2020.12.22
|
Status of the Fukushima Daiichi Nuclear Power Station accident
|
2013.3.28
|
The fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station (March 28, 2013)
|
2013.2.7
|
Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
|
2013.2.1
|
Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
|
2012.9.11
|
(40)Around the Unit 4 Reactor Building
|
2012.9.11
|
(39)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Inside)
|
2012.9.11
|
(38)Unit 1 and 2 Ultraigh Voltage Switchyard Area (Outside)
|
2012.9.11
|
(37)Unit 2 Transformer Area
|
2012.9.11
|
(36)Unit 1 Transformer Area
|
2012.9.11
|
(35)Unit 4 Instrument Air Compressor
|
2012.9.11
|
(34)Around the Unit 1 Large Equipment Hatch
|
2012.9.11
|
(33)Inside the Unit 2 Power Source Room
|
2012.9.11
|
(32)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Inside)
|
2012.9.11
|
(31)Unit 3 and 4 Ultraigh Voltage Switchyard Area (Outside)
|
2012.9.11
|
(30)Sea side area of Unit 2
|
2012.9.11
|
(29)Sea side area of Unit 1
|
2012.9.11
|
(28)At Fukushima Daiichi Nuclear Power Station
|
2012.9.11
|
(27)Inside the Unit 2 Basement Power Source Room
|
2012.9.11
|
(26)Inside the Unit 2 Alternate Power Source Room
|
2012.9.11
|
(25)Around the Unit 2 Alternate Power Source Room
|
2012.9.11
|
(24)Inside the Unit 1 Power Source Room
|
2012.9.11
|
(23)Around the Outdoor Power Panel
|
2012.9.11
|
(22)Cable Route from the Reserve Power Substation to Unit 2 Turbine Building Power Panel
|
2012.9.11
|
(21)Inside Reserve Power Substation
|
2012.9.11
|
(20)Around Reserve Power Substation
|
2012.9.11
|
(19)Unit 6 Transformer Area
|
2012.9.11
|
(18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
|
2012.9.11
|
(17)Unit 5 Transformer Area
|
2012.9.11
|
(16)Unit 5 and 6 Switchyard Area (Outside)
|
2012.9.11
|
(15)The Situation at Fukushima Daiichi Nuclear Power Station after the explosion of Unit 1,3 and 4.
|
2012.9.11
|
(14)Inside the Unit 5 Power Source Room
|
2012.9.11
|
(13)Inside the Unit 5 and 6 Vertical Shafts
|
2012.9.11
|
(12)Inside the Unit 6 Power Source Room
|
2012.9.11
|
(11)Inside the Unit 5 and 6 Transmission Board Room
|
2012.9.11
|
(10)Inside the Unit 5 and 6 Main Control Room
|
2012.9.11
|
(9)Sea side area of Unit 5 and 6
|
2012.9.11
|
(8)Appearance of Unit 3 after the explosion, and appearance of Unit 4 before the explosion viewed from Unit 3
|
2012.9.11
|
(7)Appearance of Unit 1 after the explosion
|
2012.9.11
|
(6)The situation at Fukushima Daiichi Nuclear Power Station in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
|
2012.9.11
|
(5)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit
|
2012.9.11
|
(4)The situation at Fukushima Daiichi Nuclear Power Station after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
|
2012.9.11
|
(3)The situation at Fukushima Daiichi Nuclear Power Station (Main Office Building, etc.) after the Tohoku-Chihou-Taiheiyo-Oki Earthquake
|
2012.9.11
|
(2)The status of Fukushima Daiichi Nuclear Power Station when the tsunami hit (Undertow)
|
2012.9.11
|
(1)The shallow draft quay in the aftermath of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
|
2012.7.13
|
Status of Fukushima Daiichi Nuclear Power Station When the Tsunami hit
|
2012.4.19
|
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
|
2012.4.18
|
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
|
2012.4.16
|
【Video】Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
|
2012.4.13
|
Survey on the inside of Unit 3 Spent Fuel Pool for Removal of Debris , Fukushima Daiichi Nuclear Power Station
|
2012.3.22
|
Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
|
2012.3.22
|
Result of transparency investigation inside the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
|
2012.3.16
|
The Video for the Survey inside the Spent Fuel Pool of Unit 4, Fukushima Daiichi
|
2012.3.16
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS (2)
|
2012.3.15
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
2012.3.14
|
Preliminary survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS
|
2012.3.2
|
Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
|
2012.2.28
|
Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
|
2012.2.24
|
TEPCO's explanatory material for the workshop of technique catalogue related to equipment/device development for preparation of fuel debris removal towards the decommissioning of Fukushima Daiichi Nuclear Power Station
|
2012.1.20
|
Current Status of Fukushima Daiichi Nuclear Power Station by photographs
|
2011.12.23
|
The crack of axle linkage casing at the overhead crane in the building of spent fuel common pool, Fukushima Daiichi Nuclear Power Station
|
2011.12.17
|
Current view of Fukushima Daiichi Nuclear Power Plant
|
2011.11.11
|
Situation of J-Village / Report from the site of Fukushima Daiichi Nuclear Power Station
|
2011.11.10
|
Survey result of damages to air-conditioning ducts etc. in the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
|
2011.10.8
|
Situation of Upper Part of Unit 1 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.10.8
|
Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.10.8
|
Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.10.8
|
Status of Fukushima Daiichi Nuclear Power Plants shown in photos
|
2011.9.24
|
Situation of Upper Part of Unit 3 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.9.24
|
Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
|
2011.9.9
|
Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
|
2011.9.6
|
Site Photographs of Fukushima Daini Nuclear Power Station
|
2011.8.30
|
Unit 4, Fukushima Daini Nuclear Power Station Accumulated water in Primary Containment Vessel
|
2011.8.17
|
Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
|
2011.8.10
|
Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
|
2011.8.1
|
Debris and gravels with high radiation dose confirmed in July
|
2011.7.1
|
Spent Fuel Pool in Reactor Building , Unit 4, Fukushima Daiichi Nuclear Power Station
|
2011.6.30
|
Results of Investigation on 5th Floor of the Reactor Building Unit 4
|
2011.6.20
|
Reference Picture 1 "Initial response at the time of and after the Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi Nuclear Power Station"
|
2011.6.20
|
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
|
2011.6.11
|
Pictured at South Side on 4th floor of Unit 4 Reactor Building
|
2011.6.8
|
The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station
|
2011.6.5
|
High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
|
2011.6.4
|
Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
|
2011.5.29
|
Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
|
2011.5.24
|
Fukushima Daiichi Nuclear Power Station pictures taken from the observation deck
|
2011.5.22
|
Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
|
2011.5.21
|
Fukushima Daiichi Nuclear Power Station Rubble around the reactor building
|
2011.5.19
|
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
|
2011.5.19
|
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station(2)
|
2011.5.19
|
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
|
2011.5.17
|
Fukushima Daiichi Nuclear Power Station Current status of restoration work
|
2011.5.10
|
Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station
|
2011.5.8
|
Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station
|
2011.5.6
|
Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
|
2011.5.3
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.29
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.29
|
The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
|
2011.4.28
|
Fukushima Daiichi Nuclear Power Station
|
2011.4.28
|
Robot, Truck etc.
|
2011.4.27
|
Movies taken from T-Hawk
|
2011.4.27
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.20
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
|
2011.4.19
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
|
2011.4.17
|
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
|
2011.4.16
|
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
|
2011.4.15
|
A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
|
2011.4.15
|
A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
|
2011.4.12
|
Fukushima Daiichi Nuclear Power Station(When fire was detected, After initial extinction, Before installing steel water bars, Sampling of water from the spent fuel pool)
|
2011.4.11
|
Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
|
2011.4.11
|
Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
|
2011.4.11
|
Motion pictures of Fukushima Daiichi Nuclear Power Station
|
2011.4.9
|
The tsunami which attacked Fukushima Daiichi Nuclear Power Station and main building
|
2011.3.29
|
Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
|
2011.3.27
|
Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
|
2011.3.24
|
Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
|
2011.3.23
|
Control room of Fukushima Daiichi Nuclear Power Station
|
2011.3.21
|
Unit 3 of Fukushima Daiichi Nuclear Power Station
|
2011.3.17
|
Unit 3,Uniit4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter)
|
2011.3.16
|
Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station
|
2011.3.11
|
Unit 1 of Fukushima Daiichi Nuclear Power Station
|