System Tank Heater at Fukushima Daiichi NPS
2013.4.4 Suspension of the Multi-nuclide Removal Equipment (ALPS) Due to Incorrect Operation
2013.4.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: March 2013)
2013.4.3 Installation of fibrous adsorbent purification equipment in the port
2013.4.2 Overview of Impermeable Wall Construction on the Sea Side
2013.3.29 Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station
2013.3.29 Verification test performed at Fukushima Daini Nuclear Power Station as part of a research and development project "Development of remote decontamination technologies to be used inside buildings"
2013.3.29 Footage of TEPCO's TV conference
2013.3.28 The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
2013.3.27 Installation Work of the Net Preventing Fish from Moving Out Around Sea Embankments in the Port of Fukushima Daiichi NPS Completed at East Seawall Bank Side
2013.3.27 Progress Status of the Groundwater Bypass Construction
2013.3.22 Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.)
2013.3.13 Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame
2013.3.11 Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.3.6 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.3.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: February 2013)
2013.3.4 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.2.28 Major countermeasures against tsunami at Fukushima Daiichi Nuclear Power Station
2013.2.28 Progress Status of the Groundwater Bypass Construction and Preparation for Operational Commencement
2013.2.27 Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
2013.2.25 Nuclear Disaster Training (Emergency Training) at Fukushima Daiichi Nuclear Power Station (Outline)
2013.2.18 Nuclear Disaster Training (Emergency Training) at Fukushima Daini Nuclear Power Station (Outline)
2013.2.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.8 Possibility of Debris (Assumed to be the Fuel Handling Machine Mast) Sinking in the Spent Fuel Pool at Debris Removal from the Upper Part of the Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.7 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.2.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: January 2013)
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.30 Water Leakage from the Desalination System (RO2)
2013.1.28 Suspension of Unit 3 PCV gas control system at Fukushima Daiichi Nuclear Power Station due to partial pipe replacement with steel pipe and control panel modification
2013.1.26 Barbara Judge, Vise Chairman of Nuclear Reform Monitoring Committee, visited Fukushima Daiichi NPP
2013.1.24 Fire Alarm Going off at the Auxiliary Operation Shared Facility at Fukushima Daiichi Nuclear Power Station
2013.1.18 Change of Dust Sampling Method at the Openings of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.1.16 Minister of Economy, Trade and Industry Motegi visiting the Fukushima Revitalization Headquarters and Fukushima Daiichi Nuclear Power Station
2013.1.15 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Completion of the First Layer of Steel Framing
2013.1.9 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: December 2012)
2012.12.29 Prime Minister Abe's visit to Fukushima Daiichi Nuclear Power Station
2012.12.28 Cause and countermeasure of air leakage from the main exhaust duct at Fukushima Daini Nuclear Power Station Unit 4
2012.12.26 Water Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2012.12.25 Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.12.25 Mega float being relocated in the port of Fukushima Daiichi Nuclear Power Station
2012.12.21 Niigata Prefecture Technical Committee's Visit to Fukushima Daiichi NPS and Daini NPS
2012.12.19 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.19 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 18, 2012
2012.12.17 Drop test of the HIC for the Multi-Nuclide Removal Equipment
2012.12.14 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 14, 2012
2012.12.14 Puddle Found on the First Floor of Unit 4 Waste Treatment Building at Fukushima Daiichi Nuclear Power Station
2012.12.14 Fukushima Daiichi Nuclear Power Station Video Tour
2012.12.12 Water Leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.10 Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2012.12.5 Completion of Water Stop Work at Unit 3 Control Building at Fukushima Daiichi Nuclear Power Station
2012.12.5 Inspection Results of Unit 5 Residual Heat Removal System Seawater Pump (C) at Fukushima Daiichi Nuclear Power Station
2012.12.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: November 2012)
2012.12.3 National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.11.30 Disclosure of the Video of our TV Conference (Second time)
2012.11.28 Countermeasure Implementation for the Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.27 Smoke Coming out of Damaged Power Cable at Fukushima Daiichi Nuclear Power Station: Causes and Countermeasures
2012.11.27 Increase in the Reactor Injection Water Amount at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.11.20 Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.14 Description of Changes to the Report on Facility Management Plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security"
2012.11.6 Hands-on Training for Operating the Reactor Cooling Facility at Fukushima Daiichi Nuclear Power Station
2012.11.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
2012.11.2 Smoke Coming out from Damaged Power Cable at Fukushima Daiichi Nuclear Power Station
2012.10.24 Hydrochloric Acid Leakage from Unit 3 Spent Fuel Pool Desalination System (Mobile RO) at Fukushima Daiichi Nuclear Power Station
2012.10.24 The Kanto Region Governors' Association Visiting Fukushima Daiichi Nuclear Power Station
2012.10.19 Fire Occurred Near Units 1-2 Ultrahigh Voltage Switchyard (Outdoor) at Fukushima Daiichi Nuclear Power Station
2012.10.15 Emergency Safety Training at Fukushima Daini Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13)
2012.10.15 The Water Leakage at the Accumulated Water Transferring Pipe in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
2012.10.12 Wearing of Tyvek with the Chest Area Being Transparent
2012.10.12 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.11 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.10 An Issue Found with the Minimum Flow Rate Bypass Valve of Unit 5 Reactor Core Spray System (B) at Fukushima Daiichi Nuclear Power Station
2012.10.5 Water Leakage from Unit 6 Purification Equipment Pipe at Fukushima Daiichi Nuclear Power Station
2012.10.5 Footage of TEPCO's TV conference
2012.10.3 Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.10.2 White Smoke Coming Out from the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.10.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: September 2012)
2012.9.27 Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
2012.9.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.9.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.9.24 Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.9.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.9.18 Water Leakage from the Desalination System Reverse Osmosis Membrane) 3
2012.9.15 Expected members of the Nuclear Power Regulatory Agency visiting Fukushima Daiichi Nuclear Power Station
2012.9.11 Framework for the Nuclear Reform(Video Message)
2012.9.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.9.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: August 2012)
2012.8.30 The Soundness of Unit 4 Reactor Building and Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.27 Installation of multi-nuclide removal equipment
2012.8.23 Videos on Entering/Exiting Fukushima Daiichi Nuclear Power Station and Checking of Dosimeter and Wearing Tyvek (Prototype with the Chest Area Being Transparent) at the Exit of the Main Anti-earthquake Building
2012.8.21 Nuclide Analysis Results of Fish and Shellfish(Greenling)
2012.8.17 Water Leakage from the Desalination System (Reverse Osmosis Membrane) 3
2012.8.14 White Smoke Coming out of the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.8.14 Water Leakage in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.8.9 Overview of our TV Conference System
2012.8.8 Result of Investigation on Unit 1 Operating Floor at Fukushima Daiichi Nuclear Power Station
2012.8.6 Footage of TEPCO's TV conference
2012.8.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: July 2012)
2012.7.31 Change of Fukuichi Live Camera Location at Fukushima Daiichi Nuclear Power Station
2012.7.27 Investigation Results of the Oil Leak from the Transformer at the Outdoor Hazardous-material Storage Tank at Fukushima Daiichi Nuclear Power Station
2012.7.25 Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.7.23 Fuel Oil Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station (Occurred on July 20)
2012.7.19 Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.7.13 Current Situation of the Tsunami Protection Measures at Kashiwazaki-Kariwa Nuclear Power Station (end of June,2012)
2012.7.6 Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
2012.7.5 Emergency Training for Nitrogen Supply Equipment Abnormality at Fukushima Daiichi Nuclear Power Station
2012.7.4 TEPCO Chairman and President Visiting Fukushima Daiichi and Daini Nuclear Power Station
2012.7.3 Smoke Coming out of the Control Panel of the Compressed Air System (IA System) at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station (Follow-up)
2012.7.3 Training for the Deployment of Air-cooled Gas Turbine Power Supply Car and Control Vehicle (Start-up Operation) at Fukushima Daini Nuclear Power Station
2012.7.3 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.7.2 Smoke Coming out from the Compressed Air System (IA system) Control Panel at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.25 Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
2012.6.23 Water Overflow from the Plastic Container near Desalination System (Reverse Osmosis Membrane) No.2 at Fukushima Daiichi Nuclear Power Station
2012.6.19 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
2012.6.18 Investigation Result of the Water Leak from the Decontamination Apparatus (Occurred on June 14)
2012.6.15 Action towards monitoring and decontamination
2012.6.14 Water Leak from the Decontamination Apparatus
2012.6.8 The Protection Platform Added on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.8 Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station
2012.6.5 Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.6.1 Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.2
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.1
2012.5.26 【Video】Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4)
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.5.9 Water leak near the filtrate water transfer pump room
2012.5.9 Progress Status of Fukushima Daini Nuclear Power Station Recovery Plan(Monthly Report: April 2012)
2012.4.27 Regarding leakage from water desalination (reverse osmosis membrane) 2
2012.4.27 The installation of gate monitor in connection with switchover of Fukushima Daiichi Nuclear Power Station’s Seismic Isolated Building to “Uncontrolled”
2012.4.27 The situation of trial operation of screening and decontamination area for vehicles at Fukushima Daiichi Nuclear Power Station
2012.4.24 【Video】Visitation of Fukushima Daiichi Nuclear Power Station by Mr. Nakatsuka (Deputy Minister of Cabinet Office)
2012.4.23 Fukushima Daiichi Nuclear Power Station Visitation of Mr. Nakatsuka, Senior Vice Minister of Cabinet Office
2012.4.20 Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time
2012.4.16 Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.4.9 Countermeasures against expansion of leakage between SPT(B) and Water Desalinations (reverse osmosis membrane)
2012.4.5 Water leakage point at concentrated water storage tank area of water desalinations (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station
2012.3.29 Cause and countermeasures against a fire near No.3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 on March 21, 2012
2012.3.28 Countermeasures against Water Leakage from Condensed Water Transportation Line of Water Desalinations (Reverse Osmosis Membrane)
2012.3.26 Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
2012.3.26 Emergency response training at Fukushima Daiichi Nuclear Power Plant
2012.3.26 Shutdown Operation for Regular Inspection of Unit 6 of Kashiwazaki-Kariwa Nuclear Power Station
2012.3.24 Fukushima Daiichi Nuclear Power Station Scenes of disaster drill
2012.3.21 A Fire near No. 3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6
2012.3.9 Fukushima Daiichi Nuclear Power Station System Chart <before construction>
2012.2.27 Emergency Drill at Fukushima Daini Nuclear Power Station(Outline)
2012.2.25 Water leakage at Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building), Fukushima Daiichi Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.23 Operational Change of Wearing Protective Equipment at the Site of Fukushima Daiichi Nuclear Power Station
2012.2.22 Installment of Small-sized Incinerator in Fukushima Daiichi Nuclear Power Station
2012.2.21 Fukushima Daiichi Nuclear Power Plant Start of marine soil coating construction inside the port
2012.2.8 Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
2012.2.6 Water leakage from the water desalination facility (Reverse osmosis Membrane) concentrated water tank
2012.2.3 Leakage from water desalinations(RO)concentrated water tank
2012.2.2 Situation of Water Leakage at First Floor in Reactor Building at Unit 4 of Fukushima Daiichi Nuclear Power Station
2012.2.1 Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement)
2012.2.1 Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange of Mini Flow Piping of the Waste RO Supply Pump in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Vent Valve around the Normal Reactor Injection Pump (B) on the Hill (on Standby) in Fukushima Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2012.1.12 Status of inspection work of the main turbine of Unit 4
2012.1.10 Water leakage from the concentrated water tank of the water desalinations (reverse osmosis membrane)
2012.1.8 Circulating Cooling System for Spent Fuel Pool of Unit 4 in Fukushima Daiichi Nuclear Power Station Leakage of Filtered Water from Cooling Pipe of Air Fin Cooler
2011.12.24 Unit 3 of Fukushima Daiichi Nuclear Power Station Swelling of Water Injection Hose to Reactor
2011.12.20 Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
2011.12.19 Accumulated water in the trench between Process Main Building and Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in the Centralized Radiation Waste Treatment Facility at Fukushima Daiichi Nuclear Power Station
2011.12.17 Discussions at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the 6th floor of Unit 1 reactor building at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the main control room of Unit 1 and 2 at Fukushima Daini Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daini Nuclear Power Plant
2011.12.17 Discussions at Fukushima Daiichi Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daiichi Nuclear Power Plant
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.12.14 Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
2011.12.8 Emergency Security Measures "Nighttime Training" Conducted on Dec. 7
2011.12.3 Series of Explanatory Videos Vol.2 No.3
2011.11.26 Series of Explanatory Videos Vol.3 No.2
2011.11.12 Series of Explanatory Videos Vol.2 No.4
2011.11.11 Situation of J-Village / Report from the site of Fukushima Daiichi Nuclear Power Station
2011.11.9 Liquid leakage in the desalting facility for the spent fuel pool in Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.11.4 Influenza vaccination at J village
2011.10.29 Circumstances of the accident when dismantling a large-size crane
2011.10.27 Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
2011.10.22 Series of Explanatory Videos Vol.2 No.1
2011.10.22 Report from the site of Fukushima Daiichi Nuclear Power Station
2011.10.15 Current Situation of Fukushima Daiichi Nuclear Power Plant in Pictures -J Village Edition
2011.10.15 "On-site Practicesite Practice", training of emergency countermeasures for safety at Fukushima Daini Nuclear Power Station
2011.10.12 Water injection practice at Fukushima Daiichi Nuclear Power Station
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of the cut trees from the northwest of Unit 5 and 6, Fukushima Daiichi Nuclear Power Plant
2011.10.1 Overview of Dust Collector System
2011.9.24 Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.22 Fukushima Daichi Nuclear Power Station Inflow spot of rainwater in the basement of Turbine Building, Unit 6
2011.9.20 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.9.20 Water Leakage of Desalination Facilities (RO) on Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.11 TEPCO's President Toshio Nishizawa visits Fukushima Daiichi Nuclear Power Plant on September 11th, marking six months since the occurrence of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.1 The water leakage spot of the sludge transfer pump casing
2011.8.20 Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.8.17 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.8.11 Securing and developing human resources for the responses of the accident
2011.8.1 Evaporative concentration equipment
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.29 Rest area on the 2nd floor of Unit1/2 Service Building
2011.7.29 Rest area for construction of covers of Unit1 Reactor Building(Shimizu Corporation)
2011.7.26 Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station
2011.7.26 Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
2011.7.14 Meeting Room at the Fhkushima Daiichi Stabilization Center
2011.7.12 The repaired part for chemical leakage of water treatment system(before/after repair)
2011.7.10 The repaired part for chemical leakage of water treatment system (coagulation settling facility)
2011.7.10 Chemical Injection Leakage Point in the Water Treatment Facility System (Coagulation Settling Equipment)
2011.7.6 Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.7.6 New Hirono Domitory
2011.7.3 Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
2011.7.2 Status of establishing rest areas for workers
2011.7.2 Status of preparation for the countermeasures against heat stroke such as Cool Vest
2011.7.1 Fulfillment/reinforcement of medical establishment (Establishment of an emergency medical room)
2011.7.1 Central Load Dispatching office
2011.7.1 Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.24 Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.11 Inside of Unit 2 Turbine Building of Fukushima Daiichi
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.10 Fukushima Daiichi Nuclear Power Station Status of setting rest areas
2011.6.10 Fukushima Daini Nuclear Power Station Status of improvement on working conditions
2011.6.8 Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo
2011.6.5 Image of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
2011.6.4 Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
2011.5.31 Oil slick near the cartain wall of the Unit 5 and 6
2011.5.29 Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.5.27 IAEA Fukushima Visit
2011.5.22 Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Mega Float entering the port
2011.5.20 gamma camera
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.18 Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.14 Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
2011.5.14 The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
2011.5.12 a model of a nuclear reactor pressure vessel
2011.5.10 Robots
2011.5.9 North side of the second floor ,Northwest side of the first floor(Fukushima Daiichi Nuclear Power Station Unit1)
2011.5.8 Fukushima Daiichi Nuclear Power Station Status of Improved Working Environment Inside of Reactor Building of Unit 1-First Floor of Turbine Building of Unit 1
2011.5.5 The ambient air filtration system (Alara Venti Jumbo)
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Forklift truck for removing rubble(source:Mitsubishi Heavy Industries, Ltd.)
2011.4.26 Remote-controlled crawler dump
2011.4.18 Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
2011.4.13 Cask for 38 fuel assembly BWR Type
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.11 Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)
2011.4.9 The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
2011.4.8 No title(uploaded on Apr 8,2011)
2011.4.7 Arrival of "Mega Float"
2011.3.29 Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.27 Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.3.24 Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
2011.3.23 Control room of Fukushima Daiichi Nuclear Power Station