Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Unit5

Upload dates
Title
2017.2.27 Videos to show the interior of the Unit 5 Primary Containment Vessel (PCV) (Reference videos for Unit 1 PCV investigation)
2015.4.1 Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle)
2015.3.24 Fire on the bank of the road on the west side of Units 5 and 6 in the premises of Fukushima-Daiichi Nuclear Power Station
2014.7.24 Puddle found at Unit 5 Reactor Building 5th floor (operating floor),Fukushima Daiichi NPS
2014.7.9 Suspension of the cooling system for spent fuel pool due to the shut down of the component cooling seawater system at Unit 5 of Fukushima Daiichi Nuclear Power Station
2014.3.7 Results of Investigation of Building Frames of Unit 1 Reactor Building at Fukushima Daiichi NPS
2013.9.13 Water Leakage from the Washing Tank of RO Apparatus for Unit 5 and 6 at Fukushima Daiichi NPS
2013.4.8 Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.2.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.12.25 Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.5 Inspection Results of Unit 5 Residual Heat Removal System Seawater Pump (C) at Fukushima Daiichi Nuclear Power Station
2012.12.3 National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.10.10 An Issue Found with the Minimum Flow Rate Bypass Valve of Unit 5 Reactor Core Spray System (B) at Fukushima Daiichi Nuclear Power Station
2012.10.1 Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station
2012.9.11 (18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (17)Unit 5 Transformer Area
2012.9.11 (16)Unit 5 and 6 Switchyard Area (Outside)
2012.9.11 (14)Inside the Unit 5 Power Source Room
2012.9.11 (13)Inside the Unit 5 and 6 Vertical Shafts
2012.9.11 (11)Inside the Unit 5 and 6 Transmission Board Room
2012.9.11 (10)Inside the Unit 5 and 6 Main Control Room
2012.9.11 (9)Sea side area of Unit 5 and 6
2012.7.25 Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2011.10.24 Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.9.24 Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS
2011.8.10 Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.7.3 Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
2011.6.2 Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.5.31 Oil slick near the cartain wall of the Unit 5 and 6
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work

to TOP


  1. HOME
  2. Photo collection