Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Working environment

Upload dates
Title
2016.3.2 Lawson Convenienve Store Opens in the Large Rest Facility at Fukushima Daiichi Nuclear Power Station
2015.1.16 Total Pep Rally for Safety being held at Fukushima Daiichi NPS
2013.11.18 Current Status of Fukushima Daiichi NPS Unit 4 Fuel Removal
2012.10.12 Wearing of Tyvek with the Chest Area Being Transparent
2012.8.23 Videos on Entering/Exiting Fukushima Daiichi Nuclear Power Station and Checking of Dosimeter and Wearing Tyvek (Prototype with the Chest Area Being Transparent) at the Exit of the Main Anti-earthquake Building
2012.4.26 Regarding the treatment of certain areas of the Seismic isolated building of the Fukushima Daiichi Nuclear Power Station as “Uncontrolled area”
2012.2.23 Operational Change of Wearing Protective Equipment at the Site of Fukushima Daiichi Nuclear Power Station
2012.2.22 Installment of Small-sized Incinerator in Fukushima Daiichi Nuclear Power Station
2011.11.4 Influenza vaccination at J village
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS
2011.7.29 Rest area on the 2nd floor of Unit1/2 Service Building
2011.7.29 Rest area for construction of covers of Unit1 Reactor Building(Shimizu Corporation)
2011.7.6 New Hirono Domitory
2011.7.2 Status of establishing rest areas for workers
2011.7.2 Status of preparation for the countermeasures against heat stroke such as Cool Vest
2011.7.1 Fulfillment/reinforcement of medical establishment (Establishment of an emergency medical room)
2011.6.23 Shielding Wall of Unit 2
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.10 Fukushima Daiichi Nuclear Power Station Status of setting rest areas
2011.6.10 Fukushima Daini Nuclear Power Station Status of improvement on working conditions
2011.5.8 Fukushima Daiichi Nuclear Power Station Status of Improved Working Environment Inside of Reactor Building of Unit 1-First Floor of Turbine Building of Unit 1
2011.5.5 The ambient air filtration system (Alara Venti Jumbo)

to TOP


  1. HOME
  2. Photo collection