Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Unit2

Upload dates
Title
2024.9.10 Fukushima Daiichi Nuclear Power Station Commencement of the Unit 2 fuel debris trial retrieval
2024.1.31 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
2020.6.11 Completion of the Internal Investigation of the Unit 2 Spent Fuel Pool (SFP) at the Fukushima Daiichi Nuclear Power Station
2020.6.10 Start of Internal Investigation of the Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool (SFP)
2019.2.13 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Investigation Results - Preliminary Report on February 13 -
2018.5.28 Wall Dismantling Work to create an Opening in the West Wall of Unit 2 Reactor Building
2018.4.26 Analysis Results of Unit 2 Primary Containment Vessel Internal Investigation
2018.1.19 Progress of Unit 2 PCV internal investigation (Preliminary report of January 19 investigation)
2017.11.30 Processed image of Unit 2 PCV internal investigation at Fukushima Daiichi NPS
2017.3.30 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (addendum report with image analysis)
2017.2.16 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Investigation results by the self-propelled investigation device)
2017.2.15 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (By the self-propelled investigation device)
2017.2.9 Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Results of deposit removal work)
2017.2.2 Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (examination results of digital images)
2017.1.30 Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel investigation at Fukushima Daiichi Nuclear Power Station
2017.1.26 Pre-investigation results of X-6 penetration for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station
2016.12.26 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.12.24 Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
2016.9.26 Radiation Dose Survey for the Units 1-2 Exhaust Stack at Fukushima Daiichi Nuclear Power Station
2016.7.28 Locating Fuel Debris inside the Unit 2 Reactor Using a Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
2016.5.26 Progress in Fuel Debris Detection Inside the Unit 2 Reactor Using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station (Interim Report)
2016.3.17 The Detection of Fuel Debris inside the Unit 2 Reactor using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
2015.7.10 Fukushima Daiichi Nuclear Power Plant Filling Unit 2 Seawater pipe trench
2014.10.17 Gap-filling Starts: Progress of Water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi Nuclear Power Station
2014.9.30 Results of Research Concerning Exterior Section under S/C (Suppression Chamber) at Unit 2
2014.7.29 Survey of wall of torus room in Unit 2 in Fukushima Daiichi NPS (Report for demonstration survey in R & D project)
2014.1.21 Results of Water Level Measuring inside the Suppression Chamber (S/C) at the Unit 2 in Fukushima Daiichi NPS
2013.12.6 Measuring Radiation Dose at the Lower Part of Unit 1 and 2 Exhaust Stack in Fukushima Daiichi NPS
2013.11.27 Decontamination work on the first floor at Unit 2 reactor building in Fukushima Daiichi NPS
2013.9.18 Fracture Found on Steel Members (Diagonal Bracings) in the Intermediate Section of the Exhaust Stack for Units 1 and 2 at Fukushima Daiichi NPS
2013.8.15 Installation of Permanent Monitoring Instrument of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.8.12 Investigation Results of the Inside of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.7.31 Prior Confirmation Ahead of Inside Investigation of Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.7.24 Results of Survey on the PCV Penetration Vicinities at High Places in the 1st Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.7.19 Results of Additional Work in Soundness Inspection of Unit 2 TIP Guide Pipe
2013.7.11 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (4th Day)
2013.7.10 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (3rd Day)
2013.7.9 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (2nd Day)
2013.7.8 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (1st Day)
2013.6.19 Results of Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
2013.6.17 Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
2013.4.26 Removal of the Guide Pipe (Used for PCV Inside Investigation) from Unit 2 PCV at Fukushima Daiichi Nuclear Power Station
2013.4.22 Dead Mice Found in the Outdoor Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.22 Small Animals (Mice) Found in the Low Voltage Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.16 Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.12 Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.3.26 Hole Drilling for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.3.19 Results of Investigation of the Inside of Unit 2 PCV
2013.3.15 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.14 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.13 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.11 Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.3.6 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.5 Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2013.3.1 Results of Soundness Inspection of Unit 2 TIP Guide Pipe for the Investigation of the Reactor and Thermometer Installation
2013.2.27 Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
2013.2.22 Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.28 Drilling Holes for the Investigation of Unit 2 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.1.18 Change of Dust Sampling Method at the Openings of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.12.11 Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.3 National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.10.19 Fire Occurred Near Units 1-2 Ultrahigh Voltage Switchyard (Outdoor) at Fukushima Daiichi Nuclear Power Station
2012.10.15 Duct Replacement at Unit 2 PCV Gas Control System at Fukushima Daiichi Nuclear Power Station
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.9.11 (39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (37)Unit 2 Transformer Area
2012.9.11 (33)Inside the Unit 2 Power Source Room
2012.9.11 (30)Sea side area of Unit 2
2012.9.11 (27)Inside the Unit 2 Basement Power Source Room
2012.9.11 (26)Inside the Unit 2 Alternate Power Source Room
2012.9.11 (25)Around the Unit 2 Alternate Power Source Room
2012.9.11 (22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
2012.9.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.9.10 Damage of Unit 2 PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.7.5 “Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
2012.7.3 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.14 Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
2012.6.12 Fukushima Daiichi Nuclear Power Station Unit 2 S/C Water Level Measurement by an Infrared Camera
2012.6.7 Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station
2012.6.7 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility (Newly Established) at Fukushima Daiichi Nuclear Power Station
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.6.1 Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS
2012.4.19 Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
2012.4.18 Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
2012.4.17 Overveiw of the Robot(Survey Runner)
2012.3.27 Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
2012.3.27 【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.23 Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
2012.3.22 Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.2.28 Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.8 Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.19 Investigation inside of Primary Containment Vessel, Unit 2, Fukushima Daiichi Nuclear Power Station
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2011.12.20 Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.11.30 Establishment of New Routes for Nitrogen Injection into RPV at Units 1-3 of Fukushima Daiichi Nuclear Power Station
2011.11.7 Installation Status of Radioactive Material Removal Facility at the Unit 2's Spent Fuel Pool of Fukushima Daiichi Nuclear Power Station
2011.11.2 Overview of the blocking operation of the units 1 - 4 openings
2011.10.27 Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
2011.10.21 Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
2011.10.21 Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
2011.10.8 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.1 Overview of Dust Collector System
2011.9.28 JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.8.30 Dust-sampling Opening of Reactor Building of Unit 1and 2, Fukushima Daiichi Nuclear Power Station
2011.8.5 Stack drain pipe of exhaust stack of Units 1 and 2
2011.8.2 Main Exhaust Stuck of Unit 1/2
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.29 Rest area on the 2nd floor of Unit1/2 Service Building
2011.7.16 Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
2011.7.5 Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
2011.6.24 Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
2011.6.23 Temporary Indicator Set-up at Unit 2
2011.6.23 Shielding Wall of Unit 2
2011.6.20 Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.6.11 Inside of Unit 2 Turbine Building of Fukushima Daiichi
2011.6.5 Spraying dust inhibitor over outside walls and roofs of Fukushima Daiichi Nuclear Power Station
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.2 Near of the Sea Water intake of Unit2
2011.4.1 Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
2011.3.27 Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.3.16 Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection