Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station
Upload dateJuly, 9, 2013
![](/library/130709_01/130709_02.jpg)
Photo
![](/library/130709_01/130709_02t.jpg)
![](/library/130709_01/130709_05t.jpg)
![](/library/130709_01/130709_06t.jpg)
![](/library/130709_01/130709_09t.jpg)
![](/library/130709_01/130709_10t.jpg)
![](/library/130709_01/130709_12t.jpg)
![](/library/130709_01/130709_13t.jpg)
Groundwater observation hole No. 1-1
Photo taken on July 9, 2013
Photo taken by Tokyo Electric Power Company
Video
Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station (3:31)
Play Video / Download(52.4MB)
Category
■Search by status/measures
Mitigation of radioactive materials / Work