Fukushima Daiichi Nuclear Power Station Current status of restoration work

Reactor buildings of Unit 1 and 2
pictured on May 06,2011

Truck with nitrogen supply equipment
pictured on May 06,2011

pictured on May 06,2011

Removal of rubble by an unmanned heavy machinery
pictured on May 06,2011

Crawler dump truck for spraying dust inhibitor
pictured on May 06,2011

Spraying dust inhibitor by a crawler dump truck
pictured on May 06,2011

Water spray to the spent fuel pool of Unit 4 by a concrete pumping vehicle
pictured on May 06,2011

Temporary substation for Unit 1 and 2
pictured on May 06,2011

Concrete placement to the vertical shaft of Unit 2 (1)
pictured on May 06,2011

Concrete placement to the vertical shaft of Unit 2 (2)
pictured on May 06,2011

Dust inhibitor sprayed around the circulating water pump of Unit 3
pictured on May 06,2011

Cable trench pit for the water intake of Unit 2
pictured on May 06,2011

pictured on May 06,2011

Steel sheet piles at the water intake of Unit 2
pictured on May 06,2011

Silt fence installed around the water intake of Unit 2
pictured on May 06,2011

Temporary motor driven pump for water injection to the reactors of Unit1 to 3
pictured on May 06,2011

Heavy oil tank swept up by Tsunami
pictured on May 06,2011

Suppression pool's water surge-tank near Unit 5 and 6
pictured on May 06,2011

Ultrahigh voltage switching station of Unit 5 and 6
pictured on May 06,2011

Temporary tank installed near Unit 5 and 6 (1)
pictured on May 06,2011

Temporary tank installed near Unit 5 and 6 (2)
pictured on May 06,2011

Building for diesel generator 6B of Unit 6
pictured on May 06,2011

pictured on May 06,2011

pictured on May 06,2011

Administration Office Building (exterior)
pictured on May 06,2011

Administration Office Building (interior 1)
pictured on May 06,2011

Administration Office Building (interior 2)
pictured on May 06,2011

1st floor of the turbine building of Unit 1(1)
pictured on May 06,2011

1st floor of the turbine building of Unit 1(2)
pictured on May 06,2011

Local exhauster installed in the turbine building of Unit 1
pictured on May 06,2011

Positive pressure room installed at the turbine building of Unit 1
pictured on May 06,2011

Entrance of Main Anti-Earthquake Building(A prefabricated house used for access control)
pictured on May 06,2011

Measurement of radioactivity in Main Anti-Earthquake Building
pictured on May 06,2011

Spare protective equipments(1)
pictured on May 06,2011

Spare protective equipments(2)
pictured on May 06,2011

Entrance of Main Anti-Earthquake Building(from inside)
pictured on May 06,2011

pictured on May 06,2011

Water supply area of Main Anti-Earthquake Building
pictured on May 06,2011

Passing forward daily commodities in Main Anti-Earthquake Building
pictured on May 06,2011

Encouraging messages posted on the walls of Main Anti-Earthquake Building
pictured on May 06,2011
Fukushima Daiichi Nuclear Power Station Current status of restoration work
Video on May 06,2011
Category
■Search by status/measures
Status of the accident / Cooling of reactors / Mitigation of radioactive materials / Survey / Work / Others