2014.04.28 Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima
2012.09.27 Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
2012.09.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.09.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.09.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.09.24 Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.09.18 Water Leakage from the Desalination System Reverse Osmosis Membrane) 3
2012.09.15 Expected members of the Nuclear Power Regulatory Agency visiting Fukushima Daiichi Nuclear Power Station
2012.09.14 Removal work of the head of RPV at Unit 4 Fukushima Daini Nuclear Power Station
2012.09.13 Removal of the RPV Lid in the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.09.11 (40)Around the Unit 4 Reactor Building
2012.09.11 (39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
2012.09.11 (38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
2012.09.11 (37)Unit 2 Transformer Area
2012.09.11 (36)Unit 1 Transformer Area
2012.09.11 (35)Unit 4 Instrument Air Compressor
2012.09.11 (34)Around the Unit 1 Large Equipment Hatch
2012.09.11 (33)Inside the Unit 2 Power Source Room
2012.09.11 (32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside)
2012.09.11 (31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside)
2012.09.11 (30)Sea side area of Unit 2
2012.09.11 (29)Sea side area of Unit 1
2012.09.11 (28)At Fukushima Daiichi Nuclear Power Station
2012.09.11 (27)Inside the Unit 2 Basement Power Source Room
2012.09.11 (26)Inside the Unit 2 Alternate Power Source Room
2012.09.11 (25)Around the Unit 2 Alternate Power Source Room
2012.09.11 (24)Inside the Unit 1 Power Source Room
2012.09.11 (23)Around the Outdoor Power Panel
2012.09.11 (22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
2012.09.11 (21)Inside Reserve Power Substation
2012.09.11 (20)Around Reserve Power Substation
2012.09.11 (19)Unit 6 Transformer Area
2012.09.11 (18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.09.11 (17)Unit 5 Transformer Area
2012.09.11 (16)Unit 5 and 6 Switchyard Area (Outside)
2012.09.11 (15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4.
2012.09.11 (14)Inside the Unit 5 Power Source Room
2012.09.11 (13)Inside the Unit 5 and 6 Vertical Shafts
2012.09.11 (12)Inside the Unit 6 Power Source Room
2012.09.11 (11)Inside the Unit 5 and 6 Transmission Board Room
2012.09.11 (10)Inside the Unit 5 and 6 Main Control Room
2012.09.11 (9)Sea side area of Unit 5 and 6
2012.09.11 (8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3
2012.09.11 (7)Appearance of Unit 1 after the explosion
2012.09.11 (6)The situation at Fukushima Daiichi Nuclear Power Station in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.09.11 (5)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
2012.09.11 (4)The situation at Fukushima Daiichi Nuclear Power Station after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.09.11 (3)The situation at Fukushima Daiichi Nuclear Power Station (Main Office Building, etc.) after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.09.11 (2)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit (Undertow)
2012.09.11 (1)The shallow draft quay in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.09.11 Framework for the Nuclear Reform(Video Message)
2012.09.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.09.10 Damage of Unit 2 PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.09.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.09.10 Opening Unit 4 Reactor at Fukushima Daini Nuclear Power Station
2012.09.06 Inspection of the Inside of the Treated Water Buffer Tank
2012.09.03 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: August 2012)