Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Unit3

Upload dates
Title
2020.8.3 Unit 3 fuel removal work at the Fukushima Daiichi Nuclear Power Station
2018.4.26 3D Reconstruction Results based on Unit 3 Primary Containment Vessel Internal Investigation
2018.2.28 Internal Dose Investigation of the Unit 3 Reactor Building using a Drone
2018.2.21 Installation of all Dome Roof Segments for Unit 3 Spent Fuel Removal Completed
2017.11.30 Partial damage to temperature gauge cables for the Reactor Pressure Vessel (RPV) found during the Fukushima Daiichi NPS Unit 3 Primary Containment Vessel (PCV) internal investigation
2017.11.30 Image analysis results of Unit 3 PCV internal investigation at Fukushima Daiichi NPS
2017.11.20 Installation of the crane for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.12 Installation of the fuel handling machine for fuel removal at Fukushima Daiichi NPS Unit 3
2017.11.9 Fuel handling machine and crane installation for Unit 3 spent fuel removal
2017.9.7 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (Second unit)
2017.8.2 Installation of Unit 3 spent fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (On-site demonstration)
2017.7.31 Installation of Unit 3 fuel removal cover dome roof at Fukushima Daiichi Nuclear Power Station (First unit)
2017.7.27 Locating Fuel Debris inside the Unit 3 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report)
2017.7.22 Progress of Unit 3 PCV internal investigation (Preliminary report of July 22 investigation)
2017.7.21 Progress of Unit 3 PCV internal investigation (Preliminary report of July 21 investigation)
2017.7.19 Progress of Unit 3 PCV internal investigation (Preliminary report of July 19 investigation)
2017.6.27 Installation of the cover for Unit 3 spent fuel removal at Fukushima Daiichi Nuclear Power Station
2017.5.25 Unit 3 PCV Internal Investigation at Fukushima Daiichi NPS (remotely operated underwater vehicle)
2017.3.2 Construction of a steel frame to support fuel handling machine began during the new roof installation for Unit 3 spent fuel removal
2017.1.17 Construction of a new roof for Unit 3 spent fuel removal began at Fukushima Daiichi Nuclear Power Station
2016.12.20 Transportation of the supporting part of a new roof for the Unit 3 fuel removal at Fukushima Daiichi Nuclear Power Station
2016.4.12 Shielding Installation on the Top Floor of Unit 3 Reactor Building
2015.11.27 Unit 3 PCV Equipment Hatch Investigation Using A Small Investigation Device (Robot)
2015.10.22 Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 22)
2015.10.20 Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 20)
2015.10.16 Investigation Results inside Unit 3 Spent Fuel Pool using a Waterproof Camera in Fukushima Daiichi Nuclear Power Station
2015.8.27 Filling Up Inside Unit 3 Seawater Piping Trench At Fukushima Daiichi Nuclear Power Station
2015.8.4 (2015.8.6 video added) Investigation Results Inside of the Unit 3 Spent Fuel Pool
2015.8.2 Completion of removal of Fuel Handling Machine from Fukushima Daiichi Unit 3 Spent Fuel Pool
2015.2.9 Unit 3 Trench-Filling operation
2014.10.17 Gap-filling Starts: Progress of Water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi Nuclear Power Station
2014.9.1 Field survey using underwater camera after the console of the fuel handling machine dropped(August 30, 2014)
2014.9.1 The Console of the Fuel Handling Machine dropped during debris removal operation of Unit 3 Spent Fuel Pool Fukushima Daiichi NPS(August 29, 2014)
2014.6.23 Start of decontamination by remote-controlled decontamination device on 1st Floor inside Unit 3 R/B at Fukushima Daiichi NPS
2014.5.16 Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima Daiichi NPS
2014.4.28 Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima
2014.2.14 Investigation results of building flames after rubbles were removed from the upper part of the reactor building at Unit 3 of Fukushima Daiichi NPS
2014.1.18 Water Leakage at First Floor of Near the Main Steam Isolation Valve at Unit 3 Fukushima Daiichi NPS
2013.9.10 Unit 3 Reactor Building, at Fukushima Daiichi Nuclear Power Station, The Bent-Down Tip Jib Mast and Main Mast of a Remote Control Large-Scale Crane
2013.8.26 Removal of Obstacles Including Debris, etc., at the Southwest Side on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM8:00~,Jul 26, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM7時00分~,Jul 25, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (PM12:00~,Jul 24, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM9:00~,Jul 23, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.2 Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.7.26 Removal of the Obstacles Including Debris, etc., on the First Floor of the Reactor Building of the Fukushima Daiichi Nuclear Power Station Unit 3
2013.7.24 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.7.24 Ambient Dose Measurement Around the Shield Plug on the Fifth Floor of Unit 3 at Fukushima Daiichi Nuclear Power Station
2013.7.22 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.7.18 Steam-like Gas Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (am8:35-am8:37 on July 18)
2013.5.27 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station Renewal of the Protection Installed on the Spent Fuel Pool and the Skimmer Surge Tank Hatch
2013.5.20 Oil Leakage from Unmanned Heavy Equipment Used for Debris Removal in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.22 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.19 Condition of the Skimmer Surge Tank Hatch Cover Found During Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.15 Suspension of Unit 3 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station: Cause Analysis and Countermeasures
2013.4.5 Suspension of Unit 3 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.3.4 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.2.21 Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18)
2013.2.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.8 Possibility of Debris (Assumed to be the Fuel Handling Machine Mast) Sinking in the Spent Fuel Pool at Debris Removal from the Upper Part of the Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.6 Debris Removal from the Upper part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of Steel Truss Debris
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.28 Suspension of Unit 3 PCV gas control system at Fukushima Daiichi Nuclear Power Station due to partial pipe replacement with steel pipe and control panel modification
2012.12.20 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.19 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.12 Water Leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.12.5 Completion of Water Stop Work at Unit 3 Control Building at Fukushima Daiichi Nuclear Power Station
2012.11.28 Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.11.27 Increase in the Reactor Injection Water Amount at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.11.27 Investigation Results of Suspension of Unit 3 Spent Fuel Pool Desalination System (Mobile RO) and Hydrochloric Acid Leakage at Fukushima Daiichi Nuclear Power Station
2012.11.26 Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
2012.11.14 Description of Changes to the Report on Facility Management Plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security"
2012.10.24 Hydrochloric Acid Leakage from Unit 3 Spent Fuel Pool Desalination System (Mobile RO) at Fukushima Daiichi Nuclear Power Station
2012.10.15 The Water Leakage at the Accumulated Water Transferring Pipe in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
2012.10.3 Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
2012.9.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.9.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.9.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.9.11 (32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4.
2012.9.11 (8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3
2012.9.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.7.13 Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.7.13 【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.12 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
2012.7.11 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation
2012.7.5 “Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.25 Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
2012.6.19 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
2012.6.7 Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
2012.5.30 Site Investigation Result of the Accumulated Water Found at Unit 3 Radiation Waste Underground Storage Facility Building At Fukushima Daiichi Nuclear Power Station (May 28-29)
2012.5.24 Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
2012.4.20 Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time
2012.4.20 【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.19 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.4.16 【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.13 Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2011.12.24 Unit 3 of Fukushima Daiichi Nuclear Power Station Swelling of Water Injection Hose to Reactor
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.11.30 Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
2011.11.22 Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
2011.11.16 Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.11.8 Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.11.5 Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2011.10.22 Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station
2011.10.15 Result of temperature measurement by infrared camera from right above the reactor
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.8 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.1 Overview of Dust Collector System
2011.9.28 JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.13 Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
2011.9.10 Fukushima Daiichi Nuclear Power Station Dust sampling instrument for opening of Units 1 and 3 nuclear reactor buildings
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.8.25 Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.28 Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
2011.7.27 Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
2011.7.18 Fukushima Daiichi Nuclear Power Station Unit 3 Turbine Building Installation Work of Roof
2011.7.17 Appearance of the Roof for Countermeasure against Rainwater, Unit 3, Fukushima Daiichi
2011.7.4 Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building
2011.7.2 Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
2011.6.30 Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.15 Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.14 Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.11 Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.5 High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
2011.5.27 IAEA Fukushima Visit
2011.5.21 Fukushima Daiichi Nuclear Power Station Rubble around the reactor building
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.11 The situation of water stop at the pit near the water intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.11 The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.10 Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.17 Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.3.23 Control room of Fukushima Daiichi Nuclear Power Station
2011.3.21 Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.3.17 Unit 3,Uniit4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter)
2011.3.16 Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection