Progress Status of Covering the Marine Soil of the Port of Fukushima Daiichi Nuclear Power Station
Upload dateMay 16, 2012

Photo

Before the marine soil was covered
(Photo taken on February 26,2012)

After the second covering layer was completed
(Photo taken on April 29,2012)
Video
The Conditon of the First Covering Layer (0:15)
Play Video / Download (3.06MB)
The Conditon of the Second Covering Layer (0:10)
Play Video / Download (1.44MB)
Category
■Search by status/measures
Mitigation of radioactive materials / Work / Others