Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

April 2015

Upload dates
Title
2015.04.30 Start of coolant functioning test of the impermeable wall on the landside (Ice wall) at Fukushima Daiichi Nuclear Power Station
2015.04.30 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Results of site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -
2015.04.28 Coolant Functioning Test of Land-side Impermeable Wall (Frozen Soil Wall)
2015.04.21 Stop of Water Transfer Pump from K Drainage Channel to C Drainage Channel in Fukushima Daiichi Nuclear Power Station
2015.04.21 IAEA Experts Sent to Fukushima Daiichi Nuclear Power Station for Inspection
2015.04.20 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"- Results of follow up check after the site test "Investigation B1"on grating around the pedestal inside Unit 1 PCV - [Report for April 18 and April 19, 2015]
2015.04.17 (4/20 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - [Prompt report for April 16, 2015]
2015.04.16 (4/17 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -[Prompt report for April 15]
2015.04.14 Members of Japan Chamber of Commerce and Industry (JCCI)@ Kashiwazaki-Kariwa NPS
2015.04.13 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" -Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV-
2015.04.10 "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"‐Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV‐(Prompt report of inspection commencement on April 10, 2015)
2015.04.07 United States Nuclear Regulatory Commission (U.S.NRC) Chairman, Stephen G.Burns visited Fukushima Daiichi Nuclear Power Station
2015.04.01 Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle)

to TOP


  1. HOME
  2. Photo collection