Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
Upload dateMar 26, 2012
Photo
![](/library/120326_4/120326_10_t.jpg)
Status of the water leakage (1)
Photo taken on March 26, 2012 by TEPCO
![](/library/120326_4/120326_11_t.jpg)
Status of the water leakage (2)
Photo taken on March 26, 2012 by TEPCO
![](/library/120326_4/120326_12_t.jpg)
Photo taken on March 26, 2012 by TEPCO
![](/library/120326_4/120326_13_t.jpg)
Photo taken on March 26, 2012 by TEPCO
![](/library/120326_4/120326_14_t.jpg)
![](/library/120326_4/120326_15_t.jpg)
Photo taken on March 26, 2012 by TEPCO
Category
■Search by status/measures
Mitigation of radioactive materials / Others
■Pickup
Troubles (in water processing system)