Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

March 2012

Upload dates
Title
2012.7.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: June 2012)
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.5.9 Progress Status of Fukushima Daini Nuclear Power Station Recovery Plan(Monthly Report: April 2012)
2012.4.20 Fukushima Daiichi Nuclear Power Station Case example of the Improvement of Environment around Monitoring Post
2012.4.17 Overveiw of the Robot(Survey Runner)
2012.4.16 Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.3.30 Sampling of fish and shellfish on the ocean area within 20km of Fukushima Daiichi Nuclear Power Station
2012.3.29 Cause and countermeasures against a fire near No.3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 on March 21, 2012
2012.3.28 Countermeasures against Water Leakage from Condensed Water Transportation Line of Water Desalinations (Reverse Osmosis Membrane)
2012.3.27 Dose measurement work inside of the primary containment vessels of unit 2 of Fukushima Daiichi NPS
2012.3.27 【Movie】 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Result of the second investigation inside of Primary Containment Vessels, Unit 2, Fukushima Daiichi Nuclear Power Plant
2012.3.26 Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
2012.3.26 Emergency response training at Fukushima Daiichi Nuclear Power Plant
2012.3.26 Shutdown Operation for Regular Inspection of Unit 6 of Kashiwazaki-Kariwa Nuclear Power Station
2012.3.24 Fukushima Daiichi Nuclear Power Station Scenes of disaster drill
2012.3.23 Site investigation result for installing alternative thermometer for Fukushima Daiichi NPS Unit 2
2012.3.22 Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
2012.3.22 Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2012.3.21 A Fire near No. 3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6
2012.3.16 The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.13 Ocean soil covering work in front of the intake channel of Fukushima Daiichi Nuclear Power Station Situation of the field test construction and covering condition
2012.3.12 Situation of investigation on water leakage from around the welded part of filter valve of 2nd Cesium adsorption apparatus (Sarry) B system (Continued report)
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection