Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
Upload dateJul 05,2011
Photo
Upper point of Unit 2 water intake(Before construction)
pictured on around May,2011
Upper point of Unit 2 water intake(After construction)
pictured on Jun 30,2011
Upper point of Unit 2 water intake(Installation work)
pictured on Jun 12,2011
Unit 2 water intake (from sea side)(After construction (front))
pictured on Jun 30,2011
Category
■Search by status/measures
Mitigation of radioactive materials / Work
■Pickup
Effect of tsunami