Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

Unit6

Upload dates
Title
2015.4.1 Fire from the Roadside Bank West of Units 5 and 6 on the Premises of Fukushima Daiichi Nuclear Power Station (Estimation of the Vehicle)
2015.3.24 Fire on the bank of the road on the west side of Units 5 and 6 in the premises of Fukushima-Daiichi Nuclear Power Station
2013.9.13 Water Leakage from the Washing Tank of RO Apparatus for Unit 5 and 6 at Fukushima Daiichi NPS
2013.7.25 Completion of Fuel Rack Inspection and Confirmation/Collection of Foreign Materials at Unit 6 Spent Fuel Pool at Fukushima Daiichi Nuclear Power Station
2013.7.23 Oil Leakage at Unit 6 Emergency Diesel Generator (B) in Fukushima Daiichi Nuclear Power Station
2013.5.29 A Foreign Material Found and Collected in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.5.24 A Foreign Material Found in Unit 6 Spent Fuel Pool at Fukushima Daiichi NPS
2013.4.8 Cutoff of the “Silt Fence Installed in Front of the Shallow Draft Quay to Prevent Fish From Moving Out” and the “Silt Fence Installed in Front of Units 5/6 Intake Canal”
2013.2.18 Water Leakage Near Units 5-6 Low Radioactive Level Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2013.2.1 Photos of the Accident at Fukushima Daiichi Nuclear Power Station (Publicized on February 1, 2013)
2012.12.25 Water Leakage Found Near Units 5-6 Low Radioactivity Density Accumulated Water Tank at Fukushima Daiichi Nuclear Power Station
2012.10.5 Water Leakage from Unit 6 Purification Equipment Pipe at Fukushima Daiichi Nuclear Power Station
2012.9.11 (19)Unit 6 Transformer Area
2012.9.11 (18)Unit 5 and 6 Ultraigh Voltage Switchyard Area (Inside)
2012.9.11 (16)Unit 5 and 6 Switchyard Area (Outside)
2012.9.11 (13)Inside the Unit 5 and 6 Vertical Shafts
2012.9.11 (12)Inside the Unit 6 Power Source Room
2012.9.11 (11)Inside the Unit 5 and 6 Transmission Board Room
2012.9.11 (10)Inside the Unit 5 and 6 Main Control Room
2012.9.11 (9)Sea side area of Unit 5 and 6
2012.7.3 Smoke Coming out of the Control Panel of the Compressed Air System (IA System) at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station (Follow-up)
2012.7.2 Smoke Coming out from the Compressed Air System (IA system) Control Panel at Unit 6 Turbine Building Basement at Fukushima Daiichi Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2011.10.24 Underwater imagery, Fukushima Daiichi Nuclear Power Station(Video)
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of spraying water after purification of accumulated water at Unit 5 and 6 of Fukushima Daiichi Nuclear Power Station on site
2011.9.24 Current Status of Fukushima Daiichi Nuclear Power Station in photos
2011.9.22 Fukushima Daichi Nuclear Power Station Inflow spot of rainwater in the basement of Turbine Building, Unit 6
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.9 Current situation of outdoor water exposure Fukushima Daiichi Nuclear Power Station
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS
2011.8.10 Pictures on "Initial Response of Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi and Fukushima Daini Nuclear Power Station"
2011.6.2 Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status - Place:Storage Area(North Side)
2011.5.31 Oil slick near the cartain wall of the Unit 5 and 6
2011.5.17 Fukushima Daiichi Nuclear Power Station Current status of restoration work

to TOP


  1. HOME
  2. Photo collection