Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

July 2013

Upload dates
Title
2013.08.06 (AM8:00~,Jul 26, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.08.06 (AM7時00分~,Jul 25, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.08.06 (PM12:00~,Jul 24, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.08.06 (AM9:00~,Jul 23, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.07.31 Prior Confirmation Ahead of Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.07.26 Removal of the Obstacles Including Debris, etc., on the First Floor of the Reactor Building of the Fukushima Daiichi Nuclear Power Station Unit 3
2013.07.26 Oil-like Substance Seen Floating in the Vicinity of Fukushima Daini Nuclear Power Station Unit 2 Water Intake Screening System
2013.07.25 Completion of Fuel Rack Inspection and Confirmation/Collection of Foreign Materials at Unit 6 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2013.07.24 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.07.24 Results of Survey on the PCV Penetration Vicinities at High Places in the 1st Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.07.24 Ambient Dose Measurement Around the Shield Plug on the Fifth Floor of Unit 3 at Fukushima Daiichi Nuclear Power Station
2013.07.23 Surveys on radioactive substances
2013.07.23 Oil Leakage at Unit 6 Emergency Diesel Generator (B) in Fukushima Daiichi Nuclear Power Station
2013.07.22 Completion of Outer Wall and Exterior Roof Panel Installation for the Fuel Removal Cover at Unit 4 in Fukushima Daiichi Nuclear Power Station
2013.07.22 Oil Leakage at the Desalination System (RO-3) in Fukushima Daiichi Nuclear Power Station
2013.07.22 Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station
2013.07.19 Results of Additional Work in Soundness Inspection of Unit 2 TIP Guide Pipe
2013.07.19 Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings
2013.07.18 Steam-like Gas Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (am8:35-am8:37 on July 18)
2013.07.17 Inspections of Water Intake Power Cable Trenches at Fukushima Daiichi Nuclear Power Station
2013.07.17 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station(Video taken on July 6, 2013)
2013.07.16 Photos of the groundwater observation holes at Fukushima Daiichi Nuclear Power Station
2013.07.12 Measures to Prevent Fish From Moving to Outside the Port Which were Already Implemented at Fukushima Daiichi Nuclear Power Station (As of July 12, 2013)
2013.07.11 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (4th Day)
2013.07.10 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (3rd Day)
2013.07.09 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (2nd Day)
2013.07.09 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station
2013.07.08 Investigation of Radioactive Materials
2013.07.08 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (1st Day)
2013.07.04 Radioactive Material sampled at Naraha-machi (Zone in Preparation for Having the Evacuation Order Lifted) on July 2
2013.07.03 Failure on a Charger Panel of the Air-cooled Gas Turbine Generator Vehicle (No.1) Due to Entrance of a Small Animal
2013.07.03 Inspection Results of the Batch Treatment Tank 2A of Multi-nuclide Removal Equipment (ALPS) in Fukushima Daiichi Nuclear Power Station
2013.07.02 Investigation of Radioactive Material
2013.07.02 Fire Found Near the Common Incineration Facility at Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection