Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Mitigation of radioactive materials

Upload dates
Title
2013.8.15 Commencement of Pumping up of Groundwater from the Well Point (Partial) between the Water Intake Channel of Unit 1 and 2 at Fukushima Daiichi Nuclear Power Station
2013.7.17 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station(Video taken on July 6, 2013)
2013.7.12 Measures to Prevent Fish From Moving to Outside the Port Which were Already Implemented at Fukushima Daiichi Nuclear Power Station (As of July 12, 2013)
2013.7.9 Ground Improvement Construction (Chemical Injection) at Bank Protection between the Water Intake Channel of Unit 1 and Unit 2 at Fukushima Daiichi Nuclear Power Station
2013.6.28 Foundation Concrete Placing Work Started at the Miscellaneous Solid Waste Incineration Building
2013.6.26 Enhancement of Monitoring Plan at the East Side of Unit 1-4 Turbine Buildings and in the Port at Fukushima Daiichi Nuclear Power Station
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.6.15 Action towards monitoring and decontamination
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.4.27 The situation of trial operation of screening and decontamination area for vehicles at Fukushima Daiichi Nuclear Power Station
2012.4.20 Improvement of Environment around Monitoring Post of Fukushima Daiichi Nuclear Power Station (Result Report)
2012.4.20 Fukushima Daiichi Nuclear Power Station Case example of the Improvement of Environment around Monitoring Post
2012.4.16 General Plan and Start of Main Work of the Cover for Fuel Removal of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.3.26 Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
2012.3.13 Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
2012.3.12 Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
2012.3.2 Status of piping inside (Leakage point)
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.3 Radiation dose reduction by collecting dust and small rubbles at the parking lot in front of Main Anti-Earthquake Building of Fukushima Daiichi Nuclear Power Station
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2011.12.29 Water leakage (freshwater) from a hose of the water desalinations (reverse osmosis membrane system) near the concentrated water storage area at Fukushima Daiichi Nuclear Power Station
2011.12.21 Installation of Temporary Storage for Cesium Adsorption Tower
2011.12.19 Accumulated water in the trench between Process Main Building and Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in the Centralized Radiation Waste Treatment Facility at Fukushima Daiichi Nuclear Power Station
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.12.14 Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
2011.12.13 Leakage from Sampling Line of Evaporative Concentration System 3 C
2011.12.6 Outflow of water leaked from the evaporative condensation apparatus at Fukushima Daiichi Nuclear Power Station
2011.12.5 Fukushima Daiichi Nuclear Power Plant evaporative concentration apparatus, Leakage treatment with sandbags
2011.12.4 Leakage from evaporative condensation apparatus
2011.12.3 Series of Explanatory Videos Vol.2 No.3
2011.11.30 Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
2011.11.19 Series of Explanatory Videos Vol.3 No.1
2011.11.19 Debris removal works with heavy machinery at Fukushima Daiichi Nuclear Power
2011.11.12 Series of Explanatory Videos Vol.2 No.4
2011.11.8 Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.11.5 Series of Explanatory Videos Vol.2 No.3
2011.10.29 Series of Explanatory Videos Vol.2 No.2
2011.10.28 Ancillary facilities for cover panels of Unit 1(Completion of Cover Construction at Reactor Building of Unit 1 of Fukushima Daiichi NPS)
2011.10.22 Series of Explanatory Videos Vol.2 No.1
2011.10.14 Completion of installing the roof panel of the cover for the reactor building at Unit 1
2011.10.11 Overview of dust sampling at the openings of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.10.8 Installation Work of Roof Panels for Reactor Building Covers at Unit 1 of Fukushima Daiichi Nuclear Power Plant
2011.10.4 Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station
2011.9.28 Fukushima Daiichi Nuclear Power Station Restoration work of permeation prevention structure at the south side of the intake canal of Unit 1 to 4
2011.9.13 Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
2011.9.12 A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.9.10 Fukushima Daiichi Nuclear Power Station Dust sampling instrument for opening of Units 1 and 3 nuclear reactor buildings
2011.9.10 Unit 1, Fukushima Daiichi NPS, Construction of steel erection for cover of reactor building completed
2011.8.30 Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
2011.8.25 Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling
2011.8.23 Dust Sampling Facility (Basin)
2011.8.10 Status of iron frame construction for the reactor building cover of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.8.5 Stack drain pipe of exhaust stack of Units 1 and 2
2011.8.3 Place where high radiation dose was detected, Unit1, at Fukushima Daiichi Nuclear Power Station
2011.8.2 Main Exhaust Stuck of Unit 1/2
2011.7.7 Trial fitting of the cover for Unit 1, Fukushima Daiichi Nuclear Power Station at Onahama port
2011.7.5 Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
2011.6.30 Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.23 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.6.23 Shielding Wall of Unit 2
2011.6.15 Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station
2011.6.14 Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station
2011.6.14 Outline of Fukushima Daiichi Nuclear Power Plant unit1reactor building covering plan
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.5 Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
2011.6.4 Outline of water processing facilities
2011.5.28 Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station
2011.5.24 Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Mega Float entering the port
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.11 The situation of water stop at the pit near the water intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.11 The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.6 Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.4.16 a sandbag containing zeolite
2011.4.15 Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.7 Arrival of "Mega Float"
2011.4.6 Shutoff of water outflow was confirmed
2011.4.2 Near of the Sea Water intake of Unit2
2011.4.1 Dispersing Dust Protectant, Common Pool Area
2011.3.24 Temporary monitoring post

to TOP


  1. HOME
  2. Photo collection