Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Status of the accident

Upload dates
Title
2020.12.22 Status of the Fukushima Daiichi Nuclear Power Station accident
2013.3.28 The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
2013.2.7 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.9.11 (40)Around the Unit 4 Reactor Building
2012.9.11 (39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (37)Unit 2 Transformer Area
2012.9.11 (36)Unit 1 Transformer Area
2012.9.11 (35)Unit 4 Instrument Air Compressor
2012.9.11 (34)Around the Unit 1 Large Equipment Hatch
2012.9.11 (33)Inside the Unit 2 Power Source Room
2012.9.11 (32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside)
2012.9.11 (30)Sea side area of Unit 2
2012.9.11 (29)Sea side area of Unit 1
2012.9.11 (28)At Fukushima Daiichi Nuclear Power Station
2012.9.11 (27)Inside the Unit 2 Basement Power Source Room
2012.9.11 (26)Inside the Unit 2 Alternate Power Source Room
2012.9.11 (25)Around the Unit 2 Alternate Power Source Room
2012.9.11 (24)Inside the Unit 1 Power Source Room
2012.9.11 (23)Around the Outdoor Power Panel
2012.9.11 (22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
2012.9.11 (21)Inside Reserve Power Substation
2012.9.11 (20)Around Reserve Power Substation
2012.9.11 (19)Unit 6 Transformer Area
2012.9.11 (18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (17)Unit 5 Transformer Area
2012.9.11 (16)Unit 5 and 6 Switchyard Area (Outside)
2012.9.11 (15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4.
2012.9.11 (14)Inside the Unit 5 Power Source Room
2012.9.11 (13)Inside the Unit 5 and 6 Vertical Shafts
2012.9.11 (12)Inside the Unit 6 Power Source Room
2012.9.11 (11)Inside the Unit 5 and 6 Transmission Board Room
2012.9.11 (10)Inside the Unit 5 and 6 Main Control Room
2012.9.11 (9)Sea side area of Unit 5 and 6
2012.9.11 (8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3
2012.9.11 (7)Appearance of Unit 1 after the explosion
2012.9.11 (6)The situation at Fukushima Daiichi Nuclear Power Station in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (5)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
2012.9.11 (4)The situation at Fukushima Daiichi Nuclear Power Station after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (3)The situation at Fukushima Daiichi Nuclear Power Station (Main Office Building, etc.) after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.9.11 (2)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit (Undertow)
2012.9.11 (1)The shallow draft quay in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2012.7.13 Status of Fukushima Daiichi Nuclear Power Station When the Tsunami hit
2012.4.19 Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
2012.4.18 Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
2012.4.16 【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.4.13 Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
2012.3.22 Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
2012.3.22 Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2012.3.16 The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
2012.3.16 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
2012.3.15 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.14 Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.2.28 Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
2012.2.24 TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2011.12.23 The crack of axle linkage casing at the overhead crane in the building of spent fuel common pool, Fukushima Daiichi Nuclear Power Station
2011.12.17 Current view of Fukushima Daiichi Nuclear Power Plant
2011.11.11 Situation of J-Village / Report from the site of Fukushima Daiichi Nuclear Power Station
2011.11.10 Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 1 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.9.24 Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.6 Site Photographs of Fukushima Daini Nuclear Power Station
2011.8.30 Unit 4, Fukushima Daini Nuclear Power Station Accumulated water in Primary Containment Vessel
2011.8.17 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.8.10 Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.8.1 Debris and gravels with high radiation dose confirmed in July
2011.7.1 Spent Fuel Pool in Reactor Building , Unit 4, Fukushima Daiichi Nuclear Power Station
2011.6.30 Results of Investigation on 5th Floor of the Reactor Building Unit 4
2011.6.20 Reference Picture 1 "Initial response at the time of and after the Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi Nuclear Power Station"
2011.6.20 Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.6.11 Pictured at South Side on 4th floor of Unit 4 Reactor Building
2011.6.8 The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
2011.6.5 High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
2011.6.4 Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
2011.5.29 Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
2011.5.24 Fukushima Daiichi Nuclear Power Station pictures taken from the observation deck
2011.5.22 Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Rubble around the reactor building
2011.5.19 The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
2011.5.19 Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station(2)
2011.5.19 Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.10 Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.5.8 Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.5.6 Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
2011.5.3 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.29 The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
2011.4.28 Fukushima Daiichi Nuclear Power Station
2011.4.28 Robot, Truck etc.
2011.4.27 Movies taken from T-Hawk
2011.4.27 Site observation by the packbot in the nuclear reactor building of Unit 1
2011.4.20 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
2011.4.19 The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
2011.4.17 Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
2011.4.15 A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
2011.4.12 Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
2011.4.11 Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.9 The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
2011.3.29 Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.27 Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
2011.3.24 Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
2011.3.23 Control room of Fukushima Daiichi Nuclear Power Station
2011.3.21 Unit 3 of Fukushima Daiichi Nuclear Power Station
2011.3.17 Unit 3,Uniit4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter)
2011.3.16 Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station
2011.3.11 Unit 1 of Fukushima Daiichi Nuclear Power Station