Site observation by the packbot in the nuclear reactor building of Unit 1
Upload dateApr 27,2011
![Nearby the entrance of SHC pump room Nearby the entrance of SHC pump room](/library/110427_1/110427_packbot_1.jpg)
Photo
![Nearby the entrance of SHC pump room Nearby the entrance of SHC pump room](/library/110427_1/110427_packbot_1.jpg)
Nearby the entrance of SHC pump room
pictured on Apr 26,2011
![Observation of the pressure gauge of the primary containment vessel Observation of the pressure gauge of the primary containment vessel](/library/110427_1/110427_packbot_2.jpg)
Observation of the pressure gauge of the primary containment vessel
pictured on Apr 26,2011
![Check of the leakage from the electrical penetration Check of the leakage from the electrical penetration](/library/110427_1/110427_packbot_3.jpg)
Check of the leakage from the electrical penetration
pictured on Apr 26,2011
![Check of the leakage from the equipment hatch Check of the leakage from the equipment hatch](/library/110427_1/110427_packbot_4.jpg)
Check of the leakage from the equipment hatch
pictured on Apr 26,2011