Title
2013.10.16 Debris Removal Work on the Roof Top of the Unit 3 Reactor Building at Fukushima Daiichi NPS Completion of Large Debris Removal and Implementation of Lowering Radiation Dose
2012.11.27 Increase in the Reactor Injection Water Amount at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.5.9 Progress Status of Fukushima Daini Nuclear Power Station Recovery Plan(Monthly Report: April 2012)
2012.4.20 Fukushima Daiichi Nuclear Power Station Case example of the Improvement of Environment around Monitoring Post
2012.3.13 Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
2012.3.12 Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
2012.3.12 Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station
2012.3.9 Fukushima Daiichi Nuclear Power Station System Chart <before construction>
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.3.2 Status of piping inside (Leakage point)
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.28 Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
2012.2.27 Emergency Drill at Fukushima Daini Nuclear Power Station(Outline)
2012.2.25 Water leakage at Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building), Fukushima Daiichi Nuclear Power Station
2012.2.21 Fukushima Daiichi Nuclear Power Plant Start of marine soil coating construction inside the port
2012.2.10 Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port
2012.2.8 Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
2012.2.6 Water leakage from the water desalination facility (Reverse osmosis Membrane) concentrated water tank
2012.2.3 Leakage from water desalinations(RO)concentrated water tank
2012.2.2 Situation of Water Leakage at First Floor in Reactor Building at Unit 4 of Fukushima Daiichi Nuclear Power Station
2012.2.1 Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement)