Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Others

Upload dates
Title
2024.12.17 Prime Minister, Shigeru Ishiba’s Visit to Fukushima Daiichi Nuclear Power Station
2024.12.16 Chairman of Nuclear Reform Monitoring Committee, Dr. Dale Klein, visited the Kashiwazaki-Kariwa Nuclear Power Station and observed the general emergency exercise
2024.12.13 The International Atomic Energy Agency (IAEA) Task Force visited the Fukushima Daiichi Nuclear Power Station
2024.11.21 Visit to the Kashiwazaki-Kariwa Nuclear Power Station by KEIDANREN
2024.11.21 Visit to the Kashiwazaki-Kariwa Nuclear Power Station by His Excellency Mr. Rahm Emanuel, United States of America Ambassador to Japan
2024.11.19 Minister of Reconstruction Tadahiko Ito’s visit to Fukushima Daiichi Nuclear Power Station
2024.11.18 German Ambassador to Japan Petra Sigmund visited Fukushima Daiichi Nuclear Power Station
2024.11.12 Fukushima Daiichi Nuclear Power Station Unit 2 Fuel Debris Trial Retrieval Completion of Transportation of the Sampled Fuel Debris to Off-site Analysis Facilities
2024.11.7 Fukushima Daiichi Nuclear Power Station Completion of fuel debris trial retrieval from Unit 2
2024.10.30 Fukushima Daiichi Nuclear Power Station Recommencement of the Unit 2 Fuel Debris Trial Retrieval (Completion of Fuel Debris Grasping Work)
2024.10.30 Governor of Fukushima Prefecture, Masao Uchibori's Visit to Fukushima Daiichi Nuclear Power Station
2024.10.10 Minister of Economy, Trade and Industry, Yoji Muto’s Visit to Fukushima Daiichi Nuclear Power Station
2024.10.1 Appointment of Tomoaki Kobayakawa as President of the World Association of Nuclear Operators (WANO)
2024.9.30 Ambassador of the Republic of Korea visited Fukushima Daiichi Nuclear Power Station
2024.9.26 Completion of spent fuel transportation to the Recyclable-Fuel Storage Center of Recyclable-Fuel Storage Company (RFS)
2024.9.20 The 22nd Meeting of the “Expert Nuclear Security Assessment Committee” at Fukushima Daiichi Nuclear Power Station
2024.9.10 Fukushima Daiichi Nuclear Power Station Commencement of the Unit 2 fuel debris trial retrieval
2024.8.20 Visit to the Kashiwazaki-Kariwa Nuclear Power Station by Her Excellency Ms. Julia Longbottom, British Ambassador to Japan
2024.8.8 Received the fifth assessment report from the Expert Nuclear Security Assessment Committee
2024.6.14 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of France to Japan, H. E. Mr. Philippe Setton
2024.6.13 Measures pertaining to the fish inside the port of Fukushima Daiichi Nuclear Power Station (Completion of the construction to re-cover the seafloor of the Units 1-4 intake open channel)
2024.4.25 Site Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA Task Force to conduct a safety review mission regarding the discharge of ALPS treated water
2024.4.15 Visit to the Fukushima Daiichi Nuclear Power Station by the representatives of World Association of Nuclear Operators (WANO)
2024.4.11 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of Canada to Japan, H. E. Mr. Ian G. McKay
2024.3.18 Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Non-Submerged Area) Status Inside the Pedestal
2024.3.13 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Director General Rafael Mariano Grossi
2024.2.19 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassadors of the IAEA board member states to Vienna
2024.1.31 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
2024.1.18 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal
2024.1.10 Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status
2023.11.21 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of Czech Republic to Japan, H.E. Mr. Martin Klucar
2023.11.17 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of Ireland to Japan, H.E. Mr. Damien Cole
2023.11.9 Visit to the Fukushima Daiichi Nuclear Power Station by the International Commission on Radiological Protection (ICRP)
2023.11.2 Fukushima Daiichi Nuclear Power Station The third discharge of ALPS treated water (Second Stage)
2023.10.31 Fukushima Daiichi Nuclear Power Station The third discharge of ALPS treated water (First Stage)
2023.10.25 Site visit to the Fukushima Daiichi Nuclear Power Station by the IAEA Task Force to conduct a review mission regarding the discharge of ALPS treated water
2023.10.20 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Deputy Director General Lydie Evrard
2023.10.12 International Atomic Energy Agency (IAEA) attended the sampling for the second discharge of ALPS treated water (Second Stage)
2023.10.12 International Atomic Energy Agency (IAEA) attended the sampling for the second discharge of ALPS treated water (First Stage)
2023.10.5 Fukushima Daiichi Nuclear Power Station the second discharge of ALPS treated water (Second Stage)
2023.10.3 Fukushima Daiichi Nuclear Power Station the second discharge of ALPS treated water (First Stage)
2023.8.24 Fukushima Daiichi Nuclear Power Station the Initial Discharge of ALPS Treated Water (Second Stage)
2023.8.23 International Atomic Energy Agency (IAEA) attended the first sampling for the initial discharge of ALPS treated water (First Stage)
2023.8.22 Fukushima Daiichi Nuclear Power Station Commencement of preparations for the initial discharge of ALPS treated water (First Stage)
2023.8.21 Visit to the Fukushima Daiichi Nuclear Power Station by the Prime Minister Fumio Kishida
2023.7.5 Visit to the Fukushima Daiichi Nuclear Power Station by IAEA Director General Rafael Mariano Grossi
2023.6.26 Work in removal of the shield arrival tube and installation of the discharge outlet caisson upper lid
2023.6.19 Visit to the Fukushima Daiichi Nuclear Power Station by the Delegation of Taiwanese Nuclear Experts
2023.6.13 Visit to the Fukushima Daiichi Nuclear Power Station by the President of the Republic of Palau, H.E. Mr. Surangel S. WHIPPS, Jr.
2023.6.13 Site visit to the Fukushima Daiichi Nuclear Power Station by IAEA officials to observe pre-service inspections of the facilities related to the discharge of ALPS treated water into the sea
2023.6.9 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassador of the Dominican Republic to Japan, H. E. Mr. Robert TAKATA
2023.6.6 Down-stream storage after completion of water filling
2023.6.2 Site visit to the Fukushima Daiichi Nuclear Power Station by the IAEA Task Force to conduct a comprehensive review mission regarding the planned discharge of ALPS treated water
2023.5.30 Visit to the Fukushima Daiichi Nuclear Power Station by the Ambassadors of Latin American
2023.5.26 Visit to the Fukushima Daiichi Nuclear Power Station by the Delegation of Republic of Korea Experts
2023.5.15 The delegation from the Directorate-General Energy (ENER), European Commission, visited the Fukushima Daiichi Nuclear Power Station
2023.5.9 The delegation from the high committee for transparency and information on nuclear safety (HCTISN) in France's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.27 The delegation from French Nuclear Safety Authority's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.26 Inside the discharge tunnel at the Fukushima Daiichi Nuclear Power Station
2023.4.26 The British Minister for Natural Environment and Land Use, Trudy Harrison's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.18 The Federal Minister for the Environment, Nature Conservation, Nuclear Safety, and Consumer Protection of Germany, Ms. Steffi Lemke's visit to the Fukushima Daiichi Nuclear Power Station
2023.4.4 The Unit 1 Primary Containment Vessel (PCV) Internal Investigation (Using ROV-A2, Day 3, Part 2)
2023.3.17 International Special Advisors of NDF (Nuclear Damage Compensation and Decommissioning Facilitation Corporation)'s visit to the Fukushima Daiichi Nuclear Power Station
2023.3.13 Minister for Reconstruction Watanabe Hiromichi's visit to the Fukushima Daiichi Nuclear Power Station
2023.3.8 Komeito’s Chief Representative Natsuo Yamaguchi's visit to the Fukushima Daiichi Nuclear Power Station
2023.3.2 Pacific Islands Forum (PIF) secretariat and PIF experts' visit to the Fukushima Daiichi Nuclear Power Station
2023.2.14 Back filling of discharge outlet caisson Fukushima Daiichi Nuclear Power Station (Follow-up report)
2023.1.20 Visit of the IAEA Delegation for the Regulatory Review on the Handling of ALPS Treated Water at the Fukushima Daiichi Nuclear Power Station
2022.12.20 The OECD/NEA and nuclear regulatory authorities from various countries visited Fukushima Daiichi Nuclear Power Station
2022.12.8 Back filling of discharge outlet caisson Fukushima Daiichi Nuclear Power Station
2022.11.18 Installation of discharge outlet caisson Fukushima Daiichi Nuclear Power Station
2022.11.16 Inspection at the Fukushima Daiichi Nuclear Power Station by the IAEA officials for the Second Review of the Safety Aspects of ALPS Treated Water
2022.11.11 As a part of joint project :Collecting samples of seawater, etc. by IAEA and other authorities
2022.11.7 UK nuclear industry representatives' visit to the Fukushima Daiichi Nuclear Power Station
2022.10.19 The third observation of the sampling of ALPS treated water by IAEA review team at the Fukushima Daiichi Nuclear Power Station
2022.9.28 Minister for Reconstruction Kenya Akiba's visit to the Fukushima Daiichi Nuclear Power Station
2022.9.13 Fukushima Daiichi Nuclear Power Station Progress in the marine organisms rearing test (Start of Rearing test preparations)
2022.8.22 METI Minister Yasutoshi Nishimura’s visit to the Fukushima Daiichi Nuclear Power Station
2022.8.4 Commencement of Installation on ALPS Treated Water Dilution/Discharge Facility and Related Facilities at the Fukushima Daiichi Nuclear Power Station
2022.7.29 Irish Ambassador to Japan, H. E. Mr. Paul Kavanagh’s visit to the Fukushima Daiichi Nuclear Power Station
2022.7.21 Fukushima Daiichi Nuclear Power Station Progress in the marine organisms rearing test (Start of rearing practice in the mockup tanks)
2022.7.19 Chief Cabinet Secretary, Hirokazu Matsuno’s visit to the Fukushima Daiichi Nuclear Power Station
2022.5.23 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 19) at the Fukushima Daiichi Nuclear Power Station
2022.5.19 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 17 and 18) at the Fukushima Daiichi Nuclear Power Station
2022.5.19 IAEA Director General Grossi’s visit to the Fukushima Daiichi Nuclear Power Station
2022.5.6 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 3)
2022.4.25 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 2)
2022.4.25 Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station (Part 1)
2022.4.13 Commencement of installation of large cover in preparation for the removal of spent fuel from Fukushima Daiichi Nuclear Power Station Unit 1 (Anchor drilling)
2022.3.30 Observation by IAEA review team of the sampling of ALPS treated water at the TEPCO Fukushima Daiichi Nuclear Power Station
2022.3.28 Taiwanese Government officials’ visit to the Fukushima Daiichi Nuclear Power Station
2022.3.24 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between March 14~16) at the Fukushima Daiichi Nuclear Power Station
2022.3.17 Commencement of training on marine organism rearing test Fukushima Daiichi Nuclear Power Station
2022.3.14 Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (Preliminary report) at the Fukushima Daiichi Nuclear Power Station
2022.2.16 IAEA review team conducts field inspection during safety review of ALPS treated water (February 15) at the Fukushima Daiichi Nuclear Power Station
2022.2.10 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (As of February 10) at the Fukushima Daiichi Nuclear Power Station
2022.2.9 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (As of February 9) at the Fukushima Daiichi Nuclear Power Station
2022.2.8 Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (Preliminary report) at the Fukushima Daiichi Nuclear Power Station
2021.12.20 Boring survey using SEP vessel (self-elevating platform) at the Fukushima Daiichi Nuclear Power Station (Part 2)
2021.12.15 Marine boring survey using SEP vessel (self-elevating platform) at the Fukushima Daiichi Nuclear Power Station
2021.12.14 SEP vessel (self-elevating platform) moving for the geological survey at the Fukushima Daiichi Nuclear Power Station
2021.12.3 The Nuclear Regulation Authority Chairman Fuketa’s visit to the Fukushima Daiichi Nuclear Power Station (December 2, 2021)
2021.11.30 Governor of Fukushima prefecture, Uchibori Masao’s visit to the Fukushima Daiichi Nuclear Power Station (November 30, 2021)
2021.11.19 H.E. Ms. Julia Margaret Longbottom, British Ambassador to Japan’s visit to the Fukushima Daiichi Nuclear Power Station
2021.11.17 Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA review mission to assess the safety of ALPS treated water
2021.10.17 Prime Minister, Fumio Kishida’s visit to the Fukushima Daiichi Nuclear Power Station (October 17, 2021)
2021.10.17 State Minister of Economy, Trade and Industry, Masahiro Ishii’s visit to the Fukushima Daiichi Nuclear Power Station (October 16, 2021)
2021.10.11 Minister of Economy, Trade and Industry, Koichi Hagiuda's visit to the Fukushima Daiichi Nuclear Power Station (October 10, 2021)
2021.9.9 Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA review mission to assess the safety of ALPS treated water
2021.3.23 President Kobayakawa's visit to Fukushima Daiichi Nuclear Power Station and speech to staff
2020.12.25 Governor of Miyagi prefecture, Yoshihiro Murai visits the Fukushima Daiichi Nuclear Power Station(December 24, 2020)
2020.11.6 Governor of Fukushima Pref., Mr. Uchibori, visits the Fukushima Daiichi Nuclear Power Station (November 6, 2020)
2020.10.19 Minister of Economic Revitalization, Yasutoshi Nishimura’s visit to the Fukushima Daiichi Nuclear Power Station (October 18, 2020)
2020.10.19 Minister of Health, Labour and Welfare, Norihisa Tamura's, visit to the Fukushima Daiichi Nuclear Power Station (October 18, 2020)
2020.9.26 Prime Minister Yoshihide Suga’s visit to the Fukushima Daiichi Nuclear Power Station (September 26, 2020)
2019.10.3 Minister of the Environment Shinjiro Koizumi visited the Fukushima Daiichi Nuclear Power Station (on October 2, 2019)
2019.4.14 Prime Minister Shinzo Abe visited the Fukushima Daiichi Nuclear Power Station (April 14, 2019)
2018.11.7 Site Inspection for IAEA Decommissioning Review Mission at Fukushima Daiichi NPS (November 7)
2018.11.1 The governor of Fukushima Pref. visit to the Fukushima Daiichi Nuclear Power Station
2018.3.16 US Ambassador to Japan William F. Hagerty’s visit to the Fukushima Daiichi Nuclear Power Station
2017.11.15 Governor of Fukushima Prefecture visited Fukushima Daiichi (November 15, 2017)
2017.6.5 U.S. Secretary of Energy Rick Perry visiting Fukushima Daiichi Nuclear Power Station
2017.3.24 His Excellency Ambassador Paul Madden, British Embassy Ambassador to Japan, visited Fukushima Daiichi Nuclear Power Station (March 1, 2017)
2017.2.27 Videos to show the interior of the Unit 5 Primary Containment Vessel (PCV) (Reference videos for Unit 1 PCV investigation)
2016.12.20 Transportation of the supporting part of a new roof for the Unit 3 fuel removal at Fukushima Daiichi Nuclear Power Station
2016.11.21 Freezing condition visually confirmed for the Landside Impermeable Wall (ice wall)
2016.9.30 A New Administration Building at Fukushima Daiichi Nuclear Power Station
2016.8.10 Hiroshige Seko, Minister of Economy, Trade and Industry, Visits the Fukushima Daiichi Nuclear Power Station
2016.5.19 Dr. Barbara Hendricks, Federal Minister of Environment in Germany Visits Fukushima Daiichi Nuclear Power Station
2016.5.17 Relocation of the Control Room for Water Treatment Facilities into the Main Anti-Earthquake Building
2016.3.29 The Nuclear Reform Monitoring Committee Visits Fukushima Daiichi Nuclear Power Station
2016.3.28 Completion of Drainage K Reconfigulation
2016.3.17 The Detection of Fuel Debris inside the Unit 2 Reactor using A Muon Measurement Technology at Fukushima Daiichi Nuclear Power Station
2016.3.11 Silent prayer and Executive Speeches at Main Anti-Earthquake Building at Fukushima Daiichi Nuclear Power Station
2016.3.2 Lawson Convenienve Store Opens in the Large Rest Facility at Fukushima Daiichi Nuclear Power Station
2016.1.20 Member of KEIDANREN (Japan Business Federation) visits Kashiwazaki-Kariwa Nuclear Power Station on Jan 15, 2016
2015.12.25 Performance Checks for the Dry Ice Blast Decontamination Equipent for High Places
2015.11.27 Unit 3 PCV Equipment Hatch Investigation Using A Small Investigation Device (Robot)
2015.11.24 Progress Status of Miscellaneous Solid Waste Incineration Facility Installation
2015.11.18 Training to Remove Obstacled Steel Frames Using the Mock-up Facility for Unit 1 Reactor Building of the Fukushima Daiichi Nuclear Power Station
2015.11.12 Progress of the Facing Work at the Fukushima Daiichi Nuclear Power Station
2015.10.22 Construction Work on Drainage K (temporary to permanent solution)
2015.10.13 Motoo Hayashi, Minister of Economy, Trade and Industry, Visits the Fukushima Daiichi Nuclear Power Station
2015.9.25 Completion of Placing Steel Pipe Sheet-Piles for Seaside Impermeable Wall Closure
2015.9.24 Cooperation Agreement for Information Exchange with the CEA
2015.8.8 The accident of a worker clearing construction vehicles at Fukushima Daiichi Nuclear Power Station
2015.7.28 Removing roof panels of Unit 1 reactor building cover at Fukushima Daiichi Nuclear Power Station (the 1st panel)
2015.7.13 IAEA Operational Safety Evaluation Review for Kashiwazaki-Kariwa NPS Unit 6 and 7 (Closing Session)
2015.7.10 Fukushima Daiichi Nuclear Power Plant Filling Unit 2 Seawater pipe trench
2015.6.30 IAEA Operational Safety Evaluation review for Kashiwazaki-Kariwa NPS Unit 6 and 7.
2015.6.22 Water Leakage from the Pipe of Rainwater Treatment Facility (Desalination Reverse Osmosis Membrane System) at Fukushima Daiichi Nuclear Power Station
2015.6.3 (Photo added on June 9, 2015) Chairman Tony Price and Managing Director Paul Foster from Sellafield Ltd visited Fukushima Daiichi Nuclear Power Station (June 3, 2015)
2015.6.1 Start of operation of the large rest house at Fukushima Daiichi NPS
2015.5.28 The Chairman of Policy Research Council of Liberal Democratic Party, Tomomi Inada Visited at Fukushima Daiichi Nulcear Power Station (May 27, 2015)
2015.5.22 The Balloon Sliding Off the 3rd Floor Equipment Hatch inside Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
2015.5.15 "Fukushima Supporting Companies Network" Annual General Meeting in FY2015
2015.5.7 Yoichi Miyazawa, Minister of Economy, Trade and Industry, Visiting Fukushima Daiichi Nuclear Power Station
2015.4.30 Start of coolant functioning test of the impermeable wall on the landside (Ice wall) at Fukushima Daiichi Nuclear Power Station
2015.4.21 Stop of Water Transfer Pump from K Drainage Channel to C Drainage Channel in Fukushima Daiichi Nuclear Power Station
2015.4.21 IAEA Experts Sent to Fukushima Daiichi Nuclear Power Station for Inspection
2015.4.14 Members of Japan Chamber of Commerce and Industry (JCCI)@ Kashiwazaki-Kariwa NPS
2015.3.30 Smoke from a Roadside Ditch on the Premises of Fukushima Daiichi Nuclear Power Station
2015.3.24 Fire on the bank of the road on the west side of Units 5 and 6 in the premises of Fukushima-Daiichi Nuclear Power Station
2015.3.18 Nuclear emergency response drill at Fukushima Daiichi NPS
2015.3.18 Nuclear emergency response drill at Fukushima Daiichi NPS and head office
2015.3.11 Moment of Silence and Speech at Main Anti-Earthquake Building at Fukushima Daiichi NPS
2015.2.22 [Technical Committee on Nuclear Power Safety Management in Niigata Prefecture] Explanation on the 4th floor investigation of the Unit 1 reactor building at Fukushima Daiichi NPS
2015.2.20 Operational Start of Second Mobile-type Strontium Removal Equipment
2015.2.20 Refrigerator for Landside Impermeable Wall
2015.2.17 Site Inspection for IAEA Decommissioning Review Mission at Fukushima Daiichi NPS
2015.2.12 Operational start of Mobile Strontium Removal Equipment (Unit B)
2015.2.6 Application of Corrective Actions on the Safety Inspection
2015.1.29 KEIZAI DOYUKAI(Japan association of Corporate Executives), Inspection of Kasiwazaki Kariwa Nuclear Power Station (January 29, 2015)
2015.1.28 Restart operation at Fukusima Daini Nuclear Power Station
2015.1.27 Safety Lecture held for field workers at Fukushima Daiichi Nuclear Power Station
2015.1.26 Implementing Corrective Actions after the Safety Inspection at Fukushima Daiichi Nuclear Power Station
2015.1.22 Safety Inspection at Nuclear Power Stations
2015.1.22 Confirmation on the site situation before conducting the overall safety inspection at Fukushima Daiichi Nuclear Power Station
2015.1.20 Regarding the fatal accident at Fukushima Daini NPS involving a cooperative company employee working in Units 1 and 2 waste treatment facility (controlled area)
2015.1.20 A cooperative worker fell off from the top plate of a rainwater receiving tank.
2015.1.16 Total Pep Rally for Safety being held at Fukushima Daiichi NPS
2015.1.14 French Ambassador Thierry DANA visited Fkushima Daiichi NPS (January 13, 2015)
2014.12.19 State Minister of Economy, Trade and Industry Yosuke Takagi at Fukushima Daiichi Nuclear Power Station
2014.11.18 Inaugural Meeting of "Fukushima Supporting Companies Network"
2014.11.11 Nuclear Emergency Drill at Kashiwazaki-Kariwa Nuclear Power Station with Niigata Prefecture
2014.10.17 Gap-filling Starts: Progress of Water cutoff operation on the connection between the seawater piping trench and building of Unit 2 and 3 of Fukushima Daiichi Nuclear Power Station
2014.9.30 Cooperation Agreement with Sellafield Ltd
2014.9.8 Minister of Economy,Trade and Industry Yuko Obuchi at Fukushima Daiichi Nuclear Power Station
2014.9.1 Field survey using underwater camera after the console of the fuel handling machine dropped(August 30, 2014)
2014.9.1 The Console of the Fuel Handling Machine dropped during debris removal operation of Unit 3 Spent Fuel Pool Fukushima Daiichi NPS(August 29, 2014)
2014.8.22 Performance verification test of the Advanced Multi-nuclide Removal Equipment
2014.7.24 Water management around the Tanks at Fukushima Daiichi NPS
2014.7.24 Start of Operation of a New Office Building at Fukusima Daiichi NPS
2014.7.24 Patrol by "Area keepers"
2014.6.13 The Honorable Hans Carl von Werthern, German ambassador to Japan visited Fukushima Daiichi Nuclear Power Station (on June 2, 2014)
2014.6.12 Carrying the factory made welded tanks into Fukushima Daiichi Nuclear Power Station
2014.5.21 Verification Test of the Ice Wall
2014.5.14 The U.S. Ambassador, Caroline Kennedy visited Fukushima Daiichi Nuclear Power Station (May 14, 2014)
2014.5.2 Cooperation Statement with Sellafield Ltd
2014.4.15 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 18, 2012
2014.4.14 Leakage from Plastic Tank on Side of H5 Tank Area of Fukushima Daiichi NPS
2014.4.4 Groundwater Bypass System in Fukushima Daiichi NPS
2014.3.28 Worker injured during the drilling operation at Fukushima Daiichi Nuclear Power Station
2014.3.11 Interview to the worker at Unit 4 building cover construction site at Fukushima Daiichi NPS
2014.3.11 Moment of Silence and Speech at Main Anti-Earthquake Building of Fukushima Daiichi NPS
2014.3.11 Dr. Dale Klein's visit to Fukushima Daiichi NPS
2014.2.28 Measures for Leakage from the Top Plate of the Upper Part of H6 Area Tank
2014.2.20 Water Overflow from the flange of the top panel on the upper part of H6 tank area
2014.2.18 Measures for Contaminated Water in the Seaside Trenches of Turbine Buildings at Fukushima Daiichi
2014.2.12 Fukushima Daiichi NPS: Cracks in Foundation Concrete in H-4 and H-4 East Tank Areas
2014.2.7 Verification test of decontamination device for lower place under a national project of "Development of Remote Decontamination Technology in the Reactor Building" (Suction/blast device)
2014.2.5 Assessment for Strontium-90 Analysis in Fukushima Daiichi Nuclear Power Station
2014.1.30 Progress in debris removal at sea side as an emergent safety measure in Fukushima Daiichi NPS
2014.1.21 Water leakage around the main steam isolation valve room at the 1st floor of reactor building at Unit 3
2014.1.18 Water Leakage at First Floor of Near the Main Steam Isolation Valve at Unit 3 Fukushima Daiichi NPS
2014.1.14 Lowering in water levels inside the dike in G4 Tank area of Fukushima Daiichi Nuclear Power Station
2013.12.24 Leak from the dikes at H5 tank area and G6 north tank area
2013.12.22 Leakage from the H5 tank area dike at Fukushima Daiichi NPS
2013.12.18 Results of the Seventh Soundness Inspection for Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.12.13 Electric valve installed to the condensate water makeup system in Kashiwazaki-Kariwa Unit 7 as a measure following the Fukushima accident
2013.12.11 Progress Status of Emergency Safety Measures at Fukushima Daiichi NPS
2013.12.2 Extraction of Fuel from Unit 4 Spent Fuel Pool and Transfer to Common Pool
2013.11.27 IAEA visits the Fukushima Daiichi NPS
2013.11.20 Defect with Emergent Nitrogen Gas Separation Apparatus in Fukushima Daiichi NPS
2013.11.15 Water Leak from the Flange Part of the G6 South Area Tank (Steel Cylindrical Tank)
2013.11.13 Site Visit by Mr. Lake Barrett, Outside Expert to the Contaminated Water and Tank Countermeasures Headquarters, to Fukushima Daiichi NPS
2013.11.13 Measures of rainwater implemented at inside of dike and drainage channel in Fukushima Daiichi Nuclear Power Station
2013.11.11 Leakage of Water Accumulated inside a Dike and High Dose Rate Locations, Found in Tank Areas at Fukushima Daiichi NPS
2013.11.9 Leakage of accumulated water inside the dike of H6 area at Fukushima Daiichi Nuclear Power Station
2013.11.1 U.S. Energy Secretary Ernest Moniz on an inspection
2013.11.1 The Same Type On-premise Transportation Container used for Fuel Debris from the Spent Fuel Pool at Unit 4 in Fukushima Daiichi NPS
2013.10.30 Fuel Discharge from Reactor 4 Spent Fuel Pool in Fukushima Daiichi NPS
2013.10.30 Additional Measures against Contamination Expansion at H4 area in Fukushima Daiichi NPS
2013.10.25 Precautionary Measures of Accumulated Water inside the Dike against Typhoon No.27 (Francisco) at Fukushima Daiichi NPS
2013.10.25 Countermeasure against Rainwater in Tank Area at Fukushima Daiichi NPS
2013.10.25 Collapse on south slope at Okuma street due to influence of typhoon No.26
2013.10.23 Fire near General Waste Incinerator in Fukushima Daiichi NPS -Cause and Countermeasure-
2013.10.22 Carry-in and Installation of Filter Vent at Kashiwazaki-Kariwa NPS
2013.10.16 Debris Removal Work on the Roof Top of the Unit 3 Reactor Building at Fukushima Daiichi NPS Completion of Large Debris Removal and Implementation of Lowering Radiation Dose
2013.10.9 Leakage inside Temporary Warehouse for Desalination System (Reverse Osmosis Membrane) RO-3
2013.10.7 Seismic Safety Evaluation of Fukushima Daiichi NPS Units 1 and 2 Exhaust Stack Having Damaged Components
2013.10.7 The Suspension of the Common On-Site Power Supply (3B) Facilities at Fukushima Daiichi NPS
2013.10.3 Leakage from B Area South Tank
2013.10.1 Overflow of Water from the Notch Tank for H6 Area Located on the East of H5 Area at Fukushima Daiichi NPS
2013.9.24 Regarding the Incident Where a Jib Mast at the Tip of a Remote-control Large Crane Was Bent Down [Cause and Countermeasures]
2013.9.19 Site Visit by Prime Minister Sinzo Abe
2013.9.18 Fracture Found on Steel Members (Diagonal Bracings) in the Intermediate Section of the Exhaust Stack for Units 1 and 2 at Fukushima Daiichi NPS
2013.9.17 Sandbags at the Drainage Channel B Being Swept Away Due to Rainfall from the Approaching Typhoon at Fukushima Daiichi NPS
2013.9.17 Accumulated Water Inside the Dike in Each Tank Area at Fukushima Daiichi Nuclear Power Station
2013.9.17 Fukushima Daiichi Nuclear Power Station Video Tour
2013.9.13 Site visit by Mr.Lake Barrett at Fukushima Daiichi Nuclear Power Station
2013.9.13 Water Leakage from the Washing Tank of RO Apparatus for Unit 5 and 6 at Fukushima Daiichi NPS
2013.9.12 H4 tank area being patrolled at Fukushima Daiichi Nuclear Power Station (Photos)
2013.9.10 Unit 3 Reactor Building, at Fukushima Daiichi Nuclear Power Station, The Bent-Down Tip Jib Mast and Main Mast of a Remote Control Large-Scale Crane
2013.9.6 Condition of sandbags installed at inside of the dike around the H4 area at Fukushima Daiichi Nuclear Power Station
2013.9.5 Radiation Sealing Test in H3 area Tanks
2013.9.4 H4 tank area being patrolled at Fukushima Daiichi Nuclear Power Station
2013.9.3 G3 Area Tank at Fukushima Daiichi Nuclear Power Station
2013.9.2 High Radiation Locations Found at the H3 Area Tank
2013.9.2 Results of Tank Patrol at Fukushima Daiichi Nuclear Power Station
2013.8.26 Mr. Toshimitsu Motegi, Minister of Economy, Trade and Industry, visiting Fukushima Daiichi Nuclear Power Station
2013.8.26 Dose Measurement Results of the H4 Area Circumference (Drain Valve) and the Drainage Channel Slope Near the H4 Area (Mountain Side)
2013.8.24 Current progress in the investigation of the H4 Area water leakage
2013.8.21 Status of Handling of Water Leak at a Tank in the H4 Area in Fukushima Daiichi Nuclear Power Station
2013.8.19 Condition of the bank protection at Fukushima Daiichi Nuclear Power Station (video)
2013.8.19 Water Leak at a Tank in the H4 Area in Fukushima Daiichi Nuclear Power Station
2013.8.12 Alarm Went off at the Dust Monitor Installed in front of the Main Anti-earthquake Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM8:00~,Jul 26, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM7時00分~,Jul 25, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (PM12:00~,Jul 24, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.8.6 (AM9:00~,Jul 23, 2013)Steam Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.7.26 Oil-like Substance Seen Floating in the Vicinity of Fukushima Daini Nuclear Power Station Unit 2 Water Intake Screening System
2013.7.25 Completion of Fuel Rack Inspection and Confirmation/Collection of Foreign Materials at Unit 6 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2013.7.24 Results of Survey on the PCV Penetration Vicinities at High Places in the 1st Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.7.24 Ambient Dose Measurement Around the Shield Plug on the Fifth Floor of Unit 3 at Fukushima Daiichi Nuclear Power Station
2013.7.23 Oil Leakage at Unit 6 Emergency Diesel Generator (B) in Fukushima Daiichi Nuclear Power Station
2013.7.22 Oil Leakage at the Desalination System (RO-3) in Fukushima Daiichi Nuclear Power Station
2013.7.19 Results of Additional Work in Soundness Inspection of Unit 2 TIP Guide Pipe
2013.7.19 Condition of Radioactive Density of the Groundwater and the Seawater at the East Side of Turbine Buildings
2013.7.18 Steam-like Gas Found Near the Central Part of the Fifth Floor (Equipment Storage Pool Side) of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station (am8:35-am8:37 on July 18)
2013.7.12 Current status of Fukushima Daini Nuclear Power Station (July 2013)
2013.7.12 Measures to Prevent Fish From Moving to Outside the Port Which were Already Implemented at Fukushima Daiichi Nuclear Power Station (As of July 12, 2013)
2013.7.11 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (4th Day)
2013.7.10 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (3rd Day)
2013.7.9 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (2nd Day)
2013.7.8 Investigation of Radioactive Materials
2013.7.8 Results of Soundness Inspection of Unit 2 TIP Guide Pipe (1st Day)
2013.7.4 Radioactive Material sampled at Naraha-machi (Zone in Preparation for Having the Evacuation Order Lifted) on July 2
2013.7.3 Failure on a Charger Panel of the Air-cooled Gas Turbine Generator Vehicle (No.1) Due to Entrance of a Small Animal
2013.7.3 Inspection Results of the Batch Treatment Tank 2A of Multi-nuclide Removal Equipment (ALPS) in Fukushima Daiichi Nuclear Power Station
2013.7.2 Investigation of Radioactive Material
2013.7.2 Fire Found Near the Common Incineration Facility at Fukushima Daiichi Nuclear Power Station
2013.6.24 Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2013.6.17 A water droplet found at the batch treatment tank 2A of multi-nuclide removal equipment (ALPS) in Fukushima Daiichi Nuclear Power Station
2013.6.12 Results and Assessment of Measurements on Groundwater Bypass Temporary Storage Tank Water
2013.6.7 Overview of the Disaster Situation and the Restoration Condition at Fukushima Daini Nuclear Power Station
2013.6.5 Overview of the underground bypass facility
2013.6.5 About the Inappropriate Wearing of APDs that Are to Be Worn to Check Dose Levels when Wearing a Shielding Suit
2013.6.5 Water Leakage from the Flange of G6 Area Tank (Cylindrical Steel Tank)
2013.5.30 Restoration Completion of Facilities for Maintaining Cold Shutdown at Fukushima Daini Nuclear Power Station
2013.5.29 A Foreign Material Found and Collected in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.5.29 Completion of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.5.29 Oil Leakage from Concrete Pumping Vehicle at Parking Outside of Main Gate of Fukushima Daiichi Nuclear Power Station
2013.5.27 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station Renewal of the Protection Installed on the Spent Fuel Pool and the Skimmer Surge Tank Hatch
2013.5.24 A Foreign Material Found in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.5.20 Oil Leakage from Unmanned Heavy Equipment Used for Debris Removal in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.5.9 Dismantlement of Unit 1 Reactor Building Cover for Fuel Removal at Fukushima Daiichi Nuclear Power Station
2013.4.22 Dead Mice Found in the Outdoor Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.22 Small Animals (Mice) Found in the Low Voltage Transformer Box for Unit 2 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.19 Condition of the Skimmer Surge Tank Hatch Cover Found During Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.4.17 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on April 17, 2013
2013.4.15 Suspension of Unit 3 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station: Cause Analysis and Countermeasures
2013.4.12 Work Performed Today (April 12) in Response to the Leakage from the Underground Reservoirs
2013.4.12 Leakage from the Pipe Flange of the Underground Reservoir No.3: Cause and Countermeasure
2013.4.11 Work Performed Today (April 11) in Response to the Leakage from the Underground Reservoirs
2013.4.11 Progress of the Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station
2013.4.11 Water Leakage from the Pipe Flange When the Water Transfer from the Underground Reservoir No.3 to No.6 was Started
2013.4.10 The Chief and the Deputy Chief of the Emergency Response Headquarters for Reliability Improvement at Fukushima Daiichi Nuclear Power Station visiting Fukushima Daiichi Nuclear Power Station for site investigation
2013.4.8 Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.4.8 Foreign Minister Kishida's visit to Fukushima Daiichi Nuclear Power Station(Apr 6, 2013)
2013.4.7 Temporary measures towards the leakage at Underground Reservoir 3 (As of 6:00 pm on April 7 ,2013)
2013.4.7 Leakage from the underground reservoir No.2 at Fukushima Daiichi Nuclear Power Station
2013.4.5 Suspension of Unit 3 Spent Fuel Pool Alternative Cooling System at Fukushima Daiichi Nuclear Power Station
2013.4.5 Status of the Continuous Dust Monitor Installed at the Main Gate of ukushima Daiichi Nuclear Power Station
2013.4.5 Cable Discoloration and a Burn on the Terminal Block of the Standby Liquid Control System Tank Heater at Fukushima Daiichi NPS
2013.4.4 Suspension of the Multi-nuclide Removal Equipment (ALPS) Due to Incorrect Operation
2013.4.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: March 2013)
2013.4.3 Installation of fibrous adsorbent purification equipment in the port
2013.4.2 Overview of Impermeable Wall Construction on the Sea Side
2013.3.29 Overview of the Multi-nuclide Removal Equipment (ALPS) at Fukushima Daiichi Nuclear Power Station
2013.3.29 Footage of TEPCO's TV conference
2013.3.29 Verification test performed at Fukushima Daini Nuclear Power Station as part of a research and development project "Development of remote decontamination technologies to be used inside buildings"
2013.3.28 The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
2013.3.27 Installation Work of the Net Preventing Fish from Moving Out Around Sea Embankments in the Port of Fukushima Daiichi NPS Completed at East Seawall Bank Side
2013.3.27 Progress Status of the Groundwater Bypass Construction
2013.3.22 Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.)
2013.3.13 Steel Frame Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station:Completion of the Third Layer of Steel Frame
2013.3.11 Closure of the Blow-out Panel Opening at Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.3.6 Disclosure of the Video of our TV Conference (Second time) (155 scenes)
2013.3.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: February 2013)
2013.3.4 Completion of Water Stop Work at the Location Where Water Inflow into Unit 3 Radioactive Waste Underground Storage Facility Building was Found at Fukushima Daiichi Nuclear Power Station
2013.2.28 Major countermeasures against tsunami at Fukushima Daiichi Nuclear Power Station
2013.2.28 Progress Status of the Groundwater Bypass Construction and Preparation for Operational Commencement
2013.2.27 Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
2013.2.25 Nuclear Disaster Training (Emergency Training) at Fukushima Daiichi Nuclear Power Station (Outline)
2013.2.18 Nuclear Disaster Training (Emergency Training) at Fukushima Daini Nuclear Power Station (Outline)
2013.2.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.8 Possibility of Debris (Assumed to be the Fuel Handling Machine Mast) Sinking in the Spent Fuel Pool at Debris Removal from the Upper Part of the Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.2.7 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.2.6 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: January 2013)
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2013.1.30 Water Leakage from the Desalination System (RO2)
2013.1.28 Suspension of Unit 3 PCV gas control system at Fukushima Daiichi Nuclear Power Station due to partial pipe replacement with steel pipe and control panel modification
2013.1.26 Barbara Judge, Vise Chairman of Nuclear Reform Monitoring Committee, visited Fukushima Daiichi NPP
2013.1.24 Fire Alarm Going off at the Auxiliary Operation Shared Facility at Fukushima Daiichi Nuclear Power Station
2013.1.18 Change of Dust Sampling Method at the Openings of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.1.16 Minister of Economy, Trade and Industry Motegi visiting the Fukushima Revitalization Headquarters and Fukushima Daiichi Nuclear Power Station
2013.1.15 Steel Framing Construction for the Cover to be Installed for Fuel Removal at Unit 4 at Fukushima Daiichi Nuclear Power Station: Completion of the First Layer of Steel Framing
2013.1.9 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: December 2012)
2012.12.29 Prime Minister Abe's visit to Fukushima Daiichi Nuclear Power Station
2012.12.28 Cause and countermeasure of air leakage from the main exhaust duct at Fukushima Daini Nuclear Power Station Unit 4
2012.12.26 Water Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2012.12.25 Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.12.25 Mega float being relocated in the port of Fukushima Daiichi Nuclear Power Station
2012.12.21 Niigata Prefecture Technical Committee's Visit to Fukushima Daiichi NPS and Daini NPS
2012.12.19 Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of the Steel Beam Which Fell into the Pool
2012.12.17 Drop test of the HIC for the Multi-Nuclide Removal Equipment
2012.12.14 IAEA (International Atomic Energy Agency) Visiting Fukushima Daiichi Nuclear Power Station on December 14, 2012
2012.12.14 Puddle Found on the First Floor of Unit 4 Waste Treatment Building at Fukushima Daiichi Nuclear Power Station
2012.12.14 Fukushima Daiichi Nuclear Power Station Video Tour
2012.12.12 Water Leakage in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.12.11 Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
2012.12.10 Leakage from the Desalination System (RO3) at Fukushima Daiichi Nuclear Power Station
2012.12.5 Completion of Water Stop Work at Unit 3 Control Building at Fukushima Daiichi Nuclear Power Station
2012.12.5 Inspection Results of Unit 5 Residual Heat Removal System Seawater Pump (C) at Fukushima Daiichi Nuclear Power Station
2012.12.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: November 2012)
2012.12.3 National Academy of Science USA Visiting Fukushima Daiichi Nuclear Power Station
2012.11.30 Disclosure of the Video of our TV Conference (Second time)
2012.11.28 Countermeasure Implementation for the Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.27 Smoke Coming out of Damaged Power Cable at Fukushima Daiichi Nuclear Power Station: Causes and Countermeasures
2012.11.27 Increase in the Reactor Injection Water Amount at Unit 3 of Fukushima Daiichi Nuclear Power Station
2012.11.20 Water Leakage from the Second Cesium Absorption Apparatus (SARRY) Vent Line
2012.11.14 Description of Changes to the Report on Facility Management Plan for Units 1-4 of Fukushima Daiichi Nuclear Power Station Based on the "Policy on the Mid-term Security"
2012.11.6 Hands-on Training for Operating the Reactor Cooling Facility at Fukushima Daiichi Nuclear Power Station
2012.11.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: October 2012)
2012.11.2 Smoke Coming out from Damaged Power Cable at Fukushima Daiichi Nuclear Power Station
2012.10.24 Hydrochloric Acid Leakage from Unit 3 Spent Fuel Pool Desalination System (Mobile RO) at Fukushima Daiichi Nuclear Power Station
2012.10.24 The Kanto Region Governors' Association Visiting Fukushima Daiichi Nuclear Power Station
2012.10.19 Fire Occurred Near Units 1-2 Ultrahigh Voltage Switchyard (Outdoor) at Fukushima Daiichi Nuclear Power Station
2012.10.15 Emergency Safety Training at Fukushima Daini Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station (October 12,13)
2012.10.15 The Water Leakage at the Accumulated Water Transferring Pipe in Unit 3 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.10.15 Investigation of the Inside of Unit 3 Spent Fuel Pool using an Underwater Camera at Fukushima Daiichi NPP (October 11・12)
2012.10.12 Wearing of Tyvek with the Chest Area Being Transparent
2012.10.12 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.11 Investigation of inside of the PCV of Unit 1, Fukushima Daiichi NPP
2012.10.10 An Issue Found with the Minimum Flow Rate Bypass Valve of Unit 5 Reactor Core Spray System (B) at Fukushima Daiichi Nuclear Power Station
2012.10.5 Water Leakage from Unit 6 Purification Equipment Pipe at Fukushima Daiichi Nuclear Power Station
2012.10.5 Footage of TEPCO's TV conference
2012.10.3 Report on the Steel Beam Falling into Unit 3 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station to the Nuclear Regulatory Authority
2012.10.3 Unit 2 RPV Alternative Thermometer Installation at Fukushima Daiichi Nuclear Power Station
2012.10.2 White Smoke Coming Out from the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.10.2 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: September 2012)
2012.9.27 Punching an Access Hole at the Penetration of Unit 1 PCV at Fukushima Daiichi Nuclear Power Station
2012.9.26 Investigation of the Inside of Unit 3 Spent Fuel Pool Using an Underwater Camera at Fukushima Daiichi Nuclear Power Station (September 26)
2012.9.25 Investigation of the inside of Unit 3 spent fuel pool using an underwater camera at Fukushima Daiichi Nuclear Power Station
2012.9.24 Completion of opening Unit 4 reactor at Fukushima Daini Nuclear Power Station
2012.9.24 Debris removal from Unit 3 spent fuel pool at Fukushima Daiichi Nuclear Power Station
2012.9.18 Water Leakage from the Desalination System Reverse Osmosis Membrane) 3
2012.9.15 Expected members of the Nuclear Power Regulatory Agency visiting Fukushima Daiichi Nuclear Power Station
2012.9.11 Framework for the Nuclear Reform(Video Message)
2012.9.11 Decrease in the Reactor Injection Amounts at Unit 1-3 at Fukushima Daiichi Nuclear Power Station (Follow-up Report)
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.9.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: August 2012)
2012.8.30 The Soundness of Unit 4 Reactor Building and Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.8.27 Installation of multi-nuclide removal equipment
2012.8.23 Videos on Entering/Exiting Fukushima Daiichi Nuclear Power Station and Checking of Dosimeter and Wearing Tyvek (Prototype with the Chest Area Being Transparent) at the Exit of the Main Anti-earthquake Building
2012.8.21 Nuclide Analysis Results of Fish and Shellfish(Greenling)
2012.8.17 Water Leakage from the Desalination System (Reverse Osmosis Membrane) 3
2012.8.14 White Smoke Coming out of the Cesium Absorption Tower Temporary Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.8.14 Water Leakage in Unit 4 Turbine Building at Fukushima Daiichi Nuclear Power Station
2012.8.9 Overview of our TV Conference System
2012.8.8 Result of Investigation on Unit 1 Operating Floor at Fukushima Daiichi Nuclear Power Station
2012.8.6 Footage of TEPCO's TV conference
2012.8.3 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan(Monthly Report: July 2012)
2012.7.31 Change of Fukuichi Live Camera Location at Fukushima Daiichi Nuclear Power Station
2012.7.27 Investigation Results of the Oil Leak from the Transformer at the Outdoor Hazardous-material Storage Tank at Fukushima Daiichi Nuclear Power Station
2012.7.25 Soot Found in the Power Panel of Unit 5 Instrument Air Compressor at Fukushima Daiichi Nuclear Power Station
2012.7.23 Fuel Oil Leakage from the Diesel Generator for the Spare Nitrogen Supply Equipment at Fukushima Daiichi Nuclear Power Station (Occurred on July 20)
2012.7.19 Unused Fuel Removal from Unit 4 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2012.7.18 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.7.13 Current Situation of the Tsunami Protection Measures at Kashiwazaki-Kariwa Nuclear Power Station (end of June,2012)
2012.7.6 Unit 4 Spent Fuel Pool Circulation Cooling System UPS Inside Inspection
2012.7.5 Emergency Training for Nitrogen Supply Equipment Abnormality at Fukushima Daiichi Nuclear Power Station
2012.7.4 TEPCO Chairman and President Visiting Fukushima Daiichi and Daini Nuclear Power Station
2012.7.3 Smoke Coming out of the Control Panel of the Compressed Air System (IA System) at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station (Follow-up)
2012.7.3 Training for the Deployment of Air-cooled Gas Turbine Power Supply Car and Control Vehicle (Start-up Operation) at Fukushima Daini Nuclear Power Station
2012.7.3 The Accumulated Water Found at Unit 2 Radioactive Waste Underground Storage Facility at Fukushima Daiichi Nuclear Power Station
2012.7.2 Smoke Coming out from the Compressed Air System (IA system) Control Panel at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.6.25 Water Stop Work at the Area Water Inflow into Unit 3 Radiation Waste Underground Storage Facility Building was Confirmed at Fukushima Daiichi Nuclear Power Station
2012.6.23 Water Overflow from the Plastic Container near Desalination System (Reverse Osmosis Membrane) No.2 at Fukushima Daiichi Nuclear Power Station
2012.6.19 Fukushima Daiichi Nuclear Power Station Unit 3 PCV Gas Control System Duct Damage
2012.6.18 Investigation Result of the Water Leak from the Decontamination Apparatus (Occurred on June 14)
2012.6.15 Action towards monitoring and decontamination
2012.6.14 Water Leak from the Decontamination Apparatus
2012.6.8 The Protection Platform Added on Unit 4 Spent Fuel Pool at Fukushima Daiichi Power Station
2012.6.8 Motor Cable Connection for the Secondary System Circulation Pump (B) of Unit 4 Spent Fuel Pool Circulation Cooling System at Fukushima Daiichi Nuclear Power Station
2012.6.5 Unit 4 Spent Fuel Pool Alternative Cooling System Secondary System Circulation Pump (A) Situation of the Burnt Area Near the Motor Terminal Housing
2012.6.5 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: May 2012)
2012.6.1 【Video】Decontamination around the truck bay door at Unit 2, Fukushima Daiichi NPS
2012.6.1 Mock-up test to check the insertability of the alternative thermometer at Unit 2, Fukushima Daiichi NPS
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.2
2012.5.28 Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4) No.1
2012.5.26 【Video】Fukushima Daiichi Nuclear Power Station Opened for an Observation (Minister of State for the Nuclear Power Policy and Administration Hosono observing Unit 4)
2012.5.16 Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
2012.5.9 Water leak near the filtrate water transfer pump room
2012.5.9 Progress Status of Fukushima Daini Nuclear Power Station Recovery Plan(Monthly Report: April 2012)
2012.4.27 Regarding leakage from water desalination (reverse osmosis membrane) 2
2012.4.27 The installation of gate monitor in connection with switchover of Fukushima Daiichi Nuclear Power Station’s Seismic Isolated Building to “Uncontrolled”
2012.4.27 The situation of trial operation of screening and decontamination area for vehicles at Fukushima Daiichi Nuclear Power Station
2012.4.24 【Video】Visitation of Fukushima Daiichi Nuclear Power Station by Mr. Nakatsuka (Deputy Minister of Cabinet Office)
2012.4.23 Fukushima Daiichi Nuclear Power Station Visitation of Mr. Nakatsuka, Senior Vice Minister of Cabinet Office
2012.4.20 Treatment policy at an early stage during nitrogen gas separator (PSA-3,PSA-4) trouble time
2012.4.16 Set up of Manned Heavy Machinery on the upper side of Unit 4 Reactor Building In the Fukushima Daiichi Nuclear Power Station
2012.4.9 Countermeasures against expansion of leakage between SPT(B) and Water Desalinations (reverse osmosis membrane)
2012.4.5 Water leakage point at concentrated water storage tank area of water desalinations (reverse osmosis membrane) in Fukushima Daiichi Nuclear Power Station
2012.3.29 Cause and countermeasures against a fire near No.3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6 on March 21, 2012
2012.3.28 Countermeasures against Water Leakage from Condensed Water Transportation Line of Water Desalinations (Reverse Osmosis Membrane)
2012.3.26 Status of the water leakage at concentrated water storage tank area of water desalinations (reverse osmosis membrane)in Fukushima Daiichi Nuclear Power Station
2012.3.26 Emergency response training at Fukushima Daiichi Nuclear Power Plant
2012.3.26 Shutdown Operation for Regular Inspection of Unit 6 of Kashiwazaki-Kariwa Nuclear Power Station
2012.3.24 Fukushima Daiichi Nuclear Power Station Scenes of disaster drill
2012.3.21 A Fire near No. 3 Light Oil Tank (Outdoor Type) of Fukushima Daiichi Nuclear Power Station Unit 5 and 6
2012.3.9 Fukushima Daiichi Nuclear Power Station System Chart <before construction>
2012.2.27 Emergency Drill at Fukushima Daini Nuclear Power Station(Outline)
2012.2.25 Water leakage at Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building), Fukushima Daiichi Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.2.23 Operational Change of Wearing Protective Equipment at the Site of Fukushima Daiichi Nuclear Power Station
2012.2.22 Installment of Small-sized Incinerator in Fukushima Daiichi Nuclear Power Station
2012.2.21 Fukushima Daiichi Nuclear Power Plant Start of marine soil coating construction inside the port
2012.2.8 Water Leakage from Temporary Tank at east side of Unit 2 T/B(Temporary Tank at east side of Unit 2 T/B)
2012.2.6 Water leakage from the water desalination facility (Reverse osmosis Membrane) concentrated water tank
2012.2.3 Leakage from water desalinations(RO)concentrated water tank
2012.2.2 Situation of Water Leakage at First Floor in Reactor Building at Unit 4 of Fukushima Daiichi Nuclear Power Station
2012.2.1 Status of Water Leakage on the 1st floor of Unit 4 Reactor Building, Fukushima Daiichi Nuclear Power Station (Test line of the Piping for Jet Pump Measurement)
2012.2.1 Water Leakage observed around the flowmeter of Emergency Reactor Injection Pump (C) on the Hill at Fukushima Daiichi Nuclear Power Station
2012.1.29 Water leakage in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange around the Demineralizer of the Evaporation Concentration Apparatus in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Valve Flange of Mini Flow Piping of the Waste RO Supply Pump in Fukushima Daiichi Nuclear Power Station
2012.1.28 The Water Leakage from the Vent Valve around the Normal Reactor Injection Pump (B) on the Hill (on Standby) in Fukushima Nuclear Power Station
2012.1.26 Response training to abnormal conditions that occurred at Spent Fuel Pool per the Safety Regulation
2012.1.21 The situation of accumulated water leakage at transfer line from the basement of turbine building of Unit 2 to Miscellaneous Solid Waste Volume Reduction Treatment Building�iHigh Temperature Incinerator Building)
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2012.1.18 Trial examination at Fukushima Daiichi Nuclear Power Station Unit 5 for inner inspection of PCV of Fukushima Daiichi Nuclear Power Unit 2
2012.1.16 Scenery of obstacle removal by crane barge at intake cannel of Unit 1 to 4
2012.1.12 Status of inspection work of the main turbine of Unit 4
2012.1.10 Water leakage from the concentrated water tank of the water desalinations (reverse osmosis membrane)
2012.1.8 Circulating Cooling System for Spent Fuel Pool of Unit 4 in Fukushima Daiichi Nuclear Power Station Leakage of Filtered Water from Cooling Pipe of Air Fin Cooler
2011.12.24 Unit 3 of Fukushima Daiichi Nuclear Power Station Swelling of Water Injection Hose to Reactor
2011.12.20 Alarm activation "FLOW DIFFERENCE LARGE" at SFP Cooling System of Fukushima Daiichi Nuclear Power Station Unit 2
2011.12.19 Accumulated water in the trench between Process Main Building and Miscellaneous Solid Waste Volume Reduction Treatment Building (High Temperature Incinerator Building) in the Centralized Radiation Waste Treatment Facility at Fukushima Daiichi Nuclear Power Station
2011.12.17 Discussions at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the 6th floor of Unit 1 reactor building at Fukushima Daini Nuclear Power Plant
2011.12.17 Visiting the main control room of Unit 1 and 2 at Fukushima Daini Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daini Nuclear Power Plant
2011.12.17 Discussions at Fukushima Daiichi Nuclear Power Plant
2011.12.17 Greetings when visiting Fukushima Daiichi Nuclear Power Plant
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.12.14 Status of the solid waste storage at Fukushima Daiichi Nuclear Power Plant.
2011.12.8 Emergency Security Measures "Nighttime Training" Conducted on Dec. 7
2011.12.3 Series of Explanatory Videos Vol.2 No.3
2011.11.26 Series of Explanatory Videos Vol.3 No.2
2011.11.12 Series of Explanatory Videos Vol.2 No.4
2011.11.11 Situation of J-Village / Report from the site of Fukushima Daiichi Nuclear Power Station
2011.11.9 Liquid leakage in the desalting facility for the spent fuel pool in Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.11.4 Influenza vaccination at J village
2011.10.29 Circumstances of the accident when dismantling a large-size crane
2011.10.27 Operation of gas monitoring system inside the primary containment vessel at Fukushima Daiichi Nuclear Power Plant Unit 2
2011.10.22 Series of Explanatory Videos Vol.2 No.1
2011.10.22 Report from the site of Fukushima Daiichi Nuclear Power Station
2011.10.15 Current Situation of Fukushima Daiichi Nuclear Power Plant in Pictures -J Village Edition
2011.10.15 "On-site Practicesite Practice", training of emergency countermeasures for safety at Fukushima Daini Nuclear Power Station
2011.10.12 Water injection practice at Fukushima Daiichi Nuclear Power Station
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of the cut trees from the northwest of Unit 5 and 6, Fukushima Daiichi Nuclear Power Plant
2011.10.1 Overview of Dust Collector System
2011.9.24 Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.22 Fukushima Daichi Nuclear Power Station Inflow spot of rainwater in the basement of Turbine Building, Unit 6
2011.9.20 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.9.20 Water Leakage of Desalination Facilities (RO) on Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.11 TEPCO's President Toshio Nishizawa visits Fukushima Daiichi Nuclear Power Plant on September 11th, marking six months since the occurrence of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.1 The water leakage spot of the sludge transfer pump casing
2011.8.20 Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.8.17 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.8.11 Securing and developing human resources for the responses of the accident
2011.8.1 Evaporative concentration equipment
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.29 Rest area on the 2nd floor of Unit1/2 Service Building
2011.7.29 Rest area for construction of covers of Unit1 Reactor Building(Shimizu Corporation)
2011.7.26 Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station
2011.7.26 Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
2011.7.14 Meeting Room at the Fhkushima Daiichi Stabilization Center
2011.7.12 The repaired part for chemical leakage of water treatment system(before/after repair)
2011.7.10 The repaired part for chemical leakage of water treatment system (coagulation settling facility)
2011.7.10 Chemical Injection Leakage Point in the Water Treatment Facility System (Coagulation Settling Equipment)
2011.7.6 Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.7.6 New Hirono Domitory
2011.7.3 Leakage from Waterpipes of Outline of Temporary RHRS Pump at Unit 5
2011.7.2 Status of establishing rest areas for workers
2011.7.2 Status of preparation for the countermeasures against heat stroke such as Cool Vest
2011.7.1 Fulfillment/reinforcement of medical establishment (Establishment of an emergency medical room)
2011.7.1 Central Load Dispatching office
2011.7.1 Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.24 Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
2011.6.14 First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.11 Inside of Unit 2 Turbine Building of Fukushima Daiichi
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.10 Fukushima Daiichi Nuclear Power Station Status of setting rest areas
2011.6.10 Fukushima Daini Nuclear Power Station Status of improvement on working conditions
2011.6.8 Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Poo
2011.6.5 Image of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
2011.6.4 Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
2011.5.31 Oil slick near the cartain wall of the Unit 5 and 6
2011.5.29 Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.5.27 IAEA Fukushima Visit
2011.5.22 Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Mega Float entering the port
2011.5.20 gamma camera
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.18 Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.14 Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
2011.5.14 The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
2011.5.12 a model of a nuclear reactor pressure vessel
2011.5.10 Robots
2011.5.9 North side of the second floor ,Northwest side of the first floor(Fukushima Daiichi Nuclear Power Station Unit1)
2011.5.8 Fukushima Daiichi Nuclear Power Station Status of Improved Working Environment Inside of Reactor Building of Unit 1-First Floor of Turbine Building of Unit 1
2011.5.5 The ambient air filtration system (Alara Venti Jumbo)
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Forklift truck for removing rubble(source:Mitsubishi Heavy Industries, Ltd.)
2011.4.26 Remote-controlled crawler dump
2011.4.18 Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.11 Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)
2011.4.9 The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
2011.4.8 No title(uploaded on Apr 8,2011)
2011.4.7 Arrival of "Mega Float"
2011.3.29 Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.27 Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.3.24 Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
2011.3.23 Control room of Fukushima Daiichi Nuclear Power Station

to TOP


  1. HOME
  2. Photo collection