Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station

Upload dateJuly, 9, 2013
Photo
[Construction equipment of ground improvement]

Boring machine

Boring machine rod (tip)

 

  Photo taken on July 8, 2013 

[Process of chemical solidification]

2 types of chemical
Solidified chemical (enlarged image)

  Photo taken on July 8, 2013

[Chemical injection work]

Before the work
The work ongoing

  Photo taken on July 8, 2013

Groundwater observation hole No. 1-1

  Photo taken on July 9, 2013

 

Photo taken by Tokyo Electric Power Company
 

Video

Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station (3:31)

Play Video / Download(52.4MB)

Category

Search by status/measures

 Mitigation of radioactive materials / Work

to TOP


  1. HOME
  2. Photo collection