2024.9.10
|
Fukushima Daiichi Nuclear Power Station Commencement of the Unit 2 fuel debris trial retrieval
|
2024.1.31
|
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
|
2020.6.11
|
Completion of the Internal Investigation of the Unit 2 Spent Fuel Pool (SFP) at the Fukushima Daiichi Nuclear Power Station
|
2020.6.10
|
Start of Internal Investigation of the Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool (SFP)
|
2019.2.13
|
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Investigation Results - Preliminary Report on February 13 -
|
2018.5.28
|
Wall Dismantling Work to create an Opening in the West Wall of Unit 2 Reactor Building
|
2018.4.26
|
Analysis Results of Unit 2 Primary Containment Vessel Internal Investigation
|
2018.1.19
|
Progress of Unit 2 PCV internal investigation (Preliminary report of January 19 investigation)
|
2017.11.30
|
Processed image of Unit 2 PCV internal investigation at Fukushima Daiichi NPS
|
2017.3.30
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (addendum report with image analysis)
|
2017.2.16
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Investigation results by the self-propelled investigation device)
|
2017.2.15
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (By the self-propelled investigation device)
|
2017.2.9
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Results of deposit removal work)
|
2017.2.2
|
Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (examination results of digital images)
|
2017.1.30
|
Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel investigation at Fukushima Daiichi Nuclear Power Station
|
2017.1.26
|
Pre-investigation results of X-6 penetration for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station
|
2016.12.26
|
Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
|
2016.12.24
|
Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
|
2016.9.26
|
Radiation Dose Survey for the Units 1-2 Exhaust Stack at Fukushima Daiichi Nuclear Power Station
|
2016.7.28
|
Locating Fuel Debris inside the Unit 2 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
|
2016.5.26
|
Progress in Fuel Debris Detection Inside the Unit 2 Reactor Using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report)
|
2016.3.17
|
The Detection of Fuel Debris inside the Unit 2 Reactor using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
|
2015.7.10
|
Fukushima Daiichi Nuclear Power Plant Filling Unit 2 Seawater pipe trench
|
2014.10.17
|
Gap-filling Starts: Progress of Water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi Nuclear Power Station
|
2014.9.30
|
Results of Research Concerning Exterior Section under S/C (Suppression Chamber) at Unit 2
|
2014.7.29
|
Survey of wall of torus room in Unit 2 in Fukushima Daiichi NPS (Report for demonstration survey in R & D project)
|
2014.1.21
|
Results of Water Level Measuring inside the Suppression Chamber (S/C) at the Unit 2 in Fukushima Daiichi NPS
|
2013.12.6
|
Measuring Radiation Dose at the Lower Part of Unit 1 and 2 Exhaust Stack in Fukushima Daiichi NPS
|
2013.11.27
|
Decontamination work on the first floor at Unit 2 reactor building in Fukushima Daiichi NPS
|
2013.9.18
|
Fracture Found on Steel Members (Diagonal Bracings) in the Intermediate Section of the Exhaust Stack for Units 1 and 2 at Fukushima Daiichi NPS
|
2013.8.15
|
Installation of Permanent Monitoring Instrument of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
|
2013.8.12
|
Investigation Results of the Inside of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
|
2013.7.31
|
Prior Confirmation Ahead of Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
|
2013.7.24
|
Results of Survey on the PCV Penetration Vicinities at High Places in the 1st Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.7.19
|
Results of Additional Work in Soundness Inspection of Unit 2 TIP Guide Pipe
|
2013.7.11
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe (4th Day)
|
2013.7.10
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe (3rd Day)
|
2013.7.9
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe (2nd Day)
|
2013.7.8
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe (1st Day)
|
2013.6.19
|
Results of Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
|
2013.6.17
|
Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
|
2013.4.26
|
Removal of the Guide Pipe (Used for PCV Inside Investigation) from Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
|
2013.4.22
|
Dead Mice Found in the Outdoor Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
|
2013.4.22
|
Small Animals (Mice) Found in the Low Voltage Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
|
2013.4.16
|
Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.4.12
|
Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
|
2013.3.26
|
Hole Drilling for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
|
2013.3.19
|
Results of Investigation of the Inside of Unit 2 PCV
|
2013.3.15
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.14
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.13
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.11
|
Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.3.6
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.5
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.1
|
Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation
|
2013.2.27
|
Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
|
2013.2.22
|
Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
|
2013.2.1
|
Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
|
2013.1.28
|
Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
|
2013.1.18
|
Change of Dust Sampling Method at the Openings of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2012.12.11
|
Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2012.12.11
|
Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
|
2012.12.3
|
National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
|
2012.10.19
|
Fire Occurred Near Units 1-2 Ultrahigh Voltage Switchyard (Outdoor) at Fukushima Daiichi Nuclear Power Station
|
2012.10.15
|
Duct Replacement at Unit 2 PCV Gas Control System at Fukushima Daiichi Nuclear Power Station
|
2012.10.3
|
Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
|
2012.9.11
|
(39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
|
2012.9.11
|
(38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
|
2012.9.11
|
(37)Unit 2 Transformer Area
|
2012.9.11
|
(33)Inside the Unit 2 Power Source Room
|
2012.9.11
|
(30)Sea side area of Unit 2
|
2012.9.11
|
(27)Inside the Unit 2 Basement Power Source Room
|
2012.9.11
|
(26)Inside the Unit 2 Alternate Power Source Room
|
2012.9.11
|
(25)Around the Unit 2 Alternate Power Source Room
|
2012.9.11
|
(22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
|
2012.9.11
|
Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
|
2012.9.10
|
Damage of Unit 2 PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
|
2012.9.10
|
Current Condition of Fukushima Daiichi Nuclear Power Station
|
2012.7.5
|
“Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
|
2012.7.3
|
The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
|
2012.6.26
|
Current Condition of Fukushima Daiichi Nuclear Power Station
|
2012.6.14
|
Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
|
2012.6.12
|
Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
|
2012.6.7
|
Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
|
2012.6.7
|
The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
|
2012.6.1
|
【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
|
2012.6.1
|
Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS
|
2012.4.19
|
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
|
2012.4.18
|
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
|
2012.4.17
|
Overveiw of the Robot(Survey Runner)
|
2012.3.27
|
Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
|
2012.3.27
|
【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
|
2012.3.26
|
Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
|
2012.3.23
|
Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
|
2012.3.22
|
Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
|
2012.3.16
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
|
2012.3.15
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
2012.3.14
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
2012.2.28
|
Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
|
2012.2.24
|
TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
|
2012.2.8
|
Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
|
2012.1.29
|
Water leakage in Fukushima Daiichi Nuclear Power Station
|
2012.1.26
|
Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
|
2012.1.21
|
The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
|
2012.1.20
|
Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
|
2012.1.20
|
Current Status of Fukushima Daiichi Nuclear Power Station by photographs
|
2012.1.19
|
Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
|
2012.1.18
|
Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
|
2012.1.16
|
Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
|
2011.12.20
|
Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
|
2011.12.17
|
Current view of Fukushima Daiichi Nuclear Power Plant
|
2011.11.30
|
Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
|
2011.11.7
|
Installation Status of Radioactive Material Removal Facility at the Unit 2's Spent Fuel Pool of Fukushima Daiichi Nuclear Power Station
|
2011.11.2
|
Overview of the blocking operation of the units 1 - 4 openings
|
2011.10.27
|
Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
|
2011.10.21
|
Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
|
2011.10.21
|
Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
|
2011.10.8
|
Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.10.8
|
Status of Fukushima Daiichi Nuclear Power Plants shown in photos
|
2011.10.1
|
Overview of Dust Collector System
|
2011.9.28
|
JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
|
2011.9.24
|
Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.9.17
|
Fukushima Daiichi Nuclear Power Plant Photo Collection
|
2011.9.9
|
Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
|
2011.8.30
|
Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
|
2011.8.5
|
Stack drain pipe of exhaust stack of Units 1 and 2
|
2011.8.2
|
Main Exhaust Stuck of Unit 1/2
|
2011.8.1
|
Debris and gravels with high radiation dose confirmed in July
|
2011.7.29
|
Rest area on the 2nd floor of Unit1/2 Service Building
|
2011.7.16
|
Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
|
2011.7.5
|
Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
|
2011.6.24
|
Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
|
2011.6.23
|
Temporary Indicator Set-up at Unit 2
|
2011.6.23
|
Shielding Wall of Unit 2
|
2011.6.20
|
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
|
2011.6.11
|
Inside of Unit 2 Turbine Building of Fukushima Daiichi
|
2011.6.5
|
Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
|
2011.5.19
|
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
|
2011.5.17
|
Fukushima Daiichi Nuclear Power Station Current status of restoration work
|
2011.4.20
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
|
2011.4.19
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
|
2011.4.12
|
Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
|
2011.4.11
|
Motion pictures of Fukushima Daiichi Nuclear Power Station
|
2011.4.2
|
Near of the Sea Water intake of Unit2
|
2011.4.1
|
Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
|
2011.3.27
|
Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
|
2011.3.16
|
Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station
|