Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

June 2011

Upload dates
Title
2011.6.30 Results of Investigation on 5th Floor of the Reactor Building Unit 4
2011.6.30 Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.30 Removal of Heavy Oil Tank No.1 at Fukushima Daiichi Nuclear Power Station
2011.6.24 Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
2011.6.23 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.6.23 Temporary Indicator Set-up at Unit 2
2011.6.23 Shielding Wall of Unit 2
2011.6.20 Robot:Quince
2011.6.20 Reference Picture 1 "Initial response at the time of and after the Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi Nuclear Power Station"
2011.6.20 Installation work of supporting structure at the bottom of Spent Fuel Pool
2011.6.20 Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.6.17 Temporary storage tanks (for treated water at Intermediate-and-low-level Radioactive Water Treatment Facility)
2011.6.17 Cesium Absorption Apparatus
2011.6.15 Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.14 Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.14 Outline of Fukushima Daiichi Nuclear Power Plant unit1reactor building covering plan
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.11 Pictured at South Side on 4th floor of Unit 4 Reactor Building
2011.6.11 Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.11 Inside of Unit 2 Turbine Building of Fukushima Daiichi
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.10 Fukushima Daiichi Nuclear Power Station Status of setting rest areas
2011.6.10 Fukushima Daini Nuclear Power Station Status of improvement on working conditions
2011.6.8 The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
2011.6.8 Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo
2011.6.5 Image of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
2011.6.5 High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
2011.6.5 Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
2011.6.4 Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
2011.6.4 Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
2011.6.4 Outline of water processing facilities
2011.6.2 Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.6.1 Circulating Seawater Purification Equipment at the Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection