Fukushima Daiichi Nuclear Power Station Current status of restoration work
Reactor buildings of Unit 1 and 2
pictured on May 06,2011
Truck with nitrogen supply equipment
pictured on May 06,2011
pictured on May 06,2011
Removal of rubble by an unmanned heavy machinery
pictured on May 06,2011
Crawler dump truck for spraying dust inhibitor
pictured on May 06,2011
Spraying dust inhibitor by a crawler dump truck
pictured on May 06,2011
Water spray to the spent fuel pool of Unit 4 by a concrete pumping vehicle
pictured on May 06,2011
Temporary substation for Unit 1 and 2
pictured on May 06,2011
Concrete placement to the vertical shaft of Unit 2 (1)
pictured on May 06,2011
Concrete placement to the vertical shaft of Unit 2 (2)
pictured on May 06,2011
Dust inhibitor sprayed around the circulating water pump of Unit 3
pictured on May 06,2011
Cable trench pit for the water intake of Unit 2
pictured on May 06,2011
pictured on May 06,2011
Steel sheet piles at the water intake of Unit 2
pictured on May 06,2011
Silt fence installed around the water intake of Unit 2
pictured on May 06,2011
Temporary motor driven pump for water injection to the reactors of Unit1 to 3
pictured on May 06,2011
Heavy oil tank swept up by Tsunami
pictured on May 06,2011
Suppression pool's water surge-tank near Unit 5 and 6
pictured on May 06,2011
Ultrahigh voltage switching station of Unit 5 and 6
pictured on May 06,2011
Temporary tank installed near Unit 5 and 6 (1)
pictured on May 06,2011
Temporary tank installed near Unit 5 and 6 (2)
pictured on May 06,2011
Building for diesel generator 6B of Unit 6
pictured on May 06,2011
pictured on May 06,2011
pictured on May 06,2011
Administration Office Building (exterior)
pictured on May 06,2011
Administration Office Building (interior 1)
pictured on May 06,2011
Administration Office Building (interior 2)
pictured on May 06,2011
1st floor of the turbine building of Unit 1(1)
pictured on May 06,2011
1st floor of the turbine building of Unit 1(2)
pictured on May 06,2011
Local exhauster installed in the turbine building of Unit 1
pictured on May 06,2011
Positive pressure room installed at the turbine building of Unit 1
pictured on May 06,2011
Entrance of Main Anti-Earthquake Building(A prefabricated house used for access control)
pictured on May 06,2011
Measurement of radioactivity in Main Anti-Earthquake Building
pictured on May 06,2011
Spare protective equipments(1)
pictured on May 06,2011
Spare protective equipments(2)
pictured on May 06,2011
Entrance of Main Anti-Earthquake Building(from inside)
pictured on May 06,2011
pictured on May 06,2011
Water supply area of Main Anti-Earthquake Building
pictured on May 06,2011
Passing forward daily commodities in Main Anti-Earthquake Building
pictured on May 06,2011
Encouraging messages posted on the walls of Main Anti-Earthquake Building
pictured on May 06,2011
Fukushima Daiichi Nuclear Power Station Current status of restoration work
Video on May 06,2011
Category
■Search by status/measures
Status of the accident / Cooling of reactors / Mitigation of radioactive materials / Survey / Work / Others