Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Fukushima Daini Nuclear Power Station

Upload dates
Title
2016.5.17 Relocation of the Control Room for Water Treatment Facilities into the Main Anti-Earthquake Building
2016.3.28 Completion of Drainage K Reconfigulation
2015.2.27 Completion of Unit 3 Reactor Opening at Fukushima Daini Nuclear Power Station
2015.1.28 Restart operation at Fukusima Daini Nuclear Power Station
2015.1.22 Safety Inspection at Nuclear Power Stations
2015.1.20 Regarding the fatal accident at Fukushima Daini NPS involving a cooperative company employee working in Units 1 and 2 waste treatment facility (controlled area)
2013.10.17 Completion of fuel transfer at Unit 2 in Fukushima Daini Nuclear Power Station
2013.7.26 Oil-like Substance Seen Floating in the Vicinity of Fukushima Daini Nuclear Power Station Unit 2 Water Intake Screening System
2013.7.12 Current status of Fukushima Daini Nuclear Power Station (July 2013)
2013.6.7 Overview of the Disaster Situation and the Restoration Condition at Fukushima Daini Nuclear Power Station
2013.4.11 Water Leakage from the Pipe Flange When the Water Transfer from the Underground Reservoir No.3 to No.6 was Started
2013.4.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: March 2013)
2013.3.29 Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station
2013.3.29 Verification test performed at Fukushima Daini Nuclear Power Station as part of a research and development project "Development of remote decontamination technologies to be used inside buildings"
2013.3.6 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.3.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: February 2013)
2013.2.18 Nuclear Disaster Training (Emergency Training) at Fukushima Daini Nuclear Power Station (Outline)
2013.2.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: January 2013)
2013.1.9 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: December 2012)
2012.12.28 Cause and countermeasure of air leakage from the main exhaust duct at Fukushima Daini Nuclear Power Station Unit 4
2012.12.21 Niigata Prefecture Technical Committee's Visit to Fukushima Daiichi NPS and Daini NPS
2012.12.13 Completion of inspection of the structures in Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.12.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: November 2012)
2012.11.30 Disclosure of the Video of our TV Conference (Second time)
2012.11.21 Investigation of the Inside of Unit 4 Suppression Chamber at Fukushima Daini Nuclear Power Station
2012.11.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
2012.10.15 Emergency Safety Training at Fukushima Daini Nuclear Power Station
2012.10.5 Footage of TEPCO's TV conference
2012.10.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: September 2012)
2012.9.24 Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.9.14 Removal work of the head of RPV at Unit 4 Fukushima Daini Nuclear Power Station
2012.9.10 Opening Unit 4 Reactor at Fukushima Daini Nuclear Power Station
2012.9.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: August 2012)
2012.8.9 Overview of our TV Conference System
2012.8.6 Footage of TEPCO's TV conference
2012.8.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: July 2012)
2012.7.4 TEPCO Chairman and President Visiting Fukushima Daiichi and Daini Nuclear Power Station
2012.7.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: June 2012)
2012.7.3 Training for the Deployment of Air-cooled Gas Turbine Power Supply Car and Control Vehicle (Start-up Operation) at Fukushima Daini Nuclear Power Station
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.5.9 Progress Status of Fukushima Daini Nuclear Power Station Recovery Plan(Monthly Report: April 2012)
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.27 Emergency Drill at Fukushima Daini Nuclear Power Station(Outline)
2011.12.17 Discussions at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the 6th floor of Unit 1 reactor building at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the main control room of Unit 1 and 2 at Fukushima Daini Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daini Nuclear Power Plant
2011.12.8 Emergency Security Measures "Nighttime Training" Conducted on Dec. 7
2011.10.15 "On-site Practicesite Practice", training of emergency countermeasures for safety at Fukushima Daini Nuclear Power Station
2011.9.6 Site Photographs of Fukushima Daini Nuclear Power Station
2011.8.30 Unit 4, Fukushima Daini Nuclear Power Station Accumulated water in Primary Containment Vessel
2011.8.30 Checking inside of the reactor containment vessel of Unit 4, Fukushima Daini Nuclear Power Station
2011.8.10 Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.7.31 Air leakage at Main Exhaust Stack of Unit 4, Fukushima Daini Nuclear Power Station
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.10 Fukushima Daini Nuclear Power Station Status of improvement on working conditions
2011.6.8 The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
2011.5.27 IAEA Fukushima Visit
2011.5.14 The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection