Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

March 2013

Upload dates
Title
2013.03.29 Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station
2013.03.29 Verification test performed at Fukushima Daini Nuclear Power Station as part of a research and development project "Development of remote decontamination technologies to be used inside buildings"
2013.03.29 Footage of TEPCO's TV conference
2013.03.28 The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
2013.03.27 Installation Work of the Net Preventing Fish from Moving Out Around Sea Embankments in the Port of Fukushima Daiichi NPS Completed at East Seawall Bank Side
2013.03.27 Progress Status of the Groundwater Bypass Construction
2013.03.27 Report of Inspection Results of the First Dry Storage Cask at Fukushima Daiichi Nuclear Power Station
2013.03.26 Hole Drilling for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.03.25 Progress of Investigation of Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station
2013.03.22 Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.)
2013.03.20 Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station (As of 4:30 PM on March 20)
2013.03.19 Results of Investigation of the Inside of Unit 2 PCV
2013.03.15 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.03.14 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.03.13 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.03.13 Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame
2013.03.11 Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.03.06 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.03.06 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.03.06 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: February 2013)
2013.03.05 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.03.04 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.03.01 Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation

to TOP


  1. HOME
  2. Photo collection