| 2022.5.23 |  Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 19) at the Fukushima Daiichi Nuclear Power Station | 
												| 2022.5.19 |  Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 17 and 18) at the Fukushima Daiichi Nuclear Power Station | 
												| 2022.3.24 |  Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between March 14~16) at the Fukushima Daiichi Nuclear Power Station | 
												| 2022.3.14 |  Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (Preliminary report) at the Fukushima Daiichi Nuclear Power Station | 
												| 2019.2.13 |  Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Investigation Results - Preliminary Report on February 13 - | 
												| 2018.4.26 |  3D Reconstruction Results based on Unit 3 Primary Containment Vessel Internal Investigation | 
							| 2018.4.26 |  Analysis Results of Unit 2 Primary Containment Vessel Internal Investigation | 
												| 2018.2.28 |  Internal Dose Investigation of the Unit 3 Reactor Building using a Drone | 
												| 2018.1.19 |  Progress of Unit 2 PCV internal investigation (Preliminary report of January 19 investigation) | 
												| 2017.11.30 |  Partial damage to temperature gauge cables for the Reactor Pressure Vessel (RPV) found during the Fukushima Daiichi NPS Unit 3 Primary Containment Vessel (PCV) internal investigation | 
							| 2017.11.30 |  Image analysis results of Unit 3 PCV internal investigation at Fukushima Daiichi NPS | 
							| 2017.11.30 |  Processed image of Unit 2 PCV internal investigation at Fukushima Daiichi NPS | 
												| 2017.7.27 |  Locating Fuel Debris inside the Unit 3 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report) | 
												| 2017.7.22 |  Progress of Unit 3 PCV internal investigation (Preliminary report of July 22 investigation) | 
												| 2017.7.21 |  Progress of Unit 3 PCV internal investigation (Preliminary report of July 21 investigation) | 
												| 2017.7.19 |  Progress of Unit 3 PCV internal investigation (Preliminary report of July 19 investigation) | 
												| 2017.5.25 |  Unit 3 PCV Internal Investigation at Fukushima Daiichi NPS (remotely operated underwater vehicle) | 
												| 2017.5.23 |  Unit 3 PCV Internal Investigation at Fukushima Daiichi NPS (image of remotely operated underwater vehicle) | 
												| 2017.4.7 |  Unit 1 Primary Containment Vessel Internal Investigation(deposition sample collection) | 
												| 2017.4.3 |  Unit 1 Primary Containment Vessel internal investigation (State of the field work) | 
												| 2017.3.30 |  Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (addendum report with image analysis) | 
												| 2017.3.27 |  Unit 1 Primary Containment Vessel Internal Investigation | 
												| 2017.3.23 |  Progress of Unit 1 PCV internal investigation (Preliminary report of March 22 investigation) | 
												| 2017.3.22 |  Progress of Unit 1 PCV internal investigation (Preliminary report of March 21 investigation) | 
												| 2017.3.21 |  Progress of Unit 1 PCV internal investigation (Preliminary report of March 19 and 20 investigations) | 
												| 2017.3.19 |  Progress of Unit 1 PCV internal investigation (Preliminary report of March 18 investigation) | 
												| 2017.3.18 |  Progress of Unit 1 PCV internal investigation (Beginning of the investigation) | 
												| 2017.2.16 |  Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Investigation results by the self-propelled investigation device) | 
												| 2017.2.15 |  Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (By the self-propelled investigation device) | 
												| 2017.2.9 |  Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Results of deposit removal work) | 
												| 2017.2.2 |  Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (examination results of digital images) | 
												| 2017.1.30 |  Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel investigation at Fukushima Daiichi Nuclear Power Station | 
												| 2017.1.26 |  Pre-investigation results of X-6 penetration for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station | 
												| 2016.9.26 |  Radiation Dose Survey for the Units 1-2 Exhaust Stack at Fukushima Daiichi Nuclear Power Station | 
												| 2016.7.28 |  Locating Fuel Debris inside the Unit 2 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station | 
												| 2016.5.26 |  Progress in Fuel Debris Detection Inside the Unit 2 Reactor Using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report) | 
												| 2015.10.22 |  Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 22) | 
												| 2015.10.20 |  Investigation Results of the Inside of Unit 3 Primary Containment Vessel (PCV) at the Fukushima Daiichi Nuclear Power Station (Prompt report as of October 20) | 
												| 2015.10.16 |  Investigation Results inside Unit 3 Spent Fuel Pool using a Waterproof Camera in Fukushima Daiichi Nuclear Power Station | 
												| 2015.4.30 |  "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Results of site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - | 
												| 2015.4.20 |  "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"- Results of follow up check after the site test "Investigation B1"on grating around the pedestal inside Unit 1 PCV - [Report for April 18 and April 19, 2015] | 
												| 2015.4.17 |  (4/20 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - [Prompt report for April 16, 2015] | 
												| 2015.4.16 |  (4/17 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -[Prompt report for April 15] | 
												| 2015.4.13 |  "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" -Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV- | 
												| 2015.4.10 |  "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"‐Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV‐(Prompt report of inspection commencement on April 10, 2015) | 
												| 2015.4.1 |  Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle) | 
												| 2015.3.19 |  Reactor Imaging Technology for Fuel Debris Detection by Cosmic Ray Muon, Measurement Status Report in Unit-1 | 
												| 2015.3.11 |  Water Level Reduction containing Rainwater within the Outer Dyke  around the "H4" Tank Area at Fukushima Daiichi NPS | 
												| 2014.12.20 |  Spraying Anti-scattering Agents and Survey Result for Unit 1 Building Cover Demolition | 
												| 2014.9.30 |  Results of Research Concerning Exterior Section under S/C (Suppression Chamber) at Unit 2 | 
												| 2014.9.9 |  Demonstration Test of the Exterior Surface Survey Equipment for the Lower Part of the Suppression Chamber under Development at the Research and Development of "Development of Survey/Repair (Water stoppage) Technologies for Watering the Containment Vessel" | 
												| 2014.7.29 |  Survey of wall of torus room in Unit 2 in Fukushima Daiichi NPS (Report for demonstration survey in R & D project) | 
												| 2014.7.24 |  Puddle found at Unit 5 Reactor Building 5th floor (operating floor),Fukushima Daiichi NPS | 
												| 2014.7.15 |  Fire from a generator equipped to supply electricity to the air conditioner of a worker rest house at east side of Fukushima Daiichi NPS | 
												| 2014.7.9 |  Suspension of the cooling system for spent fuel pool due to the shut down of the component cooling seawater system at Unit 5 of Fukushima Daiichi Nuclear Power Station | 
												| 2014.6.23 |  Start of decontamination by remote-controlled decontamination device on 1st Floor inside Unit 3 R/B at Fukushima Daiichi NPS | 
												| 2014.6.16 |  Survey on Torus room wall in Unit 1 of Fukushima Daiichi Nuclear Power Station | 
												| 2014.5.30 |  Demonstration test of survey equipment for the upper part of S/C (Pressure Suppression Chamber) at Unit 1 of the Fukushima Daiichi Nuclear Power Station. | 
												| 2014.5.27 |  Results of Investigation on Upper Parts of S/C of Unit 1 at Fukushima Daiichi NPS | 
												| 2014.5.16 |  Investigation Results Inside Unit 3 Main Steam Isolation Valve Room at Fukushima Daiichi NPS | 
												| 2014.5.1 |  External visual inspection results of the fuels removed from the spent fuel pool for Unit 4 at the Fukushima Daiichi Nuclear Power Station | 
												| 2014.4.28 |  Investigation of the Inside of the Spent Fuel Pool for Fuel Removal from the Upper Part of Unit 3 Reactor Building at Fukushima | 
												| 2014.3.7 |  Results of Investigation of Building Frames of Unit 1 Reactor Building at Fukushima Daiichi NPS | 
												| 2014.2.21 |  Water Overflow from the flange of the top panel at the upper part of H6 tank area | 
												| 2014.2.14 |  Investigation results of building flames after rubbles were removed from the upper part of the reactor building at Unit 3 of Fukushima Daiichi NPS | 
												| 2014.1.30 |  Investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
							| 2014.1.30 |  Confirmation of cracks by investigation into deformed fuel assemblies in the spent fuel pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
												| 2014.1.21 |  Results of Water Level Measuring inside the Suppression Chamber (S/C) at the Unit 2 in Fukushima Daiichi NPS | 
												| 2013.12.27 |  Cracks Found during Inspection on Fuel Assembly Having Deformation in Fukushima Daiichi NPS Unit 4 Spent Fuel Pool | 
												| 2013.12.6 |  Measuring Radiation Dose at the Lower Part of Unit 1 and 2 Exhaust Stack in Fukushima Daiichi NPS | 
							| 2013.12.6 |  (A video was added on December 13)Results of Investigation into Building Frames around Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS | 
												| 2013.11.14 |  Results of Investigation around Lower Parts of Unit 1 Vent Pipes at Fukushima Daiichi NPS(Second Day) | 
												| 2013.11.13 |  (A video was added on November 15) Results of Investigation around Lower Parts of Unit 1 Vent Pipes at Fukushima Daiichi NPS(First Day) | 
												| 2013.10.8 |  Investigation into the Bottom Plate etc. of the Tank No.5 in H4 Area at Fukushima Daiichi NPS | 
												| 2013.9.29 |  Flow Rate Decrease of Slurry Transfer Pump of Multi-nuclide Removal Equipment System C | 
												| 2013.9.25 |  Vacuum Test for the Tank Bottom Plate | 
												| 2013.9.20 |  Investigation of the Inside of Tank No.5 in H4 Area | 
												| 2013.9.18 |  Investigation into Building Frames around at Unit 1 Reactor Building Equipment Hatch at Fukushima Daiichi NPS | 
												| 2013.9.4 |  Investigation Results of Groundwater Inflow at Unit 1 Turbine Building and the Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.28 |  Results of the Sixth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.22 |  Results of Full Check of the Bolt Fastening Tanks at Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.13 |  Results of Additional Investigation Based on Leakage from Batch Treatment Tank of the Multi-nuclide Removal Equipment (Follow-up Information) | 
							| 2013.8.13 |  Investigation of Unit 3, 4 Seaside Trench at Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.12 |  Investigation Results of the Inside of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.9 |  Results of Inside Investigation of the Reactor Well, the RPV and the Spent Fuel Pool at Unit 4 in Fukushima Daiichi Nuclear Power Station | 
												| 2013.8.2 |  Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.31 |  Prior Confirmation Ahead of Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.26 |  Removal of the Obstacles Including Debris, etc., on the First Floor of the Reactor Building of the Fukushima Daiichi Nuclear Power Station Unit 3 | 
												| 2013.7.24 |  Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.23 |  Surveys on radioactive substances | 
												| 2013.7.22 |  Infrared-thermography Measurement at the Upper Part of Unit 3 Reactor Building in Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.19 |  Findings Regarding the Exit of a Contaminated Vehicle from the Fukushima Daiichi NPS | 
							| 2013.7.19 |  Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings | 
												| 2013.7.17 |  Inspections of Water Intake Power Cable Trenches at Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.16 |  Photos of the groundwater observation holes at Fukushima Daiichi Nuclear Power Station | 
												| 2013.7.8 |  Investigation of Radioactive Materials | 
												| 2013.6.19 |  Results of Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building | 
												| 2013.6.17 |  Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building | 
												| 2013.5.29 |  Results of the Fifth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.4.16 |  Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.4.12 |  Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station | 
												| 2013.4.10 |  Replacement of a High Integrity Container (HIC) of the Multi-nuclide Removal Equipment at Fukushima Daiichi Nuclear Power Station | 
												| 2013.4.9 |  Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.27 |  Report of Inspection Results of the First Dry Storage Cask at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.25 |  Progress of Investigation of Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.20 |  Power Supply Facilities Failure at Fukushima Daiichi Nuclear Power Station (As of 4:30 PM on March 20) | 
												| 2013.3.19 |  Results of Investigation of the Inside of Unit 2 PCV | 
												| 2013.3.15 |  Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.14 |  Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.13 |  Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.6 |  Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.5 |  Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
												| 2013.3.1 |  Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation | 
												| 2013.2.22 |  Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera | 
							| 2013.2.22 |  Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 2) | 
												| 2013.2.21 |  Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 1) | 
							| 2013.2.21 |  Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18) | 
												| 2013.2.15 |  Investigation of the fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station(Video on Nov 30, 2012) | 
												| 2013.2.14 |  Drilling Holes for the Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station | 
												| 2013.2.13 |  Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
							| 2013.2.13 |  Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2013.2.7 |  Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011) | 
												| 2013.1.28 |  Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima  Daiichi Nuclear Power Station | 
												| 2012.12.13 |  Completion of inspection of the structures in Unit 4 reactor at Fukushima Daini Nuclear Power Station | 
												| 2012.12.11 |  Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station | 
							| 2012.12.11 |  Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test) | 
												| 2012.11.29 |  Results of the Third Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.11.28 |  Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station | 
												| 2012.11.27 |  Investigation Results of Suspension of Unit 3 Spent Fuel Pool Desalination System (Mobile RO) and Hydrochloric Acid Leakage at Fukushima Daiichi Nuclear Power Station | 
												| 2012.11.26 |  Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station | 
												| 2012.11.21 |  Investigation of the Inside of Unit 4 Suppression Chamber at Fukushima Daini Nuclear Power Station | 
												| 2012.11.1 |  Investigation Results of Smoke Coming out from Electric Motors in the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station | 
												| 2012.10.24 |  Results of Reinvestigation of Unit 1 Operation Floor at Fukushima Daiichi Nuclear Power Station | 
												| 2012.10.15 |  Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13) | 
							| 2012.10.15 |  Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12) | 
												| 2012.10.12 |  Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP | 
												| 2012.10.11 |  Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP | 
												| 2012.10.10 |  Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP | 
												| 2012.10.3 |  Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station | 
							| 2012.10.3 |  Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority | 
												| 2012.10.1 |  Flow Rate Decrease of Unit 5 Residual Heat Removal Seawater System Pump (A) at Fukushima Daiichi Nuclear Power Station | 
												| 2012.9.27 |  Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station | 
												| 2012.9.26 |  Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26) | 
												| 2012.9.25 |  Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station | 
												| 2012.9.24 |  Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station | 
							| 2012.9.24 |  Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station | 
												| 2012.9.6 |  Inspection of the Inside of the Treated Water Buffer Tank | 
												| 2012.8.30 |  Results of the Second Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.29 |  Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
												| 2012.8.28 |  Soundness Investigation of the Unused (Unirradiated) Fuel Removed from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station | 
												| 2012.7.13 |  Accumulated Water Found in the Radioactive Waste Underground Storage Facility at Unit 3 of Fukushima Daiichi Nuclear Power Station | 
							| 2012.7.13 |  【Movie】Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation | 
												| 2012.7.12 |  Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation | 
												| 2012.7.11 |  Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Operating Floor Area Investigation | 
												| 2012.7.6 |  Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection | 
												| 2012.7.5 |  Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station | 
							| 2012.7.5 |  “Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation | 
												| 2012.6.27 |  Fukushima Daiichi Nuclear Power Station Unit 1 Reactor Building Torus Room Investigation Result (June 26, 2012) | 
												| 2012.6.14 |  Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection | 
												| 2012.6.12 |  Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera | 
												| 2012.6.7 |  Result of Water Level Measurement at Unit 2-3 Torus Room of  Fukushima Daiichi Nuclear Power Station | 
							| 2012.6.7 |  The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station | 
												| 2012.5.30 |  Site Investigation Result of the Accumulated Water Found at Unit 3 Radiation Waste Underground Storage Facility Building At Fukushima Daiichi Nuclear Power Station (May 28-29) | 
												| 2012.5.25 |  【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building | 
												| 2012.5.24 |  Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012) | 
												| 2012.4.20 |  【Video】 Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station | 
												| 2012.4.19 |  Inspection of the equipment hatch of PCV in Unit 3 of Fukushima Daiichi Nuclear Power Station | 
							| 2012.4.19 |  Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building | 
												| 2012.4.18 |  Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant | 
												| 2012.4.17 |  Overveiw of the Robot(Survey Runner) | 
												| 2012.4.16 |  【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station | 
												| 2012.4.13 |  Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.30 |  Sampling of fish and shellfish on the ocean area within 20km of Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.27 |  Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS | 
							| 2012.3.27 |  【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant | 
												| 2012.3.26 |  Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant | 
												| 2012.3.23 |  Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2 | 
												| 2012.3.22 |  Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station | 
							| 2012.3.22 |  Result of transparency investigation inside the spent fuel pool of Unit 4,  Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.16 |  The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi | 
							| 2012.3.16 |  Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2) | 
												| 2012.3.15 |  Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS | 
												| 2012.3.14 |  Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS | 
												| 2012.3.12 |  Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report) | 
							| 2012.3.12 |  Survey on Distribution of Debris in Unit 4 Spent Fuel Pool, Fukushima Daiichi Nuclear Power Station | 
												| 2012.3.2 |  Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station | 
												| 2012.2.28 |  Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station | 
												| 2012.2.10 |  Fukushima Daiichi Nuclear Power Station Start of marine soil coating construction inside the port | 
												| 2012.1.30 |  Fukushima Daiichi Nuclear Power Station; Investigation results of the bottom of the sea in front of Units 5-6 Water Intakes | 
												| 2012.1.28 |  The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station | 
												| 2012.1.21 |  The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building) | 
												| 2012.1.20 |  Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station | 
												| 2012.1.19 |  Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station | 
												| 2012.1.18 |  Inspection Status at Minami-iwaki Switching Station | 
							| 2012.1.18 |  Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5   for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2 | 
												| 2012.1.12 |  Status of inspection work of the main turbine of Unit 4 | 
												| 2011.12.27 |  Results of Boring and Trenching Survey on Yunotake Fault | 
												| 2011.12.14 |  Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant. | 
												| 2011.12.1 |  Nuclide analysis results of ocean soil - inside the Port entrance of Fukushima Daiichi Nuclear Power Plant | 
												| 2011.11.25 |  Fukushima Daiichi Nuclear Power Station Operation of Unmanned Survey Ship | 
												| 2011.11.22 |  Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel | 
												| 2011.11.21 |  Status of investigation on Yunotake Fault (quick report) | 
							| 2011.11.21 |  Start of operation of unmanned investigation boat Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.18 |  Current Status of Tsunami Sediments Study Around the Coast of Kashiwazaki Kariwa Nuclear Power Station The First Day of Investigation (November 15, 2011) Investigation in Miyagawa, Kashiwazaki | 
												| 2011.11.16 |  Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.10 |  Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.8 |  Situation of Southern Side of Aperture, Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.5 |  Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station | 
												| 2011.11.2 |  Overview of the blocking operation of the units 1 - 4 openings | 
												| 2011.10.22 |  Status of equipment hatch in the reactor building at Unit 3, Fukushima Daiichi Nuclear Power Station | 
												| 2011.10.21 |  Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station | 
							| 2011.10.21 |  Isolation Condenser of Unit 1, Fukushima Daiichi Nuclaer Power Station | 
							| 2011.10.21 |  Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot | 
												| 2011.10.15 |  Result of temperature measurement by infrared camera from right above the reactor | 
												| 2011.10.14 |  Survey results of pipe penetration on 1st floor of Unit 1 reactor building | 
												| 2011.10.4 |  Overview of dust sampling at apertural area of Unit 1 Reactor Building in Fukushima Daiichi Nuclear Power Station | 
												| 2011.9.28 |  JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station | 
												| 2011.9.13 |  Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3 | 
												| 2011.9.12 |  A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station | 
												| 2011.8.30 |  Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station | 
							| 2011.8.30 |  Checking inside of the reactor containment vessel of Unit 4, Fukushima Daini Nuclear Power Station | 
												| 2011.8.25 |  Fukushima Daiichi Nuclear Power Station Unit 3 Apertural Area of Reactor Building Scene from dust sampling | 
												| 2011.7.28 |  Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building | 
												| 2011.7.27 |  Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince | 
												| 2011.7.16 |  Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince | 
												| 2011.7.2 |  Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station | 
												| 2011.6.30 |  Results of Investigation on 5th Floor of the Reactor Building Unit 4 | 
												| 2011.6.23 |  Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 | 
												| 2011.6.20 |  Robot:Quince | 
							| 2011.6.20 |  Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.6.15 |  Result of radiation dose survey at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station | 
												| 2011.6.14 |  Sampling of ambient radioactive substances at the upper part of R/B, Unit 3, Fukushima Daiichi Nuclear Power Station | 
												| 2011.6.11 |  Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station | 
												| 2011.6.8 |  The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station | 
												| 2011.6.4 |  Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1 | 
												| 2011.5.24 |  Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station | 
												| 2011.5.19 |  The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2 | 
												| 2011.5.17 |  Fukushima Daiichi Nuclear Power Station Current status of restoration work | 
												| 2011.5.12 |  Inspection Status of the Indicator (Water level indicator A, fuel area) at Unit 1, Fukushima Daiichi Nuclear Power Station | 
												| 2011.5.10 |  Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.5.8 |  Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station | 
												| 2011.5.6 |  Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 | 
												| 2011.5.3 |  Site observation by the packbot in the nuclear reactor building of Unit 1 | 
												| 2011.4.29 |  Site observation by the packbot in the nuclear reactor building of Unit 1 | 
							| 2011.4.29 |  The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.28 |  Robot, Truck etc. | 
												| 2011.4.27 |  Movies taken from T-Hawk | 
							| 2011.4.27 |  Site observation by the packbot in the nuclear reactor building of Unit 1 | 
												| 2011.4.20 |  The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video) | 
												| 2011.4.19 |  The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture) | 
												| 2011.4.17 |  Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3. | 
												| 2011.4.16 |  Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station | 
												| 2011.4.15 |  A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station | 
							| 2011.4.15 |  Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station |