Photo collection

Photos / Videos search
You can use our photos and video footage free of charge as long as you give us the credit and content is not altered.

September 2011

Upload dates
Title
2012.9.10 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.7.11 Completion of Debris Removal from the Upper Part of Unit 4 Reactor Building at Fukushima Daiichi Nuclear Power Station
2012.6.26 Current Condition of Fukushima Daiichi Nuclear Power Station
2012.3.6 Removal Works of Debris on the Upper Part of the Reactor Building of Unit 4 in Fukushima Daiichi Nuclear Power Station
2012.3.2 Result of Visual Inspection of Inside of Primary Containment Vessels at Fukushima Daini Nuclear Power Station
2012.1.20 Current Status of Fukushima Daiichi Nuclear Power Station by photographs
2011.11.26 Series of Explanatory Videos Vol.3 No.2
2011.11.2 Overview of the blocking operation of the units 1 - 4 openings
2011.10.8 Status of Fukushima Daiichi Nuclear Power Plants shown in photos
2011.10.7 View of the cut trees from the northwest of Unit 5 and 6, Fukushima Daiichi Nuclear Power Plant
2011.10.1 Overview of Dust Collector System
2011.9.28 Fukushima Daiichi Nuclear Power Station Restoration work of permeation prevention structure at the south side of the intake canal of Unit 1 to 4
2011.9.28 JAEA-3, inside of Reactor Building of Unit 2, and Inside of Reactor Building of Unit 3, Fukushima Daiichi Nuclear Power Station
2011.9.27 Picture of mock-up test for covering Spent Fuel Pool to remove debris on the roof of Reactor Building at Unit 4, Fukushima Daiichi Nuclear Power Station
2011.9.24 Situation of Upper Part of Unit 2 Reactor Building, Fukushima Daiichi Nuclear Power Station
2011.9.22 Fukushima Daichi Nuclear Power Station Inflow spot of rainwater in the basement of Turbine Building, Unit 6
2011.9.20 Reporting from the grounds of Fukushima Daiichi Nuclear Power Station
2011.9.20 Water Leakage of Desalination Facilities (RO) on Fukushima Daiichi Nuclear Power Station
2011.9.17 Fukushima Daiichi Nuclear Power Plant Photo Collection
2011.9.17 Series of Explanatory Videos Vol.1 No.2
2011.9.13 Fukushima Daiichi Nuclear Power Station Dust Sampling at the Opening of Reactor Building of Unit 3
2011.9.12 A view of dust sampling at the upper part of the Reactor Building of Unit 1 at Fukushima Daiichi Nuclear Power Station
2011.9.11 TEPCO's President Toshio Nishizawa visits Fukushima Daiichi Nuclear Power Plant on September 11th, marking six months since the occurrence of the Tohoku-Chihou-Taiheiyo-Oki Earthquake
2011.9.10 Series of Explanatory Videos Vol.1 No.1
2011.9.10 Fukushima Daiichi Nuclear Power Station Dust sampling instrument for opening of Units 1 and 3 nuclear reactor buildings
2011.9.10 Unit 1, Fukushima Daiichi NPS, Construction of steel erection for cover of reactor building completed
2011.9.8 Enhancement of medical services at Fukushima Daiichi NPS

to TOP


  1. HOME
  2. Photo collection