Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: February 2013)

Upload dateMar 6, 2013
Photo

●Permanent installation of the emergency diesel generator facilities (A) in Unit 1 Reactor Building Annex (February 13)

 

Trial operation (upper part of the diesel engine)
[Permanent installation completed on February 1, 2013]
(Photo taken on February 1, 2013)

Trial operation (lower part of the diesel engine)
[Permanent installation completed on February 1, 2013]
(Photo taken on February 1, 2013)
Trial operation (generator)
[Permanent installation completed on February 13, 2013]
(Photo taken on February 1, 2013)
Trial operation (control panel)
[Permanent installation completed on February 13, 2013]
(Photo taken on February 1, 2013)

●Carry-in and installation of the auxiliary facilities of the emergency diesel generator (H) in Unit 1 Reactor Building Annex (February 23)

 

Electric motor (Fresh water heater pump*1)installation completed
(Photo taken on February 27, 2013)

Electric motor (Lubricating oil priming pump*3) installation
[Completed on February 23, 2013]
(Photo taken on February 27, 2013)

●Permanent installation of the electric motors of the residual heat removal system cooling systems (A and C) in Unit 1 Seawater Heat Exchanger Building (February 12)

 

Temporary cable removal
(Photo taken on February 7, 2013)

Installation of the permanent cable terminals
(Photo taken on February 7, 2013)
Switching to the permanent cable completed
(Photo taken on February 7, 2013)
Trial operation of the electric motor of the residual heat removal system cooling system pump (A)
[Permanent installation (A&C) completed on February 12, 2013]
(Photo taken on February 7, 2013)

●Permanent installation of the electric motors of the residual heat removal system cooling seawater systems (A and C) in Unit 1 Seawater Heat Exchanger Building (February 8)

 

Before switching to the permanent cable
(Photo taken on February 8, 2013)

Switching to the permanent cable completed
(Photo taken on February 8, 2013)
Trial operation of the electric motor of the residual heat removal system cooling seawater system pump (C)
[Permanent installation completed on February 8, 2013]
(Photo taken on February 8, 2013)

●Permanent installation of the electric motor of the emergency diesel generator cooling system (A) in Unit 1 Seawater Heat  Exchanger (February 5)

 

Before switching to the permanent cable
(Photo taken on February 5, 2013)

Switching to the permanent cable completed
(Photo taken on February 5, 2013)
Trial operation of the electric motor of the emergency diesel generator cooling system (A)
[Permanent installation completed on February 5, 2013]
(Photo taken on February 5, 2013)

●Permanent installation of the electric motor of the make-up water condensate system (A) in Unit 1 Turbine Building (February 7)

 

Trial operation [Permanent installation completed on February 7, 2013]
(Photo taken on February 7, 2013)

●Permanent installation of the electric motor of the low pressure reactor core spray system in Unit 1 Reactor Building (February 23) 

 

Trial operation [Permanent installation completed on February 23, 2013]
(Photo taken on February 23, 2013)

●Permanent installation of Unit 1-2 discharge channel monitor (common facility) (February 18)

 

Function check
(Photo taken on February 12, 2013)

Function check
[Permanent installation completed on February 18, 2013]
(Photo taken on February 12, 2013)

●Overview of the nuclear disaster training (emergency training) at Fukushima Daini Nuclear Power Station

 

◎Training on securing power supply using a power supply car

 

Pulling out cable from a power supply car (Unit 2)

◎Training on debris removal, etc.

 

Heavy machinery heading to the site

◎Water injection into the reactor and the spent fuel pool

 

Preparing to transfer water to the Reactor Building (Unit 2)

◎Emergency radiation exposure medical training

 

First aid treatment by the medical team

Transportation via an emergency medical vehicle

 

 

 Photo taken by Tokyo Electric Power Company

Category

Search by status/measures

Others

to TOP


  1. HOME
  2. Photo collection