Current Status of Fukushima Daiichi Nuclear Power Station in photos


Unit 5 High Pressure Coolant Injection System turbine(Reactor building B2F)
pictured on Aug 24,2011

Unit 5 residual heat removal system (RHR) pump (B)(D) (Reactor building B2F)
pictured on Aug 26,2011

Unit 5 Reactor building ceiling crane
pictured on Aug 25,2011

Condition at Unit 5 Primary Containment Vessel 2F
pictured on Aug 17,2011

Inside Unit 5 pedestal (reactor foundation)
pictured on Aug 17,2011

Unit 5 Emergency diesel generator (Turbine building B1F)
pictured on Aug 19,2011

Unit 5 Moisture seperator(3) (Turbine building B1F)
pictured on Aug 23,2011

Unit 5 Moisture separator drain pipe support(Turbine building B1F)
pictured on Aug 23,2011

Unit 5 High pressure turbine (Turbine building 2F)
pictured on Aug 23,2011

Unit 5 Boric acid injection pump (A)(Reactor building 4F)
pictured on Aug 19,2011

Unit 5 Control rod water pressure control unit (Reactor building 1F)
pictured on Aug 19,2011

Unit 5 Main steam isolation valve (Primary Containment Vessel 1F)
pictured on Aug 17,2011

Unit 6 residual heat removal system (RHR) pump (C) (Reactor building B2F)
pictured on Aug 18,2011

Unit 6 Emergency diesel generator (A) (Turbine building B1F)
pictured on Aug 19,2011

Unit 6 High Pressure Core Spray System diesel generator (Reactor building B1F)
pictured on Aug 19,2011

Unit 6 gas treatment System (A)(B) (Reactor building 3F)
pictured on Aug 19,2011

Unit 6 Low Pressure Core Spray System pump (Reactor building B2F)
pictured on Aug 18,2011

Unit 6 High Pressure Core Spray System pump (Reactor building B2F)
pictured on Aug 18,2011

Unit 6 Boric acid injection pump (A) (Reactor building 5F)
pictured on Aug 24,2011

Unit 6 High pressure condensate pump (Turbine building B1F)
pictured on Aug 23,2011

Unit 6 Reactor building ceiling crane
pictured on Aug 24,2011

Unit 6 feed water heater (Turbine building 1F)
pictured on Aug 25,2011

Unit 6 Low pressure turbine (Turbine building 2F)
pictured on Aug 23,2011

pictured on Aug 23,2011

pictured on Aug 23,2011

Unit 5 Circulating water pump (B)(C)
pictured on Aug 23,2011

pictured on Aug 23,2011

pictured on Aug 25,2011

pictured on Aug 25,2011

pictured on Aug 24,2011

Unit 5 Basement of Main exhaust stack
pictured on Sep 07,2011

Unit 5 Insulator cleaning tank
pictured on Aug 24,2011

Unit 6 High pressure core spray system Diesel generator Seawater system pump
pictured on Aug 23,2011

pictured on Aug 28,2011

pictured on Aug 22,2011

pictured on Aug 24,2011

pictured on Aug 22,2011

pictured on Aug 22,2011

pictured on Aug 22,2011