Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Cooling of reactors

Upload dates
Title
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.11.6 Hands-on Training for Operating the Reactor Cooling Facility at Fukushima Daiichi Nuclear Power Station
2012.8.27 Installation of multi-nuclide removal equipment
2012.8.9 Reliability Improvement of the Second Cesium Absorption Apparatus
2012.7.17 Operational Commencement of the Refrigerators Installed by the Treatment Water Buffer Tank at Fukushima Daiichi Nuclear Power Station
2012.6.12 Reliability Enhancement Work for the Cesium Absorption Apparatus
2012.2.1 Measures against Freeze of Water Treatment Facility / Measures against Freeze of Reactor Water Injection System at Fukushima Daiichi Nuclear Power Station
2011.12.21 Installation of Temporary Storage for Cesium Adsorption Tower
2011.11.5 Series of Explanatory Videos Vol.2 No.3
2011.10.29 Series of Explanatory Videos Vol.2 No.2
2011.10.24 Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.15 Series of Explanatory Videos Vol.1 No.4
2011.10.1 Series of Explanatory Videos Vol.1 No.3
2011.9.17 Series of Explanatory Videos Vol.1 No.2
2011.9.10 Series of Explanatory Videos Vol.1 No.1
2011.8.1 Evaporative concentration equipment
2011.7.26 The 2nd Cesium Adsorption Facility (SARRY)
2011.6.30 Transfer of the low level accumulated water to Megafloat
2011.6.17 Temporary storage tanks (for treated water at Intermediate-and-low-level Radioactive Water Treatment Facility)
2011.6.17 Cesium Absorption Apparatus
2011.6.11 Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
2011.6.10 Transportation of large tank to Fukushima Daiichi Nuclear Power Station
2011.6.4 Outline of water processing facilities
2011.6.2 Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.6.1 Circulating Seawater Purification Equipment at the Fukushima Daiichi Nuclear Power Station
2011.5.21 Fukushima Daiichi Nuclear Power Station Mega Float entering the port
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work
2011.5.15 Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
2011.5.14 Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
2011.5.11 The situation of water stop at the pit near the water intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.5.11 The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
2011.4.16 a sandbag containing zeolite
2011.4.11 Motion pictures of Fukushima Daiichi Nuclear Power Station
2011.4.7 Arrival of "Mega Float"
2011.4.6 Shutoff of water outflow was confirmed
2011.4.2 Near of the Sea Water intake of Unit2
2011.4.1 Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
2011.4.1 Dispersing Dust Protectant, Common Pool Area
2011.4.1 Water pumping using a concrete pumping car for Unit 4 of Fukushima Daiichi Nuclear Power Station
2011.3.22 Water pumping using a concrete pumping car

to TOP


  1. HOME
  2. Photo collection