2022.5.23
|
Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 19) at the Fukushima Daiichi Nuclear Power Station
|
2022.5.19
|
Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between May 17 and 18) at the Fukushima Daiichi Nuclear Power Station
|
2022.3.24
|
Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between March 14~16) at the Fukushima Daiichi Nuclear Power Station
|
2022.3.14
|
Implementation Status of Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (Preliminary report) at the Fukushima Daiichi Nuclear Power Station
|
2022.2.10
|
Implementation Status of the Unit 1 Primary Containment Vessel Internal Investigation (As of February 10) at the Fukushima Daiichi Nuclear Power Station
|
2019.2.13
|
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Investigation Results - Preliminary Report on February 13 -
|
2018.1.19
|
Progress of Unit 2 PCV internal investigation (Preliminary report of January 19 investigation)
|
2017.7.22
|
Progress of Unit 3 PCV internal investigation (Preliminary report of July 22 investigation)
|
2017.7.21
|
Progress of Unit 3 PCV internal investigation (Preliminary report of July 21 investigation)
|
2017.7.19
|
Progress of Unit 3 PCV internal investigation (Preliminary report of July 19 investigation)
|
2017.4.7
|
Unit 1 Primary Containment Vessel Internal Investigation(deposition sample collection)
|
2017.4.3
|
Unit 1 Primary Containment Vessel internal investigation (State of the field work)
|
2017.3.27
|
Unit 1 Primary Containment Vessel Internal Investigation
|
2017.3.23
|
Progress of Unit 1 PCV internal investigation (Preliminary report of March 22 investigation)
|
2017.3.22
|
Progress of Unit 1 PCV internal investigation (Preliminary report of March 21 investigation)
|
2017.3.21
|
Progress of Unit 1 PCV internal investigation (Preliminary report of March 19 and 20 investigations)
|
2017.3.19
|
Progress of Unit 1 PCV internal investigation (Preliminary report of March 18 investigation)
|
2017.3.18
|
Progress of Unit 1 PCV internal investigation (Beginning of the investigation)
|
2017.2.16
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Investigation results by the self-propelled investigation device)
|
2017.2.15
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (By the self-propelled investigation device)
|
2017.2.9
|
Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (Results of deposit removal work)
|
2017.2.2
|
Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station (examination results of digital images)
|
2017.1.30
|
Pre-investigation results of the area inside the pedestal for the Unit 2 Primary Containment Vessel investigation at Fukushima Daiichi Nuclear Power Station
|
2017.1.26
|
Pre-investigation results of X-6 penetration for the Unit 2 Primary Containment Vessel Investigation at Fukushima Daiichi Nuclear Power Station
|
2016.12.26
|
Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
|
2016.12.24
|
Completion of drilling a hole toward investigation inside Unit 2 Primary Containment Vessel (PCV) at Fukushima Daiichi Nuclear Power Station
|
2016.9.26
|
Radiation Dose Survey for the Units 1-2 Exhaust Stack at Fukushima Daiichi Nuclear Power Station
|
2015.4.20
|
"Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"- Results of follow up check after the site test "Investigation B1"on grating around the pedestal inside Unit 1 PCV - [Report for April 18 and April 19, 2015]
|
2015.4.17
|
(4/20 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV - [Prompt report for April 16, 2015]
|
2015.4.16
|
(4/17 video added) "Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" - Site test "Investigation B1" on grating around the pedestal inside Unit 1 PCV -[Prompt report for April 15]
|
2015.4.13
|
"Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)" -Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV-
|
2015.4.10
|
"Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)"‐Site test "Investigation B1" report on grating around the pedestal inside Unit 1 PCV‐(Prompt report of inspection commencement on April 10, 2015)
|
2014.9.30
|
Results of Research Concerning Exterior Section under S/C (Suppression Chamber) at Unit 2
|
2014.9.9
|
Demonstration Test of the Exterior Surface Survey Equipment for the Lower Part of the Suppression Chamber under Development at the Research and Development of "Development of Survey/Repair (Water stoppage) Technologies for Watering the Containment Vessel"
|
2014.7.29
|
Survey of wall of torus room in Unit 2 in Fukushima Daiichi NPS (Report for demonstration survey in R & D project)
|
2014.5.30
|
Demonstration test of survey equipment for the upper part of S/C (Pressure Suppression Chamber) at Unit 1 of the Fukushima Daiichi Nuclear Power Station.
|
2013.8.26
|
Removal of Obstacles Including Debris, etc., at the Southwest Side on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.7.26
|
Removal of the Obstacles Including Debris, etc., on the First Floor of the Reactor Building of the Fukushima Daiichi Nuclear Power Station Unit 3
|
2013.6.19
|
Results of Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
|
2013.6.17
|
Survey on Upper Space in 1st Floor of Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building
|
2013.4.16
|
Investigation Results of the MSIV Room on the First Floor of Unit 2 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.4.9
|
Results of Investigation of the Personnel Access Lock Room on the First Floor of Unit 1 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2013.3.13
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.6
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2013.3.5
|
Results of Investigation of the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2012.12.11
|
Results of Investigation on the Lower Part of Unit 2 Vent Pipe at Fukushima Daiichi Nuclear Power Station
|
2012.12.11
|
Investigation on the lower part of Unit 2 vent pipe at Fukushima Daiichi Nuclear Power Station (Mockup test)
|
2012.11.28
|
Inspection Results of Unit 3PCV Gas Control System Duct at Fukushima Daiichi Nuclear Power Station
|
2012.11.26
|
Unit 3 PCV Gas Control System Duct Inspection at Fukushima Daiichi Nuclear Power Station
|
2012.7.12
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building Basement Torus Room Investigation
|
2012.7.5
|
Investigation Result of Unit 1 Reactor Building TIP Room and South Area at Fukushima Daiichi Nuclear Power Station
|
2012.7.5
|
“Development of Remote Decontamination Technology” Result of Unit 2-3 Reactor Building Investigation
|
2012.6.14
|
Fukushima Daiichi Nuclear Power Station Unit 2 Reactor Building Inspection
|
2012.5.25
|
【Video】"Development of Remote Decontamination Technology in the Reactor Building" Robot Investigation Results of Unit 1 Reactor Building
|
2012.5.24
|
Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012)
|
2012.4.19
|
Investigation in the Torus Room on Unit 2 basement floor of the reactor building Investigation in the Torus Room on Unit 2 basement floor of the reactor building
|
2012.4.18
|
Photo of the Situation of the Torus Room taken by the Robot In the Unit 2 of Fukushima Daiichi Nuclear Power Plant
|
2012.4.17
|
Overveiw of the Robot(Survey Runner)
|
2012.3.22
|
Survey Results of TIP Room in Ground-floor at Reactor Building, Unit 2 at Fukushima Daiichi Nuclear Power Station
|
2012.2.28
|
Investigation result by the robot (quince2) on the 5th operating floor of the Reactor Building of Unit 2 Fukushima Daiichi Nuclear Power Station
|
2011.11.22
|
Unit 3, Fukushima Daiichi Nuclear Power Station Wiping work of rails for the equipment hatch, the Pressure Containment Vessel
|
2011.11.16
|
Survey and Cleaning in Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2011.11.5
|
Obstacle Removal by Robot and Radiation Dose Measurement after the Removal on the First Floor of Unit 3 Reactor Building at Fukushima Daiichi Nuclear Power Station
|
2011.10.21
|
Inside of Reactor Building of Unit 2, Fukushima Daiichi Nuclaer Power Station
|
2011.10.21
|
Airborne Radiation and Temperature in Reactor Building of Unit 2, Surveyed by Robot
|
2011.10.15
|
Result of temperature measurement by infrared camera from right above the reactor
|
2011.9.28
|
JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
|
2011.7.28
|
Video by Quince Robot within Fukushima Daiichi Nuclear Power Station Unit 3 reactor building
|
2011.7.27
|
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
|
2011.7.16
|
Investigation of the status in the Reactor Building, Unit 2, Fukushima Daiichi Nuclear Power Station by Quince
|
2011.7.2
|
Cleanup work by using a robot in Unit 3 Reactor Building at Fukushima Daiichi Power Station
|
2011.6.30
|
Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
|
2011.6.24
|
Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
|
2011.6.20
|
Robot:Quince
|
2011.6.20
|
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
|
2011.6.4
|
Confirmation of steam situation at a reactor building of Fukushima Daiichi Nuclear Power Plant Unit 1
|
2011.5.10
|
Robots
|
2011.5.3
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.29
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.28
|
Robot, Truck etc.
|
2011.4.27
|
Movies taken from T-Hawk
|
2011.4.27
|
Site observation by the packbot in the nuclear reactor building of Unit 1
|
2011.4.20
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(video)
|
2011.4.19
|
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station(picture)
|
2011.4.17
|
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
|
2011.4.16
|
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
|
2011.4.15
|
A picture taken from T-Hawk, Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station
|