Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

October 2013

Upload dates
Title
2013.10.30 Fuel Discharge from Reactor 4 Spent Fuel Pool in Fukushima Daiichi NPS
2013.10.30 Additional Measures against Contamination Expansion at H4 area in Fukushima Daiichi NPS
2013.10.25 Precautionary Measures of Accumulated Water inside the Dike against Typhoon No.27 (Francisco) at Fukushima Daiichi NPS
2013.10.25 Countermeasure against Rainwater in Tank Area at Fukushima Daiichi NPS
2013.10.25 Collapse on south slope at Okuma street due to influence of typhoon No.26
2013.10.23 Fire near General Waste Incinerator in Fukushima Daiichi NPS -Cause and Countermeasure-
2013.10.22 Carry-in and Installation of Filter Vent at Kashiwazaki-Kariwa NPS
2013.10.17 Completion of fuel transfer at Unit 2 in Fukushima Daini Nuclear Power Station
2013.10.16 Debris Removal Work on the Roof Top of the Unit 3 Reactor Building at Fukushima Daiichi NPS Completion of Large Debris Removal and Implementation of Lowering Radiation Dose
2013.10.16 Pumping up of rainwater inside the dike in reaction to the approaching Typhoon No. 26 (Wipha)
2013.10.09 Leakage inside Temporary Warehouse for Desalination System (Reverse Osmosis Membrane) RO-3
2013.10.08 Investigation into the Bottom Plate etc. of the Tank No.5 in H4 Area at Fukushima Daiichi NPS
2013.10.07 Seismic Safety Evaluation of Fukushima Daiichi NPS Units 1 and 2 Exhaust Stack Having Damaged Components
2013.10.07 The Suspension of the Common On-Site Power Supply (3B) Facilities at Fukushima Daiichi NPS
2013.10.03 Leakage from B Area South Tank
2013.10.01 Overflow of Water from the Notch Tank for H6 Area Located on the East of H5 Area at Fukushima Daiichi NPS

to TOP


  1. HOME
  2. Photo collection