Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

February 2013

Upload dates
Title
2013.02.28 Major countermeasures against tsunami at Fukushima Daiichi Nuclear Power Station
2013.02.28 Progress Status of the Groundwater Bypass Construction and Preparation for Operational Commencement
2013.02.27 Puddle found in Unit 2 Turbine Building of Fukushima Daiichi Nuclear Power Station
2013.02.25 Nuclear Disaster Training (Emergency Training) at Fukushima Daiichi Nuclear Power Station (Outline)
2013.02.22 Results of Investigation of Unit 2 Reactor Building Operation Floor tilizing a Gamma Camera
2013.02.22 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 2)
2013.02.21 Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station (Day 1)
2013.02.21 Investigation Results of Unit 3 Spent Fuel Pool Utilizing an Underwater Camera at Fukushima Daiichi Nuclear Power Station (Performed on February 14, 15, 16 and 18)
2013.02.18 Nuclear Disaster Training (Emergency Training) at Fukushima Daini Nuclear Power Station (Outline)
2013.02.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.02.15 Investigation of the fourth floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station(Video on Nov 30, 2012)
2013.02.14 Drilling Holes for the Investigation of Unit 1 Torus Room at Fukushima Daiichi Nuclear Power Station
2013.02.13 Investigation of the Inside of Spent Fuel Pool Utilizing an Underwater Camera as Part of Debris Removal from the Upper Part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.02.13 Results of the Fourth Soundness Inspection of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.02.08 Possibility of Debris (Assumed to be the Fuel Handling Machine Mast) Sinking in the Spent Fuel Pool at Debris Removal from the Upper Part of the Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
2013.02.07 Video of the inside of the Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station shown to the investigative panel appointed by the parliament on February 28, 2012 (Videotaped on October 18, 2011)
2013.02.06 Progress Status of Fukushima Daini Nuclear Power Station Restoration Plan (Monthly Report: January 2013)
2013.02.06 Debris Removal from the Upper part of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station: Removal of Steel Truss Debris
2013.02.01 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)

to TOP


  1. HOME
  2. Photo collection