Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
![In front of instrumentation rack In front of instrumentation rack](/library/110620_1/110620_01.jpg)
![In front of instrumentation rack In front of instrumentation rack](/library/110620_1/110620_01.jpg)
In front of instrumentation rack
taken at 5 am on Jun 20,2011
![In front of instrumentation rack (floor) In front of instrumentation rack (floor)](/library/110620_1/110620_02.jpg)
In front of instrumentation rack (floor)
taken at 5 am on Jun 20,2011
![Truck bay door (floor) Truck bay door (floor)](/library/110620_1/110620_03.jpg)
taken at 5 am on Jun 20,2011
![Truck bay door Truck bay door](/library/110620_1/110620_04.jpg)
taken at 5 am on Jun 20,2011
![Stairs at truck bay door Stairs at truck bay door](/library/110620_1/110620_05.jpg)
taken at 5 am on Jun 20,2011
![Stairs at truck bay door (floor) Stairs at truck bay door (floor)](/library/110620_1/110620_06.jpg)
Stairs at truck bay door (floor)
taken at 5 am on Jun 20,2011
![Emergency exit 1 Emergency exit 1](/library/110620_1/110620_07.jpg)
taken at 5 am on Jun 20,2011
![Emergency exit 2 Emergency exit 2](/library/110620_1/110620_08.jpg)
taken at 5 am on Jun 20,2011
![Personnel doorway Personnel doorway](/library/110620_1/110620_09.jpg)
taken at 5 am on Jun 20,2011
![Airlock Airlock](/library/110620_1/110620_10.jpg)
taken at 5 am on Jun 20,2011
![West side of the airlock West side of the airlock](/library/110620_1/110620_11.jpg)
taken at 5 am on Jun 20,2011
![West side of the airlock (opening space of the airlock) West side of the airlock (opening space of the airlock)](/library/110620_1/110620_12.jpg)
West side of the airlock (opening space of the airlock)
taken at 5 am on Jun 20,2011
Category
■Search by status/measures
Status of the accident / Survey
■Pickup
Survey by robots