Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

June 2012

Upload dates
Title
2012.6.27 Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012)
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.25 Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
2012.6.23 Water Overflow from the Plastic Container near Desalination System (Reverse Osmosis Membrane) No.2 at Fukushima Daiichi Nuclear Power Station
2012.6.19 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
2012.6.18 Investigation Result of the Water Leak from the Decontamination Apparatus (Occurred on June 14)
2012.6.15 Action towards monitoring and decontamination
2012.6.15 The Protection Platform Installation on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.14 Water Leak from the Decontamination Apparatus
2012.6.14 Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
2012.6.12 Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
2012.6.12 Reliability Enhancement Work for the Cesium Absorption Apparatus
2012.6.8 The Protection Platform Added on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.8 Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station
2012.6.7 Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
2012.6.7 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
2012.6.5 Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.6.1 Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS

to TOP


  1. HOME
  2. Photo collection