Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
Upload dateNov 10,2011
Photo
The status of the 5th floor in the Reactor Building of Unit 4
Rebar deformed upward
pictured on Nov 08,2011
Floor curled up
pictured on Nov 08,2011
Floor pushed up
pictured on Nov 08,2011
pictured on Nov 08,2011
Wire mesh, inlet of the air-conditioning at Reactor Well was bent to the reverse direction
pictured on Nov 08,2011
pictured on Nov 08,2011
Wire mesh, inlet of the air-conditioning at Spent Fuel Pool was bent to the reverse direction
pictured on Nov 08,2011
pictured on Nov 08,2011
The status of the 4th floor in the Reactor Building of Unit 4
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Floor pushed down
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts (no air-conditioning ducts above)
pictured on Nov 08,2011
pictured on Nov 08,2011
The original place of installation of air- conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
The status of the 3rd floor in the Reactor Building of Unit 4
Damages to the floor
pictured on Nov 08,2011
Floor pushed down (in front is rubbles from air-conditioning ducts)
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Rubbles from air-conditioning ducts
pictured on Nov 08,2011
pictured on Nov 08,2011
Category
■Search by status/measures
Status of the accident / Survey