Operational Commencement of the Refrigerators Installed by the Treatment Water Buffer Tank at Fukushima Daiichi Nuclear Power Station
Upload dateJuly 17, 2012
![Back: Treatment water buffer tank, Front: Refrigerators Back: Treatment water buffer tank, Front: Refrigerators](/library/120717/120717_01.jpg)
Photo
![Back: Treatment water buffer tank, Front: Refrigerators Back: Treatment water buffer tank, Front: Refrigerators](/library/120717/120717_01_t.jpg)
Back: Treatment water buffer tank, Front: Refrigerators
Photo taken on July 13, 2012
Photo taken by Tokyo Electric Power Company
![Pipe connection for the refrigerators Pipe connection for the refrigerators](/library/120717/120717_02_t.jpg)
Pipe connection for the refrigerators
Photo taken on July 13, 2012
Photo taken by Tokyo Electric Power Company
Category
■Search by status/measures
Cooling of reactors